ABSTRACT
This research project discusses the life-cycle analysis of wind turbines through the processing
of operational data from two modern European wind farms. A methodology for SCADA data
processing has been developed combining previous research findings and in-house experience
followed by statistical analysis of the results. The analysis was performed by dividing the
wind turbine into assemblies and the failures events in severity categories. Depending on the
failure severity category a different statistical methodology was applied, examining the
reliability growth and the applicability of the “bathtub curve” concept for wind turbine
reliability analysis. Finally, a methodology for adapting the results of the statistical analysis to
site-specific environmental conditions is proposed.
3
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
ACKNOWLEDGEMENTS
First of all, I would like to thank my supervisors Professor Bahri Uzunoglu and Mr. Filippos
Amoiralis for their support and encouragement throughout my research.
Additionally, I would like to thank all Mr. Eric Kamphues for giving me the opportunity to
carry out my research in MECAL Independent eXperts and his assistance during my staying
in MECAL.
I would also like to thank all my colleagues in MECAL Independent eXperts and the other
departments of MECAL for always being willing to answer my questions and add to my
thesis with their knowledge and experience.
Following, I would like to express my gratefulness to my family for their continuous love and
support the last 25 years of my life.
I would also like to thank all the teachers and personnel in Uppsala University (Campus
Gotland) for contributing to my theoretical tuition and personal development during my
Master’s studies.
Last but not least, I would like to thank each and every one of my classmates in the Wind
Power Project Management 2012-2013 Master’s Programme for making my staying in Visby
so memorable and full of precious moments.
4
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
NOMECLATURE
5
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
TABLE OF CONTENTS
ABSTRACT ...........................................................................................................................3
ACKNOWLEDGEMENTS ....................................................................................................4
NOMECLATURE ..................................................................................................................5
LIST OF FIGURES ................................................................................................................8
LIST OF TABLES .................................................................................................................9
1 Introduction ..................................................................................................................10
2 Basics of reliability theory ............................................................................................13
2.1 Definitions .............................................................................................................13
2.2 Statistical tools in reliability engineering ................................................................14
2.2.1 Probability distributions ..................................................................................14
2.2.2 Point process ...................................................................................................18
3 Previous research on wind turbine reliability .................................................................20
3.1 Reliawind ...............................................................................................................20
3.2 WMEP ...................................................................................................................21
3.3 Swedish wind turbine statistics ...............................................................................22
3.4 Finnish wind turbine statistics ................................................................................23
3.5 WindStats (Germany & Denmark)..........................................................................24
4 WTG Operational Data .................................................................................................26
4.1 General wind farm information & Operational data types .......................................26
4.1.1 General information ........................................................................................26
4.1.2 O&M Data ......................................................................................................27
4.1.3 Additional sources of information ...................................................................28
4.2 Dataset for current research ....................................................................................28
5 Data processing ............................................................................................................29
5.1 Taxonomy selection for failure data........................................................................29
5.1.1 ReliaWind taxonomy description.....................................................................29
5.2 Failure definition ....................................................................................................30
5.3 SCADA data processing algorithm .........................................................................32
5.3.1 Turbine State ...................................................................................................33
5.3.2 Short Running Periods.....................................................................................34
5.3.3 Event Indicators ..............................................................................................34
5.3.4 Downtime Events ............................................................................................36
5.3.5 Alarm Logs .....................................................................................................37
5.3.6 Failure division to WTG assemblies ................................................................38
6 Failure statistical analysis .............................................................................................41
6
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
7
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
LIST OF FIGURES
Figure 1. Global annual installed wind capacity 1996-2012, (GWEC, 2013) ...................................... 10
Figure 2. Global cumulative installed wind capacity 1996-2012, (GWEC, 2013) .............................. 10
Figure 3. Typical cost breakdown for an offshore wind farm in shallow water, (Zhang, et al., 2012). 11
Figure 4. Relation between MTBF, MTTF & MTTR (Tavner, 2009) .................................................... 14
Figure 5. Distribution function F(t) and probability density function f(t), (Rausand & Høyland, 2004)
............................................................................................................................................................... 15
Figure 6. Reliability function, (Rausand & Høyland, 2004) ................................................................. 15
Figure 7. Repairable system failures with interarrival times t, (Reliability EDGE, 2004) ................... 17
Figure 8. Times to failure of a non-repairable system, (Reliability EDGE, 2004) ............................... 17
Figure 9. Normalized failure rate of assemblies - Reliawind, (Wilkinson & Hendriks, 2011) ............. 20
Figure 10. Normalised hours lost per turbine per year for assemblies - Reliawind, (Wilkinson &
Hendriks, 2011) ..................................................................................................................................... 21
Figure 11. Share of main components of total number of failures - WMEP, (Hahn, et al., 2006)........ 21
Figure 12. Failure frequency and downtimes of components - WMEP, (Hahn, et al., 2006) ............... 22
Figure 13. Distribution of number of failures for Swedish wind power plants (2000-2004), (Ribrant &
Bertling, 2007)....................................................................................................................................... 22
Figure 14. Percentage of downtime per component in Sweden (2000-2004), (Ribrant & Bertling,
2007)...................................................................................................................................................... 23
Figure 15. Distribution of number of failures - Finland, (Stenberg & Holttinen, 2010) ...................... 23
Figure 16. Distribution of downtime - Finland, (Stenberg & Holttinen, 2010) .................................... 24
Figure 17. Variation of the failure rates of WTG assemblies for the two populations, (Tavner, et al.,
2007)...................................................................................................................................................... 24
Figure 18. Reliability growth curve using the PLP for the two populations, (Tavner, et al., 2007) ..... 25
Figure 19. Reliability characteristics for different subassemblies in the WMEP programme dividing
faults into minor and major failures (Faulstich, et al., 2010) ............................................................... 31
Figure 20. Possible states of a WTG ..................................................................................................... 33
Figure 21. Event Indicators when the WTG state changes ................................................................... 35
Figure 22. Downtime event categorization ........................................................................................... 36
Figure 23. Overview of the process ....................................................................................................... 40
Figure 24. Results - Normalized failure frequency for wind turbine assemblies (including only
identified failures) ................................................................................................................................. 41
Figure 25. Normalized downtime for wind turbine assemblies (including only identified failures) ..... 43
Figure 26. The bathtub curve shape of failure rate over time for a system's lifetime, (Rausand &
Høyland, 2004) ...................................................................................................................................... 45
Figure 27. Main shaft set failure rate plot, (Andrawus, 2008) ............................................................. 46
Figure 28. Failure occurrence for 2 operational wind farms, (Buckley, 2013) .................................... 46
Figure 29. Failure rate function plot, Manual Restarts ........................................................................ 48
Figure 30. Failure rate function plot, Minor Repairs ........................................................................... 49
Figure 31. Failure rate function plot, Minor Repair - Pitch system ..................................................... 49
Figure 32. Weibull plot for major failures of Frequency converters of wind farm A ........................... 50
Figure 33. Weibull plot for major failures of Pitch system of wind farm A .......................................... 51
Figure 34. 10-minute SCADA database analysis showing failure rate and downtime as function of
Mean wind speed, (Wilkinson, et al., 2012) .......................................................................................... 53
Figure 35. 10-minute SCADA database analysis showing failure rate and downtime as function of
average Turbulence intensity, (Wilkinson, et al., 2012) ........................................................................ 53
Figure 36. Failure rate function plot, Manual restarts - Target wind farm.......................................... 56
8
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
LIST OF TABLES
Table 1. Relationship between F(t), R(t), f(t) and λ(t), (EPSMA, 2005)................................................ 16
Table 2. General wind farm information............................................................................................... 26
Table 3. Alternative sources of information .......................................................................................... 26
Table 4. O&M Data types and info derived .......................................................................................... 27
Table 5. Additional sources of information ........................................................................................... 28
Table 6. Dataset used for this project ................................................................................................... 28
Table 7. Examples of the ReliaWind taxonomy ..................................................................................... 30
Table 8. Failure severity categories ...................................................................................................... 32
Table 9. Example of turbine state definition according to SCADA counters ........................................ 34
Table 10. Example of ignored short running period for a detected event ............................................. 34
Table 11. Example of event indicators .................................................................................................. 35
Table 12. Example of Repairing action ................................................................................................. 36
Table 13. Example of failure analysis results for one wind turbine ...................................................... 38
Table 14. Results - Normalized failure frequency (over the total number of failure events) ................ 42
Table 15. Normalized downtime for wind turbine assemblies (over the total number of failure events)
............................................................................................................................................................... 43
Table 16. PLP model parameters for Manual Restarts ......................................................................... 47
Table 17. PLP model parameters for Minor Repairs ............................................................................ 48
Table 18. PLP model parameters, Minor repair - Pitch system............................................................ 49
Table 19. Parameters of PLP model for manual restarts & environmental conditions ........................ 55
9
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
1 Introduction
The usage of wind to generate energy has its roots thousand years ago when it was used for
domestic purposes such as milling grain. The electricity generation from wind started in the
beginning of the previous century but it was only after the 80’s that large-scale production
projects would be realized (Boyle, 2004). The following decades the wind power sector has
shown a continuous growth with the global installed capacity growing every year since 1996
as shown in Figure 1 and the global installed capacity approaching 300GW (Figure 2).
With the continuous growth of wind power efforts have been made to optimize the cost of all
the aspects constituting a wind power project (Figure 3). In general, O&M costs constitute a
sizeable share of the total annual costs of a WT. For a new machine, O&M costs might easily
have an average share over the lifetime of the turbine of approximately 20%-25% of total
levelized cost per kWh produced – as long the WT is fairly new, the share might constitute
10%-15% increasing to at least 20%-35% by the end of its life (EWEA, 2010).
10
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Cost Breakdown
2%
15% Management
Turbine
33%
Decommissioning
23% Support structure
O&M
Grid connection
24% 3%
Figure 3. Typical cost breakdown for an offshore wind farm in shallow water, (Zhang, et al., 2012)
The estimation of the cost of some aspects of O&M is straight forward (e.g. scheduled
service) but for the unscheduled service and the spare parts replacements the prediction
becomes more complicated. This leads OEMs (Original Equipment Manufacturers), Research
institutes and wind energy consultancies to develop estimation tools for the estimation of
O&M cost. One of these tools was developed by MECAL B.V.
The MECAL O&M Cost Forecasting Model is a probabilistic model that provides insights in
the estimated future wind farm O&M Costs. The Model has been developed by combining
years of experience from operations, maintenance, performance monitoring, and wind farm
development. During the modelling a most reliably as possible scenario is analysed to
simulate the real world. The model is based on the Monte Carlo Simulation and provides
guidance during O&M strategy development. Based on a large set of inputs, the Model
performs a multiple number of iterations which results are then combined to provide a range
of the probable outcomes.
The thesis is addressing the multi-variable modelling of MECAL’s O&M Cost Forecasting
Model. The focus of the project is to develop and implement a methodology performing the
following main tasks:
11
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Thesis overview
Chapter 2
In this chapter the theoretical background of the current research is presented. Initially, the
definitions of the key terms used are provided. Following, basic elements of statistics and
their application in reliability engineering are presented.
Chapter 3
This chapter provides a brief description of previous research on wind turbine reliability
focusing on research topics that have used a quantitative approach, i.e. analysing operational
data from real wind farms. The main findings of each research project are presented in this
chapter some of which will be later on used for comparison with the results of the current
research.
Chapter 4
In this chapter the operational data types available for a wind farm are initially presented. A
brief explanation of the information but also the disadvantages and problems that may occur
by using each data type is derived. Following, information of the dataset used for the analysis
in this research project is provided.
Chapter 5
For the extraction of failure information from 10-minute SCADA data an algorithm was
developed in VBA (Visual Basic for Applications). In this chapter a detailed description of
the steps followed for the development of the SCADA data processing algorithm is provided.
Initially, the selection of the Wind turbine taxonomy is justified. Following, the key points of
the methodology are explained. Additionally, other sources of operational data that have been
used for verification of the algorithm are mentioned.
Chapter 6
The extraction of failure information from SCADA data, as developed in the previous chapter,
is followed by the statistical analysis of the results. Initially, overall cumulative results
concerning the failure occurrence and downtime for each turbine assembly are presented in
this chapter. Following, the different statistical methodologies used depending on the failure
type are described.
Chapter 7
Recent research has been carried out in order to define the impact of environmental factors on
WTG reliability. In this chapter an overview of the findings of this research is provided.
Additionally, an effort to adapt the results of the statistical analysis performed in the previous
chapter to case specific analysis according to the different environmental conditions is
presented.
Chapter 8
In the final chapter the findings of this research project are summarized, the main conclusions
are presented, the limitations of the scope of work are pointed out and suggestions for future
research based on the present one are made.
12
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Chapter summary
In this chapter the theoretical background of the current research is presented. Initially, the
definitions of the key terms used are provided. Following, basic elements of statistics and
their application in reliability engineering are presented.
2.1 Definitions
The definitions for this section were adopted from the two following reports where the reader
can refer for a wider list of definitions. In this list only the definitions of the terms used in this
project are included.
Reliability: The probability that it will perform its required function under stated conditions
for a specified period of time (Spinato, et al., 2009).
Failure: The inability of a subassembly to perform its required function under defined
conditions; the item is then in a failed state, in contrast to an operational or working state
(Spinato, et al., 2009).
Failure Mode and Effects Analysis: Analysis used to determine what parts fail, why they
usually fail and what effect their failure has on the system (Barbati, 2009).
Repair action: Can be an addition of a new part, exchange of parts, removal of a damaged
part, changes or adjustment to settings, software update, lubrication or cleaning (Spinato, et
al., 2009).
Repairable system: A system that, when a failure occurs, can be restored into operational
condition after any action of repair, other than replacement of the entire system. Examples of
repairable systems are WTs, car engines, electrical generators and computers (Spinato, et al.,
2009).
Mean time between failures: This term defines the mean time between failures expressed in
hours of operations for a specific module population. It does NOT mean that a module will
operate for that many hours before failure (Barbati, 2009).
Mean time to failure: This value is very similar to MTBF and is used when evaluating non-
repairable systems. MTBF assumes that a device is to experience multiple failures in a
lifetime, and after each failure a repair occurs. For non-repairable systems, there is no repair.
Therefore, in the lifetime of a non-repairable device, the device fails once and MTTF
represents the average time until this failure occurs (Barbati, 2009).
13
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Mean time to repair: This term defines the expected mean value of an item’s repair time
(Barbati, 2009).
Manual Restart: Failure event that requires the physical presence of crew at the turbine, in
order to reset the turbine controller after it has been tripped by an alarm (Wilkinson &
Hendriks, 2011).
Minor Repair: Failures caused by minor faults, typically involving sensor or instrumentation
failure. Replacement of small parts may be necessary as may some level of trouble-shooting
in order to isolate the problem (Wilkinson & Hendriks, 2011).
Major Repair: Failure for which more extensive work is required, usually to one of the major
mechanical components of the turbine (Wilkinson & Hendriks, 2011).
The main references for this overview of engineering statistics where the reader can refer for
further viewing are:
If the time to failure T is continuously distributed the cumulative distribution function is:
( ) = Pr( ≤ ) = ( ) >0
( )= ( )
A schematic description of the cumulative distribution function and the probability density
function is given in Figure 5.
Figure 5. Distribution function F(t) and probability density function f(t), (Rausand & Høyland, 2004)
( )
( )=
( )
The relationship between the distribution function, the probability density function, reliability
function and failure rate function is illustrated in
15
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Table 1. Relationship between F(t), R(t), f(t) and λ(t), (EPSMA, 2005)
The Weibull distribution was invented in 1937 by the Swedish scientist Waloddi Weibull and
it has been applied to several engineering problems since then. Some of the advantages of the
Weibull distribution are (Abernethy, 2001):
The ability to provide reasonably accurate failure analysis and failure forecasts with
small data samples
It provides a simple and useful graphical plot
It can be useful even with inadequacies in the data
For the Weibull distribution the distribution function is (Rausand & Høyland, 2004):
( ∙ )
( ) = Pr( ≤ ) = 1 −
( )= ( ∙ )
∙ ∙ ∙
( )= ( ∙ )
( )= ∙ ∙
Where λ (lamda) is the scale parameter and α (alpha) the shape parameter.
16
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
subsequently been replaced by a new component (Crow, 2004). Given these conditions, the
Weibull distribution (or other distribution types) is suitable for reliability analysis of non-
repairable systems. One of the common mistakes is analysing inter-arrival data of failures for
repairable systems (Reliability EDGE, 2004). The difference between time to failure for non-
repairable systems and inter-arrival time of failures of repairable systems is shown in Figure 7
& Figure 8.
Figure 7. Repairable system failures with interarrival times t, (Reliability EDGE, 2004)
The exponential distribution can be considered a special case of the Weibull distribution for
shape parameter α=1. By replacing α=1 in the equations presented above for the Weibull
distribution (Rausand & Høyland, 2004):
( )= ∙
∙
Reliability function:
( )= ∙
( )=
17
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
A point process is a stochastic model describing the occurrence of discrete events in time or
space. In reliability analysis, failures of repairable systems can be described with point
processes (Tavner, 2012).
A random variable N(t) that represents for example the number of failure events in the
interval [0,t] is called the counting random variable. Subsequently, the number of events in
the interval (a,b] will be:
( , ]= ( )− ( )
The point process mean function Λ(t) is the expected number of failures in the interval
throughout time t:
( ) = [ ( )]
The rate of occurrences μ(t) is the rate of change of expected number of failures:
( )
( )=
1. (0) = 0
2. { ( ), ≥ 0} ℎ
3. Pr ( + )– ( )≥ 2 = ( )
4. ( ( + )– ( ) = 1) = ( ) + ( )
The Power Law Process (also called AMSAA model) is a non-homogenous Poisson process
for which the rate of occurrence is (NIST/SEMATECH, 2012):
( )= ∙ ∙
This model became popular for reliability analysis for several reasons some of which are
mentioned below (Crow, 2004):
18
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
It introduces the concept of minimal repair. In a system with several failure modes, the
repairing action for a single failure mode is considered to bring the system to the state
it was before the failure (or to an “as-bad-as-old” state).
If the time to the first follows the Weibull distribution (with shape parameter β and
scale parameter λ) each succeeding failure follows the Power Law model assuming a
minimal repair. For this reason the Power Law model is also called Weibull Process,
though this name should be avoided as it can create misconceptions
(NIST/SEMATECH, 2012).
It is easy to use and understand.
For the Power Law the waiting time to the next failure, given a failure at time T, has
distribution function (NIST/SEMATECH, 2012):
∙[( ) ]
( ) = 1−
A general maximum likelihood estimation for the parameters of the Power Law model is
given by Crow in the AMSAA report No. 138 (Crow, 1975). The parameters (β,λ) are
calculated by the equations:
∑
=
∑ ( − )
∑
=
∙∑ [ ∙ − ∙ ]−∑ ∑ ( )
: ℎ
: ℎ ℎ
: ℎ ℎ
: ℎ
: ℎ ℎ ℎ ℎ
19
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
3.1 Reliawind
The Reliawind project is among the most recent research project on wind turbine reliability
finalised in 2011 with the participation of major wind turbine manufacturers, operators and
research institutes (Gamesa, Alstom and GL Garrad Hassan to mention some) (Reliawind,
2011). The database of Reliawind contained (in the last update released) data from around 350
operating WTGs of rated power larger than 850kW for varying periods of time;
approximately 35000 downtime events have been identified (Wilkinson, et al., 2011). In
Figure 9 & Figure 10 are shown the normalised results of Reliawind concerning the failures of
wind turbine assemblies.
Figure 9. Normalized failure rate of assemblies - Reliawind, (Wilkinson & Hendriks, 2011)
20
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 10. Normalised hours lost per turbine per year for assemblies - Reliawind, (Wilkinson & Hendriks, 2011)
3.2 WMEP
The Wind Measurement & Evaluation Programme (WMEP) was of the most direct and
sizeable efforts to monitor wind turbine reliability with the participation of 1467 WTGs in the
period from 1989 until the end of 2004 (Langniss, 2006). The rated power of the majority of
the wind turbines participating in the programme was below 1MW (Hahn, et al., 2006). A
detailed table with all the turbines participating in WMEP is given in APPENDIX II.
In Figure 11 & Figure 12 the main results of WMEP concerning the failure frequency and
downtime of components are presented.
Figure 11. Share of main components of total number of failures - WMEP, (Hahn, et al., 2006)
21
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 12. Failure frequency and downtimes of components - WMEP, (Hahn, et al., 2006)
A reliability study for Swedish wind power plants during the period 1997-2005 was carried
out as part of the research of the Royal Institute of Technology of Stockholm on wind turbine
O&M (Ribrant, 2006). The research contained data from 723 wind turbines from Sweden and
apart from the general reliability analysis gave a closer insight to gearbox failures which were
considered critical because the long downtime per gearbox failure found in the initial results
(Ribrant & Bertling, 2007). The main results concerning failure frequency and downtimes are
shown in Figure 13 & Figure 14.
Figure 13. Distribution of number of failures for Swedish wind power plants (2000-2004), (Ribrant & Bertling, 2007)
22
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 14. Percentage of downtime per component in Sweden (2000-2004), (Ribrant & Bertling, 2007)
In Finland, an effort to monitor the failures of the country’s wind turbines was made by VTT.
In this research project data from 72 operating wind turbines of Finland between the years
1996-2008 were used. The results of the project show the percentage of failures and downtime
for each wind turbine component. Additionally, an effort to distinguish the main root causes
for failures is made (Stenberg & Holttinen, 2010). The overall results are presented in
Figure 15 & Figure 16.
Figure 15. Distribution of number of failures - Finland, (Stenberg & Holttinen, 2010)
23
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Efforts were made to analyse failure data gathered from the Windstats newsletter. Windstats
Newsletter is a quarterly international wind energy publication with news, reviews, and WT
production and operating data from thousands of WTs published as a supplement to the
magazine Windpower Monthly (Faulstich, et al., 2009). The data contained wind turbines
from Germany and Denmark and were analysed separately for each country. The overall
results are presented in Figure 17. Apart from general results, the Windstats data were used
for statistical analysis using the Power Law process in order to track the reliability growth of
the wind turbines in Germany and Denmark as shown in Figure 18.
Figure 17. Variation of the failure rates of WTG assemblies for the two populations, (Tavner, et al., 2007)
24
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 18. Reliability growth curve using the PLP for the two populations, (Tavner, et al., 2007)
25
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
General information about the wind farms is also needed in order to classify failures through
operational data. The information needed and its functionality is presented in Table 2.
Information Functionality
Number of WTGs in wind
farm
Wind farm/Wind turbine Rated power
Failure classification
info
Manufacturer
Components type
Monthly mean wind speed
Connect Failures-Environmental
Site conditions Turbulence intensity
Conditions
Terrain roughness
O&M provider
Other O&M Evaluation
Quality of service
Table 2. General wind farm information
For some of the elements mentioned above, alternative methods to derive information are
proposed in Table 3.
26
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
a) Maintenance logs
b) Operation & Alarm logs
c) 10-minute SCADA& Alarms
d) Questionnaire
e) Service provider bills
f) Component purchase bills
In Table 4 the above mentioned O&M data forms are sorted in priority order (starting from
the most useful), followed by the information that can be derived and the drawbacks of each
one.
27
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Concerning 10-minute SCADA, in order to avoid a large amount of data that is difficult to be
transferred and processed specific columns can be requested instead of the whole data set.
More specifically, the following columns of the SCADA data contain the information initially
needed for the present research:
For this project, SCADA data from two European wind farms were provided from MECAL
B.V. The WTG type, population and time length of data are different for the two wind farms.
Due to confidentiality reasons, details about the location, turbine manufacturer and type will
not be provided. The two wind farms will be named as A & B. It should be also mentioned
that for wind farm B the time length of the data was not the same for all the turbines.
Information concerning the dataset used is presented in Table 6.
Wind farm Number of WTGs Rated Power (kW) Days of data Turbine*days
A 23 3000 944 21712
B 36 850-1750 760 25381
Table 6. Dataset used for this project
28
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
5 Data processing
For the extraction of failure information from 10-minute SCADA data an algorithm was
developed in VBA (Visual Basic for Applications). In this chapter a detailed description of the
steps followed for the development of the SCADA data processing algorithm is provided.
Initially, the selection of the Wind turbine taxonomy is justified. Following, the key points of
the methodology are explained. Additionally, other sources of operational data that have been
used for verification of the algorithm are mentioned.
Wind turbine taxonomy is a structure that names the main features of a WTG in a
standardised terminology (Tavner, 2011). The definition of a taxonomy before starting a
WTG reliability research project is necessary in order to de fine accurately failure locations
and also describe turbines from different WTG manufacturers in a common way (Wilkinson,
2011). There have been several efforts of developing a Wind turbine taxonomy differing on
their principal structure and level of detail. The main criteria for the development of these
taxonomies have been the information availability (so that the level of detail of the taxonomy
will correspond to the level of detail of the information available) and the function of each
component with the components performing the same function grouped together (Ribrant,
2006).
For this research the taxonomy developed for the ReliaWind project will be used. The reasons
for this selection were the following:
The ReliaWind taxonomy was developed in order to focus on SCADA and Service
Log data (Tavner, 2011, p. 9), a fact that meets the needs of this project which will
focus on SCADA data and Alarm Logs for reliability analysis.
It divides the WTG in categories of various detail (with the most detailed level
containing 257 WTG components) offering the potential of statistical analysis in a
more detailed level when the amount and accuracy of operational data will permit.
It was developed with the assistance of two major WTG operators (GL Garrad Hassan
and Eon Climate and Renewables) indicating that it will be widely used in the future.
It should be mentioned that there is also another wind turbine taxonomy with high level of
detail developed by Sandia National Laboratories (Peters, et al., 2009). The reason that the
ReliaWind taxonomy was preferred is that it was also applied in data analysis in the context
of the ReliaWind project.
The ReliaWind taxonomy is structured based on the following guidelines (Tavner, 2011):
The taxonomy includes all the WTG concepts components in 5 levels, namely:
o System
o Sub-System
o Assembly
o Sub-Assembly
29
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
o Component
A hybrid approach is applied for the components grouping; signalling, supervisory and
control components are grouped according to their function and mechanical
components are grouped according to their position in the WTG.
The taxonomy characteristics described above are clarified in the examples shown in Table 7.
The mechanical components are grouped according to their position (e.g. all the components
of the gearbox are grouped together) and the electrical components according to their function
(e.g. all the sensors placed in different locations of the turbine are grouped together in the
Control & Communication System assembly).
The full Wind turbine taxonomy enriched with reference numbers in order to make it more
easily used can be found in APPENDIX I.
Failure is defined to be the inability of a subassembly to perform its required function under
defined conditions; the item is then in a failed state, in contrast to an operational or working
state (Spinato, et al., 2009). Moving from the general definition to implementing a reliability
study limits should be customized in order to be precise on what will be considered a failure.
In recent WTG reliability projects the limitations stated for a downtime event to be considered
a failure were (Wilkinson, 2011) :
Other researchers have tried to quantify the severity of a failure event according to the
duration of the failure event by dividing failures in minor (duration ≤ 1 day) and major
(duration > 1 day) considering that for a failure event of duration longer than 1 day the service
team will travel at least twice to the site (Faulstich, et al., 2010). An example with results of
failure separation in minor and major is shown in Figure 19.
30
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 19. Reliability characteristics for different subassemblies in the WMEP programme dividing faults into minor
and major failures (Faulstich, et al., 2010)
For the purposes of this project the following criteria were set in order to consider a downtime
event as a failure:
The downtime event is due to a technical problem of the WTG, thus downtime
events due to environmental conditions (e.g. extreme wind or no low wind) or grid
problems are not counted as failures
Human intervention is required to set the turbine back to operational state
The main difference compared to previous researchers, this project does not pose any duration
limit to the failure events, i.e. failure events of total downtime ≤ 1 hour that required a manual
restart are also taken into consideration. The reason for that is that failure events that require
only a manual restart and can possibly last less than 1 hour (for an onshore and easily
accessible wind farm) can be considered insignificant onshore but can cause long downtimes
offshore were accessibility is a major issue. Since MECAL’s O&M cost model is designed
also for offshore wind farms it was decided to include also these events. As a result, the
failure occurrence is expected to be higher compared to other WTG reliability research
projects.
For the division of the failures to severity sub-categories the initial logistic delay (i.e. the time
needed from the start of the failure event until the technician reaches the WTG) is ignored and
only the service time is taken into consideration. With these assumptions the failure events are
divided to 3 severity categories as shown in Table 8.
31
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Service Time
Manual Restart ≤ 1 hour
Minor Repair 1 hour ≤ Service Time ≤ 8 hours
Major Repair ≥ 8 hours
Table 8. Failure severity categories
The time limits were decided in cooperation with the WTG inspection team of MECAL
(Timessen & Links, 2013). 1 hour was considered as the time needed to perform a visual
check of the turbine and a manual restart without any repairing action. The division between
Minor and Major repair was made under the assumption that a repair that needs the technician
crew to be present for more than a working day (i.e. 8 hours) is a Major one. Any repairing
action that can be performed within a working day is considered a Minor repair.
The same titles for the severity categories are introduced in the ReliaWind project (Tavner,
2011, p. 13) as “Maintenance Categories” also with the presence of a fourth category called
“Major Replacement” based on the military standard for FMEC analysis MIL-STD-1629A
(U.S. Department of Defense, 1980) . The definition of the maintenance category in
Reliawind implies that detailed information concerning the maintenance activities was
available. Since the present research focuses on SCADA data an effort has been made to
quantify the limits for the severity categories. Additionally, the fourth category (Major
Replacement) defined in Reliawind requires maintenance activities information and is not
possible to be identified only through the analysis of SCADA data.
For this research project 10-minute SCADA data in combination with the relevant alarm logs
were processed in order to extract the failure events of operational wind farms and perform
further statistical analysis. More specifically, the following columns of the 10-minute SCADA
data were used:
SCADA counters
o Turbine OK counter
o Service On counter
o Alarm counter
Timestamp
Power generated
Average wind speed
For the data processing an algorithm was developed with the use of Visual Basic for
Applications and Microsoft Excel 2010. The algorithm processes the 10-min SCADA data, it
defines the failure events by combining the information with the alarm logs. The final result is
the processed information for the failure events in a given period of time divided according to
32
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
their severity and the assembly where they occurred. A step-by-step description of the
algorithm is provided in the following sections.
Initially, the algorithm defines the state of the WTG according to the SCADA counters. The
SCADA counters are indications showing how many seconds the WTG was in each state
(Operational, Alarm and Service) in every 10-minute span (thus taking values from 0 to 600);
a relevant example is provided in Table 9. The 3 possible states that a WTG can be in are:
The distinction between these different turbine states is mainly based on the SCADA counters
but there are some special cases that are treated in a different way. They can be summarized
as:
One of the alarm descriptions that appear when the WTG is in alarm state (according
to the SCADA counters) is “Pause pressed on keyboard”. In this case the algorithm
inserts a correction and the turbine is considered to be in service state since the
description indicates the presence of a technician in the turbine.
There are cases when the WTG appears to be operating normally according to the
SCADA counters (i.e. Turbine OK = 600), the wind speed is between cut-in and cut-
out but the WTG is not generating energy. In these cases, the turbine is considered to
be in Alarm state.
33
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
SCADA Columns
Wind Farm WTG # TimeStamp Turbine OK counter Service On Alarm Turbine State
2009-06-01 09:50 600 0 0 Operating
2009-06-01 10:00 600 0 0 Operating
2009-06-01 10:10 100 0 500 Alarm
2009-06-01 10:20 0 0 600 Alarm
2009-06-01 10:30 0 0 600 Alarm
2009-06-01 10:40 0 400 200 Service
2009-06-01 10:50 0 600 0 Service
Table 9. Example of turbine state definition according to SCADA counters
As Short Running Periods are defined the situations when the WTG is in alarm state for a
period of time, briefly operates again, returns to alarm state and eventually starts operating
normally again. After examining some of these cases and comparing them with the relevant
maintenance logs we concluded that the alarm periods that are interrupted by short running
periods in most of the cases belong to the same failure event. Thus, the short running periods
are ignored and the events (Alarm or Service) before and after are merged. The example in
Table 10 illustrates description above. The maximum duration of a short running is one hour.
Other authors mention similar events as “Back-to-back” events and consider them as separate
failure events (Peters, et al., 2012).
SCADA Columns
Wind Farm WTG # TimeStamp Turbine OK counter Service On Alarm Turbine State Flag
2010-06-27 03:00 0 0 600 Alarm
2010-06-27 03:10 0 0 600 Alarm
2010-06-27 03:20 100 0 500 Alarm
2010-06-27 03:30 600 0 0 Operational Short Run
2010-06-27 03:40 600 0 0 Operational Short Run
2010-06-27 03:50 249 0 351 Alarm
2010-06-27 04:00 0 0 600 Alarm
Table 10. Example of ignored short running period for a detected event
As Event Indicators are defined the moments when the WTG changes from one state to
another. Depending on the initial and final state a different event indicator occurs. The event
indicators are defined as:
34
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
In the scope of this research the total downtime is divided into “Alarm duration” and “Service
duration”. As alarm duration is defined the initial logistic delay time, i.e. the time needed
from the moment the WTG stops until the first human intervention (Service state). When the
WTG state changes to Service then the assumption that the repairing action lasts until the
turbine starts operating normally again is made. For this reason, there is no event indicator for
the state change from Service to Alarm state. Even though Service to Alarm can be observed,
this does not indicate that the service action is terminated. An example is shown in Table 12.
Making this assumption information concerning logistic delay after the first service action
(e.g. waiting time for spare parts, technicians unavailability) cannot be distinguished. Thus,
the actual repairing time is possibly shorter than what is estimated as “Service duration”.
35
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
SCADA Columns
Wind Farm WTG # TimeStamp Turbine OK counter Service On Alarm Turbine State Flag
2011-12-30 19:50 600 0 0 Operational
2011-12-30 20:00 146 0 454 Alarm
2011-12-30 20:10 0 0 600 Alarm
2011-12-30 20:20 0 0 600 Alarm
2011-12-30 20:30 0 0 600 Alarm
2011-12-30 20:40 0 102 498 Service Repairing
2011-12-30 20:50 0 600 0 Service Repairing
2011-12-30 21:00 0 600 0 Service Repairing
2011-12-30 21:10 0 500 100 Service Repairing
2011-12-30 21:20 0 0 600 Alarm Repairing
2011-12-30 21:30 0 0 600 Alarm Repairing
2011-12-30 21:40 0 360 240 Service Repairing
2011-12-30 21:50 0 600 0 Service Repairing
2011-12-30 22:00 0 600 0 Service Repairing
Table 12. Example of Repairing action
The purpose of defining the event indicators was to be able to distinguish and categorize the
downtime events that occurred during the period the SCADA data of which is examined. The
categorization of the downtime events by the algorithm developed is presented in Figure 22.
The different types of downtime events are defined according to the event indicators as
following:
Failure (Pause Start – Pause End / Service Start – Service End): A failure event starts
when the turbine state changes to Alarm (Pause Start) followed by a downtime period
36
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
until human intervention is detected (Pause End / Service Start) and ending when the
WTG starts operating again.
o The duration between Pause Start and Pause End / Service Start is defined as
“Alarm duration”
o The duration between Pause End / Service Start and Service is defined as
“Service duration”
o The distinction of the failure events in Manual Restart, Minor Repair & Major
Repair is given in Table 8.
Auto-Restart (Pause Start – Pause End): Downtime event which is solved by the
WTG itself or with a remote restart, without the natural presence of a technician
needed.
Scheduled Service (Service Start – Service End): Downtime event during which the
turbine was in service state without any alarm
The Automatic Restarts and Scheduled Services are not counted as failures and will not be
part of the statistical analysis that will follow. Though, they can be used for further research
topics (e.g. Maintenance planning, Connection between the frequency of automatic restarts
and failure events).
The 10-minute SCADA data are used as described in the previous sections of this chapter in
order to define the failure events and categorize them according to their duration. Alarm logs
contain additional information concerning the kind of the failures through the alarm numbers
and descriptions provided by WTG Control and Communication System. The columns used
from the Alarm log are:
In order to connect the information extracted from the 10-minute SCADA data with the alarm
logs some data modifications were needed. The timestamp of the alarm log is given in
accuracy of 1 minute while the SCADA has 10-minutes accuracy. For this reason, the alarm
log timestamp was rounded-up to the next 10 minutes timestamp they have different
frequency measurements. For each failure event the alarm that initiated the event is
considered responsible for the failure, which means that the assembly from which the WTG
Control system received a signal is considered the one that have failed. As pointed out also by
other researchers, the fact that a failure occurred in a component does not necessarily mean
that the component itself is responsible for the failure (Tavner, et al., 2007). Further research
that exceeds the scope of this project would be needed to identify the root cause of each
failure.
There have been cases that the 10-minute time span when a failure event occurred did not
agree with the alarm log indication. In these cases the previous and next 10-minutes span was
examined. If there still was no match the failure event defined by the SCADA data processing
was marked as “Unknown”.
37
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
The categorization of the failure events to the different parts of the WTG that they occurred
was decided to be made at the assembly level of the taxonomy that was selected. The reasons
for this choice are:
The available data for this project would not be enough to have enough failure events
in each category of a more detailed level (sub-assembly or component)
The taxonomies used in previous research in wind turbine reliability are closer to the
assembly level of the Reliawind taxonomy used for this project. Thus it would be
easier to compare the results of this project with other results from literature.
The alarm codes that appeared in the results of the SCADA data analysis were assigned to the
different wind turbine assemblies. This was done according to the description given in the
alarm log for each error code, additional information from the manufacturer (e.g.
troubleshooting manual) when available and the experience of MECAL’s inspection crew.
Summarizing the above mentioned processes that have been implemented in the SCADA data
processing algorithm developed, the key tasks performed are:
An example of the final results from a SCADA data set for a wind turbine is presented in
Table 13.
Row # Project # Turbine ID TimeStamp Event type Alarm duration Service duration Total downtime Asse mbly
41611 16-03-10 22:10 Minor Repair 9:20:00 3:20:00 12:40:00 Pitch System
52609 21-06-10 9:20 Minor Repair 1:30:00 6:50:00 8:20:00 Gearbox
64698 13-09-10 8:30 Manual Restart 2:30:00 0:50:00 3:20:00 Unknown
67444 2-10-10 12:20 Minor Repair 1:40:00 5:10:00 6:50:00 Frequency Converter
67512 3-10-10 0:10 Major Repair 6:10:00 125:50:00 132:00:00 Frequency Converter
83466 22-01-11 1:30 Manual Restart 2:10:00 0:10:00 2:20:00 Grid Connection
92181 23-03-11 14:00 Manual Restart 0:20:00 0:20:00 0:40:00 Grid Connection
95162 13-04-11 6:50 Manual Restart 0:40:00 0:40:00 1:20:00 Grid Connection
130307 13-12-11 17:30 Manual Restart 1:50:00 0:30:00 2:20:00 Pitch System
Table 13. Example of failure analysis results for one wind turbine
38
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
An overview figure of the algorithm developed and described in this chapter is provided in the
following Figure 23.
39
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
40
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
In this section the overall results of the SCADA data analysis of the two wind farms that were
chosen as test case are presented. In Figure 24 and the relevant Table 14 the normalized
failure frequency is presented. Additionally, in Figure 25 and Table 15 the normalized
downtime for each wind turbine assembly is also shown.
010%
008%
006%
004%
Manual Restart
Minor Repair
002%
Major Repair
000%
Figure 24. Results - Normalized failure frequency for wind turbine assemblies (including only identified failures)
41
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
The wind turbine assemblies which appear to have higher failure frequency are
o Pitch system (19.6%)
o Frequency converter (15.59%)
o Control & Communication system (9.73%)
The frequency of the event types is higher for less severe events with Manual restarts
representing almost half of the events (49.07%). Though it should be mentioned that
for several assemblies the occurrence of Minor restarts is higher compared to Manual
restarts.
From the wind turbine reliability previous research projects (as presented in chapter 3)
it would be more reasonable to compare the results with those from the Reliawind
project because the wind turbines used are of rated power >850kW as well as those
examined in the current research project. In the results of Reliawind the assemblies
with the highest failure frequency are (see Figure 9):
o Pitch system (21.29%)
o Frequency converter (12.96%)
o Yaw system (11.28%)
The results agree with those of Reliawind that the two most critical assemblies are the
Pitch system and the Frequency converter. The Yaw system failures in the current
research are lower compared to the results of Reliawind.
There is a significant percentage of failure events that were not identified (11.16%)
(see Table 14). This can be because of unclear or ambiguous alarm description or no
alarm at all in the Alarm log. In these cases, additional O&M information (e.g.
Maintenance logs) would be useful.
42
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Downtime
020%
018%
016%
014%
012%
010%
008%
006%
004% Manual Restart
002% Minor Repair
000% Major Repair
Figure 25. Normalized downtime for wind turbine assemblies (including only identified failures)
Table 15. Normalized downtime for wind turbine assemblies (over the total number of failure events)
43
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
The wind turbine assemblies that cause the longest downtime are:
o Frequency converter (17.23%)
o Pitch system (11.97%)
o Power electrical system (8.99%)
As expected by the event type definition the contribution of the major repairs to the
total downtime is significantly larger compared to the other two categories.
Accordingly, the total downtime for minor repairs is longer than the total downtime
for manual restarts despite the higher frequency of manual restarts.
The frequency converter failures have a higher contribution to the total downtime
(17.23%) compared to their contribution to the total number of failures (12.96%). The
opposite appears for the pitch system; the pitch system has lower contribution to the
total downtime (11.97%) compared to its contribution to the total number of failures
(19.6%). In general, the contribution of the assemblies to the total number of failures
compared to their contribution to the total downtime does not show large deviation.
An exception is the power electrical system with only 1% of the total number of
failures but 8.99% of the total downtime. Though, it should be taken into
consideration that the turbine population used for this research is relatively small, thus
the results can be affected by specific incidents.
The percentage of the total downtime due to unidentified failure events is significant
(23.48%). This high percentage appears because of very long (unidentified) downtime
events (with duration longer than 30 days) in few turbines of one of the wind farms
As mentioned before, additional sources of O&M information can identify more of the
unknown events and decrease this percentage.
In some of the previous research on wind turbine reliability it was observed that the
gearbox and generator had a much higher contribution to the total downtime compared
to the percentage of failures occurred (Figure 12, Figure 14, Figure 16). This does not
occur in the turbine population examined in this project. In general, major failures in
gearboxes and generators have long downtimes because the replacement of these
assemblies (if needed) is a long operation with possibly long logistic delay time
(special equipment, weather restrictions). Though, the relatively short period of the
data used for this project indicates that no major replacements of these assemblies took
place during this period.
44
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
In chapter 3 an overview of the research projects on wind turbine reliability carried out in the
past was made. The initial efforts focused on counting the failure occurrence and extracting
reliability results in terms of failure rates (failures per wind turbine assembly per year). This
was mainly based on the assumption that the failure rate of wind turbine assemblies follows
the “bathtub curve” shape (Figure 26), i.e. having a constant failure rate during the useful life
period.
Figure 26. The bathtub curve shape of failure rate over time for a system's lifetime, (Rausand & Høyland, 2004)
In more recent research projects efforts have been made to examine the evolution of the
failure rate during the lifetime of a wind turbine. Spinato et al. used the Power Law process to
model the reliability growth of Danish and German wind turbines but also the reliability
growth of several wind turbine assemblies (Spinato, et al., 2009). The reliability growth plot
for the German Danish wind turbines was shown in Figure 18. Additionally, Andrawus used
the Weibull distribution to model the failures of operational wind farms examined (Andrawus,
2008). An example of failure rate plot modelled with the 2-parameter Weibull distribution is
shown in Figure 27. Moreover, recent findings from failure data of 2 operational wind farms
have demonstrated failure behaviour different than the bathtub curve. The author of that
report expresses his doubts about the assumption of constant failure rate (Buckley, 2013). The
failure frequency for the two wind farms used in the research of Buckley is shown in Figure
28.
45
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Figure 27. Main shaft set failure rate plot, (Andrawus, 2008)
Figure 28. Failure occurrence for 2 operational wind farms, (Buckley, 2013)
For the statistical analysis of the failure events extracted with the use of the SCADA data
processing algorithm, depending on the event type the following methods were selected:
Power Law Process model for the Manual restarts & Minor repairs
Weibull distribution for the Major repairs
Manual restarts of a wind turbine as defined in chapter 2 are failure events that require the
presence of the technical crew but no repairing action takes place. The only intervention is
rebooting the turbine controller. It cannot be considered that the condition of the turbine has
improved after a manual restart and thus using a distribution would not be appropriate for
modelling manual restarts. As thoroughly explained in chapter 2 a distribution can be used to
46
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
model a single lifetime, consequently using a distribution indicates that the system is “as-
good-as-new” after the failure (Crow, 2004). For modelling inter-occurrence of manual
restarts the Power Law Process (PLP) model is used under the assumption that the system is
“as-bad-as-old” after the failure.
For the estimation of the parameters β & λ of the PLP model a simple VBA algorithm was
created to solve (numerically) the system of equations presented in section 2.2.2.2:
∑
=
∑ ( − )
∑
=
∙∑ [ ∙ − ∙ ]−∑ ∑ ( )
The results of the parameter estimator were verified with the use of the reliability
software Reliasoft RGA 9 (trial version) (Reliasoft, 2013).
Since there is no actual repairing during a manual restart there is no reason to group
the manual restarts to the wind turbine assemblies. All the manual restarts for each
wind farm are grouped together for the estimation of the parameters of the PLP. The
results are presented in Table 16 and the relevant reliability plots in Figure 29.
47
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Manual Restarts
0,014
Failure rate (Failures/day)
0,012
0,01
0,008 Wind Farm A
0,006 Wind Farm B
0,004
0,002
0 200 400 600 800 1000
Time (days)
The same methodology as explained for manual restarts is applied also for minor repairs.
During minor repairs service action takes place repairing or replacing components of the wind
turbine assembly. As described in the wind turbine taxonomy (section 5.1), an assembly can
be considered a system consisted of several sub-assemblies and components. Consequently, a
minor repairing action or a replacement of a component is still considered that brings the
system back to operating state in the condition it was before the failure.
Because of the relatively small turbine population and time length of the sample used for this
project the minor repairs for each wind farm are grouped together in order to estimate the
parameters of the PLP model. Though, it is suggested to model the minor repairs of each
assembly separately if a larger dataset is available. From the current dataset the PLP model
was applied to the minor repairs of the pitch system which was the most critical assembly
(and thus the amount of minor repairs was sufficient for the analysis). The results for the
minor repairs in the two wind farms under discussion are presented in Table 17 and the
relevant reliability growth plots in Figure 30and for the pitch system in Table 18 and Figure
31.
48
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Minor Repairs
Failure Rate (failures/day) 0,016
0,014
0,012
0,01
0,008
Wind Farm A
0,006
Wind Farm B
0,004
0,002
0
0 200 400 600 800 1000
Time (days)
0,005
0,004
0,003
Wind Farm A
0,002 Wind Farm B
0,001
0
0 200 400 600 800 1000
Time (days)
Figure 31. Failure rate function plot, Minor Repair - Pitch system
49
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
For the major repairs the assumption that the assembly is “as-good-as-new” after the repairing
action is considered realistic to be made. In this case there is no inter-occurrence of failure
events but a new lifetime of the assembly starts after each major repair. Thus, the major
repairs can be modeled with the Weibull distribution.
For the estimation of the Weibull shape and scale parameters (β,λ) “Dr. Bob’s Reliability
Calculator”, an Excel-based tool developed by NASA was used (NASA , 2013). Because of
the relatively small turbine population and time length of the sample used for this project only
major failures of assemblies for which there was sufficient number of events. Especially for
wind farm B for which the dataset was shorter no more than 2 major failures were detected for
the same assembly. Thus, it was considered of little statistical value to perform Weibull
analysis in such a small sample. The weibull distributions of the pitch system and the
frequency converter for wind farm A are presented in Figure 32 & Figure 33.
Frequency Converter
99.99
99.9
99
95
90
Weibull
63.2
50
Cumulative Occurrence (%)
10
5
11
1
.5
7
.1
.05
1 3 1
.01
.01 .1 1 10 100 1000 10000 100000
Time (days)
Figure 32. Weibull plot for major failures of Frequency converters of wind farm A
50
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Pitch System
99.99
99.9
99
95
90
Weibull
63.2
50
Cumulative Occurrence (%)
10
13
1
.5
3 5
.1
.05
1 1
.01
.001 .01 .1 1 10 100 1000 10000 100000
Time (days)
Figure 33. Weibull plot for major failures of Pitch system of wind farm A
51
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
7 Prediction model
Recent research has been carried out in order to define the impact of environmental factors
on WTG reliability. In this chapter an overview of the findings of this research is provided.
Additionally, an effort to adapt the results of the statistical analysis performed in the previous
chapter to case specific analysis according to the different environmental conditions is
presented.
The first research projects on wind turbine reliability had focused on observing the occurrence
of failures in order to extract failure statistics. Grouping the failure data together and thus
weighing equally all the turbines observed was considered of the major disadvantages of
WMEP, one of the most sizeable research projects on wind turbine reliability (Faulstich &
Hahn, 2009). The influence of several parameters on wind turbine reliability has been
examined in research projects mainly focusing on the following:
Faulstich et al. have used the database of WMEP in order to examine the reliability of
different turbine types, technical concepts and the relation of the failure rate with the average
wind speed and the wind energy index (Faulstich, et al., 2009). The seasonal variation of
failure intensity and other effects of weather and location on wind turbine failure rates were
examined by Tavner et al. (Tavner , et al., 2010). The effect of environmental conditions on
the reliability of specific wind turbine assemblies has been examined, for example the
correlation between turbulence intensity and pitch system failures (Tavner , et al., 2011). An
extensive research on the effect of environmental parameters on wind turbine reliability using
data from over 20 GW of operating wind turbines from all over the world was made by
Wilkinson et al. (Wilkinson, et al., 2012).
Other researchers have carried out qualitative reliability studies comparing the reliability of
different configurations of wind turbine assemblies including: generators (Tavner, 2012, p.
69), power electronic converters (Arifujjaman, 2013), gearboxes (Smolders, et al., 2010).
52
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
In the scope of this research the focus will be placed on the effect of environmental
parameters on wind turbine reliability. More specifically, the findings of Wilkinson et al. for
the effect of mean wind speed and turbulence intensity on turbine reliability as presented in
their research report will be the main reference (Wilkinson, et al., 2012). The reasons that this
research report will be used are:
It is the most recent, thus more modern WTGs have been examined
A vast amount of operational data has been used increasing the statistical value of the
results
The results of the 10-min SCADA data analysis from the above mentioned research project
are presented in Figure 34 & Figure 35.
Figure 34. 10-minute SCADA database analysis showing failure rate and downtime as function of Mean wind speed,
(Wilkinson, et al., 2012)
Figure 35. 10-minute SCADA database analysis showing failure rate and downtime as function of average Turbulence
intensity, (Wilkinson, et al., 2012)
53
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
In chapters 5 and 6 the failure definition from 10-min SCADA data and the statistical analysis
of the results were presented. The reliability of the manual restarts and minor repairs was
modelled with the power law process and the major repairs with the Weibull distribution. In
order to introduce the influence of environmental parameters the following assumptions were
made:
1. All the environmental parameters used (Mean wind speed & Turbulence intensity)
have the same influence on wind turbine reliability.
2. All the failure types (Manual restart, Minor repair, Major repair) are equally affected
by the environmental parameters.
3. All the wind turbine assemblies are equally affected by the environmental parameters
introduced.
4. The failure rate trend (increasing or decreasing) is not affected but only the values of
the instant failure rate.
Taking into account these assumptions and the influence of average wind speed and
turbulence intensity as shown in Figure 34 & Figure 35 the parameter λ (lamda) is modified
according to the relationship between the environmental parameters of the wind farm for
which λ has been calculated from operational SCADA and those of the wind farm for which a
reliability estimation is to be made. For each environmental parameter a ratio between the
value for the wind farm target (the one the reliability estimation will be made) and the value
for the wind farm initial calculated:
= ∙ ∙
An example to illustrate the application of the above mentioned methodology is given in the
next section.
54
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
We assume we want to make estimation for the manual restarts of a wind farm (Target wind
farm) with average yearly wind speed 8m/sec and average turbulence intensity 0,15. The
results for the manual results of wind farms A&B calculated in section 6.2.2.1along with the
environmental parameters are presented in Table 19.
For wind farm A, the ratio concerning the influence of wind speed will be:
1,21
= = = 1,432
0,845
, 2,49
= = = 1,791
, 1,39
1,21
= = = 0,835
1,45
, 2,49
= = = 0,57
, 4,35
The final estimation for the wind farm – target will be a weighted average on the population
of the two wind farms using the modified λ parameters:
( ) = ∙ ( ) + ∙ ( )
55
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
0,03
0,025
0,02
Wind farm A
0,015
Wind Farm B
0,01
Wind Farm target
0,005
0
0 200 400 600 800 1000
Time (days)
Figure 36. Failure rate function plot, Manual restarts - Target wind farm
56
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
8 Closure
In the final chapter the findings of this research project are summarized, the main
conclusions are presented, the limitations of the scope of work are pointed out and
suggestions for future research based on the present one are made.
8.1 Conclusions
During this project an algorithm was created in order to extract the failure history with the use
of 10-min SCADA data along with the relevant Alarm log. Following the analysis, the results
went through a different statistical analysis depending on the failure type. Finally, a
preliminary estimation model was created introducing the influence of average wind speed
and turbulence intensity on wind turbine reliability. The following conclusions can be drawn:
Processing SCADA data only (along with the alarms logs) can provide a sufficient
description of the failure history. 88,84% of the failures were identified for the two
wind farms examined in the project.
The assemblies with the higher failure frequency in the wind farms examined were the
pitch system, the frequency converter and the control and communication system.
The assemblies that cause the longer downtime in the wind farms examined are the
frequency converter, the pitch system and the power electrical system.
Wind turbine assemblies which are complex systems operating in very different
conditions. Consequently, the bathtub curve for their failure rate should not be taken
for granted and should be analyzed on base-to-base cases.
Using the Weibull distribution and NHPP can model reliability more precisely and if
the failure rate is constant it can be concluded (then we get an exponential distribution
and HPP respectively).
Grouping the data of several wind farms together is “hiding” information concerning
the influence of environmental and other parameters on wind turbine reliability and
can provide misleading results.
Additional operational information can illustrate the failure history and increase the
percentage of the failure events identified.
8.2 Limitations
For this project only 10-minute SCADA data were used. Detailed verification with
maintenance logs or other sources would eliminate the uncertainties.
The amount of data available led to the decision to limit the failure classification to an
assembly level. A larger dataset could give the opportunity to categorize the failures in
57
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
The total downtime was divided in initial logistic delay and all the period after the first
repairing action was considered service time. Under this assumption the service time
may be overestimated, fact that can have an impact on the cost modelling.
Only the impact of wind speed and turbulence intensity was considered. Additionally,
it was considered that both parameters have an equal impact on wind turbine
reliability.
Large scale wind projects are a relatively recent venture and thus there are not many wind
farms for which we have full life-cycle data available. Nevertheless, the technology evolution
is so rapid that reliability data from past decades can be of limited usability to predict the
reliability of modern WTGs. Reliability prediction is a field with lots of space for
improvements. Connected to this thesis, every limitation of those mentioned above can be a
new research topic. Further future work ideas would be:
Root cause analysis is always the most precise way to define failures and proceed to
improvements, though it is time-consuming as it is difficult to be automated. Making
root cause analysis through an automated process with little subjectivity would be a
problem to be addressed.
The connection between the occurrence of manual restarts, minor repairs and major
repairs can be examined.
58
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
9 References
Abernethy, R. B., 2001. The New Weibull Handbook. 4th ed. North Palm Beach(Florida):
Robert B. Abernethy.
Andrawus, J. A., 2008. Maintenance optimisation for wind turbines, Aberdeen: The Robert
Gordon University.
Arifujjaman, M., 2013. Reliability comparison of power electronic converters for grid-
connected 1.5kW wind energy conversion system. Renewable Energy, 5 March, Volume 57,
pp. 348-357.
Barbati, S., 2009. Common reliability analysis methods and procedures, Reliawind
consortium.
Boyle, G., 2004. Renewable Energy, Power for a sustainable future. 1st ed. Oxford
University Press, Incorporated.
Buckley, S., 2013. Forecasting wind farm component failures and availability post-warranty.
Vienna, EWEA.
Crow, L. H., 1975. Reliability analysis for complex, repairable systems. Technical report No.
138, Aberdeen Proving Ground, Maryland: U.S. Army Material Systems Analysis Activity.
Crow, L. H., 2004. Practical Methods for Analyzing the Reliability of Repairable systems.
Reliability EDGE, 5(1), pp. 4-9.
EWEA, 2010. Costs & Prices. Wind Energy the Facts, Volume 2.
Faulstich , S. & Hahn, B., 2009. Comparison of different wind turbine concepts due to their
effects on reliability, Project Upwind.
Faulstich, S., Hahn, B., Lyding, P. & Tavner, P., 2009. Reliability of offshore wind turbines.
Identifying risks by onshore experience. Stockholm, EWEA.
Faulstich, S., Hahn, B. & Tavner, P., 2010. Wind turbine downtime and its importance for
offshore deployment, John Wiley & Sons, Ltd..
Hahn, B., Durstewitz, M. & Rohrig, K., 2006. Reliability of Wind turbines, Experiences of 15
years with 1500 turbines, Kassel, Germany: ISET.
Langniss, O., 2006. The German 250MW Wind Program, Stuttgart, Germany: Center for
Solar Energy and Hydrogen Research Baden-Württemberg (ZSW).
59
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Peters, V. A., Alistair, O. B. & Bond, C. R., 2012. Continuous Reliability Enhancement for
Wind (CREW) Database: Wind Plant Reliability Benchmark, Livermore: Sandia National
Laboratories.
Peters, V. A., Stinebaugh, J. A., Veers, P. S. & Hill, R. R., 2009. Wind Turbine Reliability
Database Update, Livermore, California: Sandia National Laboratories.
Rausand, M. & Høyland, A., 2004. System Reliability Theory. Models, Statistical Methods
and Applications. Hoboken(New Jersey): John Wiley & Sons.
Reliability EDGE, 2004. Avoiding a common mistake in the analysis of repairable systems.
Reliability EDGE, 7(1), pp. 3-8.
Ribrant, J., 2006. Reliability performance and maintenance, A survey of failures in wind
power systems, Stockholm: KTH School of Electrical Engineering.
Ribrant, J. & Bertling, L. M., 2007. Survey of failures in wind power systems with focus on
Swedish wind power plants during 1997-2005. IEEE Transactions on Energy conversion,
March, 22(1), pp. 167-173.
Smolders, K., Long , H., Feng, Y. & Tavner, P., 2010. Reliability analysis and prediction of
wind turbine gearboxes. Warsaw, EWEA.
Spinato, F., Tavner, P., van Bussel, G. & Koutoulakos, E., 2009. Reliability of wind turbine
subassemblies. IET Renewable Power Generation, 3(4), pp. 387-401.
Stenberg, A. & Holttinen, H., 2010. Analysing failure statistics of wind turbines in Finland,
Espoo, Finland: VTT, Technical Research Centre of Finland.
Tavner , P. et al., 2010. Study of effects of weather & location on wind turbine failure rates.
Warsaw.
Tavner , P., Qiu, Y., Korogiannos, A. & Feng, Y., 2011. The correlation between wind
turbine turbulence and pitch failure. Brussels, EWEA.
60
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Tavner, P., 2009. Reliability & Availability of Wind Turbine Electrical & Electronic
Components. Elsinki.
Tavner, P., 2011. Recommendations from the Reliawind Consortium for the Standardisation
for the Wind Industry of Wind Turbine Reliability Taxonomy, Terminology and Data
Collection, Reliawind.
Tavner, P., 2012. Offshore Wind Turbines. Reliability, availability and maintenance. 1st ed.
London: The Institution of Engineering and Technology.
Tavner, P., Xiang, J. & Spinato, F., 2007. Reliability Analysis for Wind Turbines. Wiley
Interscience, Volume 10, pp. 1-18.
U.S. Department of Defense, 1980. Military Standard, Procedures for performing a failure
mode, effects and criticality analysis, Washington DC: Department of Defense.
Wilkinson, M., 2011. Empirical analysis of wind turbine reliability. Brussels, EWEA.
Wilkinson, M. & Hendriks, B., 2011. Report on wind turbine reliability profiles, s.l.:
Reliawind.
Wilkinson, M. et al., 2011. Measuring wind turbine Reliability, Results of the Reliawind
project, GL Garrad Hassan.
Wilkinson, M., Van Delft, T. & Harman, K., 2012. Effect of environmental parameters on
wind turbine reliability. Copenhagen, EWEA.
Zhang, J., Chowdhury, S., Messac, A. & Castillo, L., 2012. A response surface-based cost
model for wind farm design. Energy policy, March, pp. 538-550.
61
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
APPENDIX I
System level:
System
1.WTG
2.Wind Farm
Sub-System level:
Sub-System
1.1.Drive Train Module
1.2.Electrical Module
1.3.Nacelle Module
1.4.Rotor Module
1.5.Support Structure
2.1.Collection System
2.2.Meteorological Station
2.3.Operational Infrastructure
2.4.Substation
Assembly level:
Assembly
1.1.1.Gearbox
1.1.2.Generator
1.1.3.Main Shaft Set
1.2.1.Auxiliary Electrical System
1.2.2.Control and Communication System
1.2.3.Frequency Converter
1.2.4.Power Electrical System
1.3.1.Hydraulics System
1.3.2.Nacelle Auxiliaries
1.3.3.Yaw System
1.4.1.Blade
1.4.2.Hub
1.4.3.Pitch System
1.5.1.Foundation
1.5.2.Tower
2.1.1.Cable
2.2.1.Meteorological Station I
2.3.1.Operational Infrastructure I
2.4.1.Grid Connection
62
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Sub-Assembly level:
Sub-Assembly
1.1.1.1.Bearings
1.1.1.2.Cooling System I
1.1.1.3.Gears
1.1.1.4.Housing
1.1.1.5.Lubrication System I
1.1.1.6.Sensors I
1.1.2.1.Cooling System II
1.1.2.2.Lubrication System II
1.1.2.3.Rotor
1.1.2.4.Sensors II
1.1.2.5.Stator
1.1.2.6.Structural and Mechanical
1.1.3.1.High Speed Side
1.1.3.2.Low Speed Side
1.1.3.3.Mechanical Brake
1.1.3.4.Sensors III
1.2.1.1.Electrical Services
1.2.1.2.Lightning Protection System
1.2.2.1.Ancillary Equipment
1.2.2.2.Communication System
1.2.2.3.Condition Monitoring System
1.2.2.4.Controller Hardware
1.2.2.5.Controller Software
1.2.2.6.Safety Chain
1.2.3.1.Converter Auxiliaries
1.2.3.2.Converter Power Bus
1.2.3.3.Power Conditioning
1.2.4.1.Measurements
1.2.4.2.Power Circuit
1.3.1.1.Hydraulic Power Pack
1.3.1.2.Actuator
1.3.1.3.Torque Converter
1.3.1.4.Differential
1.3.1.5.Viscous Coupling
1.3.2.1.Meteorological Sensors
1.3.2.2.Nacelle Sensors
1.3.2.3.Safety System
63
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Sub-Assembly
1.3.2.4.Bedplate
1.3.2.5.Cover
1.3.2.6.Generator Frame
1.3.3.1.Yaw Brake
1.3.3.2.Yaw Drive
1.3.3.3.Yaw Sensors
1.4.1.1.Blade Lightning Protection Termination
1.4.1.2.Blade Lightning Down conductor
1.4.1.3.Deicing System
1.4.1.4.Leading Edge Bond
1.4.1.5.Nuts And Bolts
1.4.1.6.Paint And Coating
1.4.1.7.Root Structure
1.4.1.8.Sandwich Shell
1.4.1.9.Spar Box
1.4.1.10.Spar Cap
1.4.1.11.Spar Web
1.4.1.12.Trailing Edge Bond
1.4.2.1.Exit Hatch
1.4.2.2.Nose Cone
1.4.3.1.Pitch Cabinet
1.4.3.2.Pitch Drive
1.4.3.3.Pitch Sensors
1.5.1.1.Gravity Based Foundation
1.5.1.2.Monopile
1.5.1.3.Onshore
1.5.1.4.Space Frame or Tripod
1.5.2.1.Access Equipment
1.5.2.2.Tower I
2.1.1.1.Cable I
2.2.1.1.Meteorological Station II
2.3.1.1.Operational Infrastructure II
2.4.1.1.HV Link
2.4.1.2.Substation Transformer
2.4.1.3.Utility Communication and Control
64
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component level:
Component
1.1.1.1.1.Carrier Bearing
1.1.1.1.2.Planet Bearing
1.1.1.1.3.Shaft Bearing
1.1.1.2.1.Hose
1.1.1.2.2.Pump
1.1.1.2.3.Radiator
1.1.1.3.1.Hollow Shaft
1.1.1.3.2.Planet Carrier
1.1.1.3.3.Planet Gear
1.1.1.3.4.Ring Gear
1.1.1.3.5.Spur Gear
1.1.1.3.6.Sun Gear
1.1.1.4.1.Bushing
1.1.1.4.2.Case
1.1.1.4.3.Mounting
1.1.1.4.4.Torque Arm System
1.1.1.5.1.Hose
1.1.1.5.2.Motor
1.1.1.5.3.Motor
1.1.1.5.4.Primary Filter
1.1.1.5.5.Pump
1.1.1.5.6.Reservoir
1.1.1.5.7.Seal
1.1.1.5.8.Secondary Filter
1.1.1.6.1.Debris
1.1.1.6.2.Oil Level
1.1.1.6.3.Pressure 1
1.1.1.6.4.Pressure 2
1.1.1.6.5.Temperature
1.1.2.1.1.Cooling Fan
1.1.2.1.2.Filter
1.1.2.1.3.Hose
1.1.2.1.4.Radiator
1.1.2.2.1.Pump
1.1.2.2.2.Reservoir
1.1.2.3.1.Commutator
1.1.2.3.2.Exciter
1.1.2.3.3.Resistance Controller
65
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.1.2.3.4.Rotor Lamination
1.1.2.3.5.Rotor Winding
1.1.2.3.6.Slip Ring
1.1.2.4.1.Core Temperature Sensor
1.1.2.4.2.Encoder
1.1.2.4.3.Wattmeter
1.1.2.5.1.Magnet
1.1.2.5.2.Stator Lamination
1.1.2.5.3.Stator Winding
1.1.2.6.1.Front Bearing
1.1.2.6.2.Housing
1.1.2.6.3.Rear Bearing
1.1.2.6.4.Shaft
1.1.2.6.5.Silent Block
1.1.3.1.1.Coupling
1.1.3.1.2.Rotor Lock
1.1.3.1.3.Shaft
1.1.3.1.4.Transmission Shaft
1.1.3.2.1.Axial Bearing
1.1.3.2.2.Compression Coupling
1.1.3.2.3.Connector Plate
1.1.3.2.4.Main Bearing Seal
1.1.3.2.5.Main Bearing Temperature Sensor
1.1.3.2.6.Main Shaft
1.1.3.2.7.Radial Bearing
1.1.3.2.8.Rotor Lock
1.1.3.2.9.Slip Ring
1.1.3.3.1.Caliper
1.1.3.3.2.Disk
1.1.3.3.3.Pad
1.1.3.3.4.Tranmission Lock
1.1.3.4.1.High Speed Sensor
1.1.3.4.2.Low Speed Sensor
1.1.3.4.3.Position Sensor
1.2.1.1.1.24 Dc Feeder
1.2.1.1.2.Auxiliary Transformer
1.2.1.1.3.Breaker
1.2.1.1.4.Cabinet
1.2.1.1.5.Fan
66
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.2.1.1.6.Fuse
1.2.1.1.7.Grid Protection Relay
1.2.1.1.8.Light
1.2.1.1.9.Mechanical Switch
1.2.1.1.10.Power Point
1.2.1.1.11.Protection Cabinet
1.2.1.1.12.Pushbutton
1.2.1.1.13.Relay
1.2.1.1.14.Space Heater
1.2.1.1.15.Surge Arrester
1.2.1.1.16.Thermal Protection
1.2.1.1.17.Ups
1.2.1.2.1.Air Termination
1.2.1.2.2.Bonding Element
1.2.1.2.3.Earth Connector
1.2.1.2.4.Earth Termination
1.2.1.2.5.Sliding Contact
1.2.1.2.6.Spark Gap System
1.2.1.2.7.Surge Arrester
1.2.2.1.1.Breaker
1.2.2.1.2.Cabinet Temperature Sensor
1.2.2.1.3.Cable
1.2.2.1.4.Contactor
1.2.2.2.1.Analog I/O Unit
1.2.2.2.2.Digital I/O Unit
1.2.2.2.3.Ethernet Module
1.2.2.2.4.Field Bus Master
1.2.2.2.5.Field Bus Slave
1.2.2.2.6.Frequency Unit
1.2.2.3.1.Condition Cables
1.2.2.3.2.Data Logger
1.2.2.3.3.Protocol Adapter Card For Data Logger
1.2.2.3.4.Sensors
1.2.2.4.1.Controller Power Supply
1.2.2.4.2.Cpu
1.2.2.4.3.Internal Communication System
1.2.2.4.4.Main I/O Unit
1.2.2.4.5.Watch Dog Unit
1.2.2.4.6.Closed Loop Control Software
67
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.2.2.4.7.Supervisory Control Software
1.2.2.5.1.Closed Loop Control Software
1.2.2.5.2.Supervisory Control Software
1.2.2.6.1.Emergency Button
1.2.2.6.2.Max Speed Switch
1.2.2.6.3.Power Switch
1.2.2.6.4.Short Circuit Switch
1.2.2.6.5.Vibration Switch
1.2.2.6.6.Watch Dog Switch
1.2.2.6.7.Wind-Up Switch
1.2.3.1.1.Auxiliary Power Supply
1.2.3.1.2.Cabinet
1.2.3.1.3.Cabinet Heating System
1.2.3.1.4.Cabinet Sensor
1.2.3.1.5.Communication And Interface Unit
1.2.3.1.6.Control Board
1.2.3.1.7.Generator Side Fan
1.2.3.1.8.Grid Side Fan
1.2.3.1.9.Measurement Unit
1.2.3.1.10.Power Supply
1.2.3.1.11.Power Supply 24v
1.2.3.1.12.Tachometer Adapter
1.2.3.1.13.Thermostat
1.2.3.2.1.Branching Unit
1.2.3.2.2.Capacitor
1.2.3.2.3.Contactor
1.2.3.2.4.Generator Side Converter
1.2.3.2.5.Generator Side Power Module
1.2.3.2.6.Grid Side Converter
1.2.3.2.7.Grid Side Power Module
1.2.3.2.8.Inductor
1.2.3.2.9.Load Switch
1.2.3.2.10.Pre-Charge Unit
1.2.3.3.1.Common Mode Filter
1.2.3.3.2.Crowbar
1.2.3.3.3.Dc Chopper
1.2.3.3.4.Generator Side Filter
1.2.3.3.5.Line Filter Assembly
1.2.3.3.6.Voltage Limiter Unit
68
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.2.4.1.1.Ta
1.2.4.1.2.Tv
1.2.4.2.1.Cables
1.2.4.2.2.Machine Contactor
1.2.4.2.3.Machine Transformer
1.2.4.2.4.Mv Busbar / Isolator
1.2.4.2.5.Mv Switchgear
1.2.4.2.6.Soft Start Electronics
1.3.1.1.1.Motor
1.3.1.1.2.Pump
1.3.1.1.3.Pressure Valve
1.3.1.1.4.Filter
1.3.1.2.1.Bushing
1.3.1.2.2.Cylinder
1.3.1.2.3.Hose / Fitting
1.3.1.2.4.Hydraulic Linear Drive
1.3.1.2.5.Limit Switch
1.3.1.2.6.Linkage
1.3.1.2.7.Miscellaneous Hydraulics System
1.3.1.2.8.Position Controller
1.3.1.2.9.Proportional Valve
1.3.1.2.10.Pump
1.3.2.1.1.Anemometer
1.3.2.1.2.Wind Vane
1.3.2.2.1.Emergency Vibration Sensor
1.3.2.2.2.Yaw Encoder
1.3.2.3.1.Beacon
1.3.2.3.2.Down Conductor
1.3.2.3.3.Fall Arrester
1.3.2.3.4.Firefighting System
1.3.2.3.5.Nacelle Cover Metallic Mesh
1.3.2.3.6.Lightning Protection Termination
1.3.2.3.7.Service Crane
1.3.2.4.1.Bolts
1.3.2.4.2.Cast or Welded Structure
1.3.2.5.1.Fibreglass
69
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.3.2.5.2.Hatch
1.3.2.6.1.Bolts
1.3.2.6.2.Cast or Welded Structure
1.3.3.1.1.Yaw Brake Calipers
1.3.3.1.2.Yaw Brake Disc
1.3.3.1.3.Yaw Brake Hoses
1.3.3.1.4.Yaw Brake Paths
1.3.3.2.1.Damper
1.3.3.2.2.Yaw Bearing
1.3.3.2.3.Yaw Gearbox
1.3.3.2.4.Yaw Motor
1.3.3.2.5.Yaw Pinion
1.3.3.3.1.Wind-Up Counter
1.3.3.3.2.Yaw Encoder
1.4.1.1.1.Blade Lightning Protection Termination
1.4.1.2.1.Blade Lightning Down conductor
1.4.1.3.1Deicing System
1.4.1.4.1.Leading Edge Bond
1.4.1.5.1.Nuts And Bolts
1.4.1.6.1.Paint And Coating
1.4.1.7.1.Root Structure
1.4.1.8.1.Sandwich Shell
1.4.1.9.1.Spar Box
1.4.1.10.1.Spar Cap
1.4.1.11.1.Spar Web
1.4.1.12.1.Trailing Edge Bond
1.4.2.1.1.Exit Hatch
1.4.2.2.1.Nose Cone
1.4.3.1.1.Battery
1.4.3.1.2.Battery Charger
1.4.3.1.3.Heater
1.4.3.1.4.Local Controller
1.4.3.1.5.Switchboard
1.4.3.2.1.Motor
1.4.3.2.2.Motor Cooling
1.4.3.2.3.Motor Cooling System
1.4.3.2.4.Motor Drive
1.4.3.2.5.Pinion
1.4.3.2.6.Pitch Bearing
70
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
Component
1.4.3.2.7.Pitch Gearbox
1.4.3.3.1.Position Encoder
1.4.3.3.2.Temperature Sensor
1.4.3.3.3.Voltmeter
1.5.1.1.1.Concrete
1.5.1.1.2.Steel Reinforcement
1.5.1.2.1.Corrosion Protection
1.5.1.2.2.Pile
1.5.1.2.3.Transition Piece
1.5.1.3.1.Concrete
1.5.1.3.2.Nuts & Bolts
1.5.1.3.3.Piles
1.5.1.3.4.Steel Reinforcement
1.5.1.4.1.Corrosion Protection
1.5.1.4.2.Piles
1.5.1.4.3.Structures
1.5.2.1.1.Ladder
1.5.2.1.2.Landing Pad
1.5.2.1.3.Lightning Protection
1.5.2.2.1.Climb Assist
1.5.2.2.2.Maintenance Crane
1.5.2.2.3.Nuts & Bolts
1.5.2.2.4.Paint/Coating
1.5.2.2.5.Tower Section
2.1.1.1.1.Cable
2.2.1.1.1.Meteorological Station
2.3.1.1.1.Operational Infrastructure
2.4.1.1.1.HV Link
2.4.1.2.1.Substation Transformer
2.4.1.3.1.Utility Communication and Control
71
Wind Turbine Reliability Prediction – A SCADA data processing & Reliability estimation tool
APPENDIX II
72