You are on page 1of 64

© 2017 LVM3 - GSLV Mk III 1:96 Scale

Instruction Manual
Assembly of the fairing (both versions)

Assembly of the dummy Cryogenic Upper Stage (LVM3)

Assembly of the tank domes on LVM3 Upper Stage

Assembly of the C25 Cryogenic Upper Stage (GSLV Mk III)


Glue the interior wall covering the triangular sections.
Assembly of the engine section (all versions)

Joining the fairing with the upper stage


LVM3

GSLV Mk III

Assembly of solid rocket boosters

LVM3 GSLV MkIII


Adding the protective covers (Only for Launch Pad configuration)

Adding fuel line


LVM3 GSLV MkIII


Adding core and booster attachments
Reference Photos

www.axmpaperspacescalemodels.com

You might also like