You are on page 1of 3
592017 lettor Installation - PhoenixModular Elevator - Bula PHOENIX MODULAR ELEVATOR Build — General Contractor Work Congratulation! You have designed your elnator, Now you have fo make Sure t's insta propery. Bekw Is an outine ofthe General Coracter’s scope of wor Step 1: Order the Elevator Step 2: Site Prep - Pour the Pit 1g and pour a concrete pit the hoistvay, with eastn-place anchor bots inthe comers. You need to engineer the pt foundation ana ‘enforcement based onthe elas pit reaction that our enginasr ppt lo you, he jobsite sol condton, and your cal code Typical pts have 8° als and 12° Noor. See pl layout drawings or precise measurements for your ob you have a sump hole, cove it wh 8 non-combustible material ‘typically a shoot of metal Pur a concrete sla forthe madular machine room, fonder, Purchase ‘pony anehrs to batt to te foundation aftr st tna machine room is ta ent tothe hoisway, ping and electical mal be nin underound or overhead, Coordinate wth PME and the instal to determine any bulding preparations needed to accommodate Last, once the pit has been poured andthe anchor ots arin place éomioad this Pit Drawing Form, Flot all the barks wih exact maasuremants and make surs to nchde the project name athe top. Email the for 0 , With hie complet fer the Holes forthe anchors willbe as accurate a8 possible Step 3: Make Door Penetrations Make proper rough openings at each lang. Ree to project drawings ‘or precise width. They can be as narrow as the door opening or as wide ‘2 the entre Font wall fhe isa Sarriad ch landing In accordance wn OSHA Standards. Step Machine Room ite Prep - Build the re mculr macnine room has been ordered, you need only @ slab ‘an ebctical laps, you ao baling the machine room, provide or the fling + Ensure machine rom fer is complete and low, room is dy, wall ‘2 complete and fre rated with tha same rating asthe hoistway. + Equip with overhead light, swe, and GFCI outlet. hipikwauphosnimreularelowtor com eetornstallation bul 18 592017 lettor Installation - PhoenixModular Elevator - Bul + Ital exterior door that isa minimum of 20.5 wide (36 prefered), seflosng and solocking. + stall electrical power, including clcannets (608 Electcal secton) + Provde for climate contol ihe natural andronment vl not malin the machine room tomparature betwoon 50 ane 100 degros, and uml tgs than 85%. Thi 6 requted forthe corral to work propery and by Rul 2.7.2.2. Step 5: Schedule the Crane ‘Schedule the crane, Four hours is sueent fea single tower, including setup and takedown, The crane size requirement depends onthe ‘loator size and how athe crane has foreach to sat, For mare Getalls on sizing and rigging, as woll as vido of mauler clowtor bing Sot, lick te lnk below Step 6: Install Electric Pro fur loctricalstb-uss to the machine room. + Elevator power: Soha power, 208-480 vol dsseatod circu th Ioekable connect. Amperage requirements depend on project tage ‘and motor size. Contact us and well prove job-specife staring ar fa load amperage oo that you can size the power fed and discennec. + Car power (ighs and alam): 120 elt, 20 amp dedicsted cicut with lockable deconnect, + Hoitway power (ot ight and outlet) 129 vt, 20 amp decoated eult. Disconnact no required, as ths an land det into tho + Machin room pomer igh and out): 1200, 20 amp dedicated Creat. Tes crcty into room ight and out. + (Optional PTAC unt power ta moder machine room fs adered with {8 PTAC unt fer climate conto, i reads 8 208/290 vet, 20 amp osc cee, wid dott into thecal Provide a decieated phone Inet the machine rom, The install will canst this tothe ADA phone in the elesatr car. When operational, {tis ne must poi two-way communications that are monitored 24 rows a day. Soo Rule 227.4. Step 7: Install Fire Life Safety Install Automatic Fite Alarm Initiating Devices: As required by ASME AI7.1 & NFPA ~72 or pa local code, ‘Smoke Detectors Install smoke detectors in each hal ad wire them to bling sect! sup. Tey may aso be required in the machine room andlor eistway. Soe elite layout drawings for soko etectr wiring requromens, The instal wil make the fra connections fhe amcke detectors tothe corrals, Fire Sprinklers Local busing codes may requie fre sprinklers the ostway andlor macrine ream. Froquie inthe machine oom, you wl also red a means fo row power fom the equipment prior to “spanks turing on (shunt rp). Consult your les code ola fo peciteroquremonls. Fpinklrs are required, thoy must be installed ‘ter the eewtornstaition Is complete and mast be Installed in ‘accordance wih Rule 28.3 (ASME AtT.1), Holstway Venting: IBC equres hestway verting to the exterior for ary building ofmore than ree etree. Local rections may have ‘tonal equremons, See ASME/ANS| A 17.1, When required, PME supplies a dampered vent, which you wll need to install and wie inc bang power hipikwauphosnimreularelowtor com eetornstallation bul 592017 lettor Installation - PhoenixModular Elevator - Bul Step 8: Complete Interior and Exterior Building Tiedns Root Flash around the joint between the olator and roto prevent Exterior: eestor ison the exter ofthe balding, or protrudes above ‘he root, apply tal fish. Holsway standard extarr i teers gypsum type Xsheathng (Densglass or eae), 50 any bulfing fish may be applied ety. Standard oof's EPOM or Duo-Last that is ‘hed tthe reo and tacked around the sides. Aor fish i applies to ‘he was, this shouldbe terminates vor he sing Interior: Any ho'stway was that are exposed on tho interior may be taped, mudd and finished ike any standaré drywal. Te holstway walls int bling walls and oparings with drywall r expansion jit. Floor instal cab tooring. AM aowance below the sits provided Extond bing toaeng to hestway sil. An aluminum threshold plato is Foundation: Fash bottom ofhoitway lo ouside of pt wal and beltom ‘of macnn room to slab Step 9: Final Details round the holstway by means of he prodded ug, located nthe pt on the intr ofthe holt Install nonaink rout und tower, fcks & bul stands. Patch any holes fom piping and electcal wing nthe hostway ard machine room walls to mest applicable bulding code re rating Install a Class ABC fro extngushorin the machine room. See Rula 86.185. We haps thatthe information abo vl help you wth the eestor instalation. bis ur goal to make the process as easy as possible. Fyou have any suggestions or questins fea fe to contact us at your ph srezeacsie vuninet fox 10-2641023 Into@phoeriemodularelsata:com 4800 Posnac Ore Mount Vernon, 1. 62868 hipikwauphosnimreularelowtor com eetornstallation bul

You might also like