Below is the IEE Checklist Report for Batching and Crushing Plant Projects.
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if any,
following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and affected areas
and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization Scheme (PEMAPS)
Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO 2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the spaces provided or
otherwise check () the appropriate boxes □ or parenthesis ( ). Use additional sheets if necessary
and indicate this in the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance.
Total Project/Building
Footprint Area ______________________________________________________
(Area actually utilized)
Project Proponent: ______________________________________________________
Office Address: ______________________________________________________
Contact Person: ______________________________________________________
Designation: ______________________________________________________
Contact Information
Telephone Number: _________________________________________
Fax Number: _________________________________________
Mobile Number: _________________________________________
E-mail Address: _________________________________________
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
9. Drainage system
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
Water m3/day
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
LAND
þ Consistency with land Current land use w/in 1km radius þ See attached proof of compatibility with
use (as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
______________
Disturbance to wildlife Existing vegetation in the area: þ Compliance with conditions of DENR/LGU þ Annual inspection of area þ Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ re-vegetated construction /operation cost
clearing Marshland Permit
Grassland þ Limit land clearing as much as possible
Mangrove þ Provide temporary fencing for vegetation
Wetland that will be retained
Others, specify þ Promote restoration of damaged or
destroyed vegetation where possible (e.g.,
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
____________ tree planting);
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
steep (>18%) topsoil set aside for later use and allow Regular inspection for new __________________
Soil Erosion maximum re-use of spoils eroded areas near the site
Construction during dry season Others, specify
Stabilization of embankment with grasses _________________
or other soil cover
Others, specify
____________
þ Soil/Land contamination Existing soil type in the area: þ Implementation of the Ecological Solid þ Daily inspection of þ Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal clay Set-up temporary fence around the segregation
sandy-loam construction area þ Daily inspection for presence
Others, specify þ Implement re-use and recycling of waste of mixed garbage in the
materials facility
____________________
þ Implement proper segregation, collection þ Weekly inspection of waste
and disposal of domestic wastes in accumulated
designated areas Others, specify
Implement proper collection, labeling and _________________
storage of hazardous waste
þ Provide receptacles / bins for solid wastes
Coordinate with the municipal / city waste
collectors
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
Engage third party company for waste
collection
Others, specify
________________
Impairment of Presence of visually significant Implement landscaping and other Regular inspection of þ Cost integrated in the
visual aesthetics landforms/landscape/structures? beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
Others, specify zones
________________ þ Regularly monitor for
presence/absence of
complaints from adjacent
property owners
WATER
Increased siltation due Specify nearest/receiving water Provide ring canals around fuelling tanks/ Regular (ocular) inspection of þ Cost integrated in the
to project activities body: motor pool/ maintenance areas water body for: construction/ operation cost
Water quality ____________________________
þ Set-up proper and adequate sanitary Turbidity and/or silted
degradation facilities condition
Distance to nearest/receiving water Floating wastes or debris
Others, specify body: Strictly require the contractor and its
_______________ 0 to less than 0.5 km workers to observe proper waste disposal
and proper sanitation
0.5 to 1 km
More than 1 km
þ Strictly observe proper waste handling and
disposal
If nearest/receiving water body is Provision of wastewater treatment facility
fresh water, specify classification: (e.g. septic tank, oil and water separator,
etc.)
AA
A
Set up silt trap/settling ponds to minimize
downstream siltation
B
Others, specify
C ______________
D
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
If nearest/receiving water body is
coastal or marine water, specify
classification:
SA
SB
SC
SD
Competition in water Size of population using receiving Implement rainwater harvesting and similar þ Cost integrated in the
use surface water: measures as an alternative source of water þ Regularly monitor for construction/ operation cost
Depletion of water ≤ 1,000 persons Observe water conservation measures; presence/absence of
resources >1,000 and ≤ 5,000persons Others, specify complaints
>5,000person _________________ þ Regular coordination with
concerned agencies
Available/nearest water source. þ Regularly monitor for
Deepwell occurrences of water
Water district/LGU shortages
Surface water Others, specify
Others, specify ________________
________________
Increased occurrence Is the project site located in an area Use appropriate design for project facilities þ Regularly monitor for þ Cost integrated in the
of flooding identified by MGB/PAGASA as Implement appropriate drainage system presence/absence of construction/ operation cost
flood prone? complaints
Yes
Limit the depth and area of workspace
Regularly remove debris and other þ Regular coordination with
No
materials that may obstruct water flow concerned agencies
þ Regularly monitor for
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
Use appropriate technology (e.g. raised increased frequency of
hand-pumps) to protect drinking water from flooding
flood contamination Others, specify
Others, specify ____________________
___________________
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all þ Regularly monitor for þ Cost integrated in the
0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of construction/ operation cost
0.5 to 1 km generator, etc) complaints
More than 1 km Install when applicable, the appropriate air
pollution control device/s Regular (ocular) inspection of:
Strictly enforce good housekeeping Absence of white or black
practices smoke from vehicles,
Control vehicle speed to lessen generator, etc.
suspension of road dust Presence of truck cover
Conduct water spraying to suppress dust during deliveries
sources and minimize discomfort to
Quarterly monitoring of ambient
nearby residents
air for the following:
Use covered vehicles to deliver materials
TSP
that may generate dust
Other, specify
PM10
___________________ NOx
SOx
CO / CO2
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise þ Regularly monitor for þ Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, generator, etc.) presence/absence of construction/ operation cost
0.5 to 1 km Install when applicable, the appropriate complaints
More than 1 km noise control device/s (e.g., mufflers, Regular monitoring of buffer
silencer, sound barriers, etc.) zones
Implement appropriate operating hours
Provide adequate buffer Quarterly monitoring noise
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
(e.g. Perimeter planting of trees to serve as level
sound buffer and greenbelt)
Others, specify
_____________________
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance þ Presence/Absence of þ Cost integrated in the
residents in the project ≤ 1,000 persons compensation packages complaints construction/ operation cost
site and within its >1,000 and ≤ 5,000persons þ Prioritize local residents for employment þ Regular coordination with
vicinity
Displacement of
>5,000person þ Promptly pay local taxes and other LGU
Indigenous People
financial obligations Others, specify
Classification of host barangay:
Enhanced employment þ Regular coordination with LGU _________________
Urban
Prior consultation & coordination to
and/or livelihood Rural
opportunities minimize disruption on daily domestic
Reduced employment activities & respect for IP rights and
Available services within/near the cultural practices
and/or livelihood host barangay:
opportunities Ensure participation of IPs in consultations
Schools (e.g. elementary, and dialogues
Increased revenues for high school, college)
LGU Provide appropriate traffic/warning signs,
Health facilities (e.g., lighting, etc
Disruption/Competition clinics, hospitals, etc.)
in delivery of public Others, specify
services (e.g.,
Peace and order (e.g., _________________
police outpost, Brgy. Tanod,
education, peace and
etc.)
order, etc.)
Enhanced delivery of
Recreation and sports
facilities
public services (e.g.,
education, peace and Others, specify
order, etc.) ___________________
Increase in traffic
volume and worsening
of traffic flow
Impacts on community þ Regular coordination with LGU þ Regularly monitor for þ Cost integrated in the
health and safety presence/absence of construction/ operation cost
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
Others, specify Provide appropriate warning signs, lighting complaints
_______________ and barricades, whenever practicable þ Regular coordination with
þ Observe proper housekeeping LGU
Provide on-site medical services for any þ Regular submission of reports
emergency. to concerned agency
Participate in public awareness programs Others, specify
on health and safety ________________
Implement appropriate safety programs for
both community and workers
þ Strictly comply with fire, safety and similar
regulatory requirements
Strictly comply with requirements of RA
6969
Others, specify
_____________________
III. ABANDONMENT /DECOMMISSIONING/REHABILITATION POLICIES AND GENERIC
GUIDELINES (if Applicable)
Provide description of the Abandonment activities, such as, dismantling and waste disposal.
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial Environmental
Examination (IEE) Checklist Report are accurate and complete to the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising from any
misrepresentation or failure to state material information in this IEE Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant exhibiting
his/her Community Tax Certificate No. ___________________ issued at ______________________
on __________________________.