ALL DIMENSIONS AND LVLS ARE IN MM, UNLESS NOTED OTHER WISE. (U.N.O.)
21715 DISCLAIMER:-
BASEMENT F.F. LVL. BASEMENT F.F. LVL. THE PURPOSE OF THESE DRAWINGS AND INFORMATION CONTAINED
230
-3750 (AS/ARCH) -3750 (AS/ARCH) THEREIN IS TO ERECT, CONSTRUCT AND RESURRECT A STRUCTURE
2200 AND STRUCTURAL SYSTEM TO PERFORM IN A SATISFACTORY AND
ACCEPTABLE MANNER AS PER THE INFORMATION PROVIDED TO THE
01 T1 T2 T1
ORGANISATION FOR THE REQUIRED PURPOSE AND PERFORMANCE OF
1200
T2 THE STRUCTURE.
I
I I 10@200c/c II 10@200c/c
I
O II 10@200c/c
O O THE LOADS STRUCTURAL SYSTEM AND MATERIAL TO BE USED FOR
AS/SCHEDULE.
150
150
300 BOTHWAYS BOTHWAYS 300 300 BOTHWAYS CONSTRUCTION HAS BEEN ASSESSED VERIFIED AND ANALYSIS AND
D
300 300 300
~~
~~
~~
700
150
1300
IN DRAWING FORM FOR THE ABOVE SAID PURPOSE
F3
3815
1515
400
CF1
I
B1 I I 10@200c/c
O B1
300
WATER PROOFING
100
F4
I
500(TYP.)
300 300
I
1610 1564 P.C.C.(1:4:8)
B2
WATER PROOFING
AS/ SPECS. I 10@200c/c
O
BOTHWAYS 500(TYP.) P.C.C.(1:4:8) 300 B2 300 500(TYP.) I 10@200c/c
O AS/ SPECS. THE OWNER OF THE PROPERTY AND DEVELOPER ALONG WITH THE
I
BOTHWAYS SIZE(AxB) BOTHWAYS SUPERVISING ENGINEER NEED TO VERIFY THE SAFETY OF ENTIRE
SIZE(AxB)
CONSTRUCTION SEQUENCE ALONG WITH VARIOUS STAGES OF
Y
1300 X CONSTRUCTION TO ENSURE CORRECT AND SAFE ERECTION OF
1425
STRUCTURE. THE STRUCTURAL DRAWINGS SHOULD BE CORRECTLY
230
L L ACCESSED FOR STRUCTURAL PERFORMANCE, ADEQUACY OF DESIGN
AND VERIFIED BY A COMPETENT AND AUTHORISED AUTHORITY BEFORE
800
CONSTRUCTION SITE.
1140
T1
COLUMN SHIFTED IN ARCH. DRG
T1
ALL RELEVANT TESTING OF CONSTRUCTION MATERIAL AS PER B.I.S
F7 CODES (IS8112:1989,IS12289:1987, IS516:1959, IS269:1989, IS383:1970,
F6
2635
275 T2
IS650:1991, IS23386 - ALL PARTS) MUST BE DONE AT THE VARIOUS
745
745
STRUCTURE AND OTHER AFTER CONSTRUCTION MATERIAL ADEQUACY
03 Y
AND ITS PERFORMANCE FOR THE PURPOSE ITS BUILD, REMAINS AS THE
SOCIAL AND LEGAL RESPONSIBILITY OF THE PROPERTY OWNERS AND
945
X PROPERTY DEVELOPING AGENCY.
B
B
ANY NON-SATISFACTORY PERFORMANCE OF THE CONSTRUCTED
04
B
F10 BUILDING AND STRUCTURE, AFTER AND AS WELL AS DURING
CONSTRUCTION, WILL HAVE TO BE FURNISHED BEFORE A COMPETENT
415
ARBITRATOR (IIT'S AND OTHER VERIFY AGENCIES) ALONG WITH
VARIOUS COLLECTED TEST DATA AND MATERIAL DURING AND AFTER
CONSTRUCTION MANDATORY TESTS BEFORE VERIFYING AND
B1
3837
INFORMATION TO BE USED IN CONSTRUCTION.
B1
B2
B2
1200
21715
A 1200 150
05
1188
1427
TYPICAL ISOLATED FOOTING PLAN
SIDE FOOTING PLAN
230 F6
3323
900
1425
GROUND FL. FINISH LVL.
1446
+450 LVL.(AS/ARCH)
06
540
230 350
07 D6 (TYP.)
1375
1400
1725
8000
F11 F12
FOOTING CAN NOT POSSIBLE IN PUMP 1050 590 F13 DOM. TANK
1150 x 2000
1725
10000 LTRS.
LVL. -4650
F8
±00 PAVER
(AS/ARCH)
1
I
I 10@200c/c
6620
5930
I
1500 6100 x 5930 FIRE TANK GOOD FOR CONSTRUCTION (G.F.C.) FOR APPROVAL ONLY (F.A.O.)
1301
1864 200000 LTRS.
PUMP ROOM F3 515 lvl. -4950
lvl. -4650 FOR INFORMATION ONLY (F.I.O.) FOR SUBMISSION ONLY (F.S.O.)
1500
1300
F14
1000
1000
F14
FOR TENDER PURPOSE (F.T.P.) FOR SCHEMATIC PURPOSE (F.S.P.)
I
F4 I 10@200c/c
O
FOR PROOF CHECKING (F.P.C.) FOR ADVANCE COPY (F.A.C.)
EACH FACE
I
II 8@200c/c
08
2
FOUNDATION PLAN DATE REV DESCRIPTION DATE ISSUED AT NOS.
REVISIONS DISTRIBUTION
I
O
THIS DRAWING IS THE PROPERTY OF SUDHA TECHNICAL CONSULTANTS
FOOTING SCHEDULE: R.C.C. WORK AND NOT TO BE COPIED OR HANDED OVER TO A PARTY OR USED
CONSULTANTS
SUDHA TECHNICAL CONSULTANTS
CF1 2200 4730 600 #12@100c/c #12@100c/c #12@200c/c #12@200c/c
I
F3 3350 1900 600 #12@100c/c #12@100c/c _ _
I 12@200c/c
O E-mail:- stcplt@gmail.com
I
STCPL
F4 2500 2500 500 #12@100c/c #12@100c/c
_ _
STOPS Telephone-011-46140128,011-46120358,
I
_ _
II12@200c/c
O
F7 2650 2650 500 #12@125c/c #12@125c/c
+ -3750 LVL.(AS/ARCH)
I
F8 2075 3600 500 #12@100c/c #12@100c/c _ _
(B) OI 10@200c/c www.vga.co.in
(A)
I
603, CHIRANJIV TOWER 43, NEHRU PLACE, NEW DELHI-110019
F9 3550 3550 750 #16@150c/c #16@150c/c _ _ T 91 1126414763, 26410790, 46509432-34 F 91 11 26294062
1200
F10 1475 2500 400 _ _ CLIENT:
#12@100c/c #12@150c/c
_ _
AS/ARCH
F11 2250 4050 500 #12@100c/c #12@100c/c
FILLING
IN FIRE TANK PLZ. TAKE THK. BASE SLAB NO _ _ ~ ~ ~~ ~ ~
I 10@200c/c
I
F12 4100 4100 800 #16@100c/c #16@100c/c O
I
F13 3450 3450 750 _ _ BASEMENT F.F. LVL.
PROJECT TITLE
#16@150c/c #16@150c/c -3750 (AS/ARCH)
I
_ _ I 10@300c/c
O
FILLING TO BE DONE BELOW TANK F14 3950 2200 600 #16@150c/c #16@150c/c PROPOSED COMMERCIAL COMPLEX AT PLOT NO
I
CF2 7010 3355 700 #12@100c/c #12@100c/c #12@100c/c #12@100c/c I 10@200c/c
O A-1/1 NANIWALA BAGH AZADPUR DELHI.
I
COL R/F COL R/F
300 BOTH WAYS
(TYP.)
350
SAND
AS/ARCH
LIFT PIT LIFT PIT DRAWING TITLE
NOTES:-
~150 ~
SAND
ALL R.C.C. WORK SHALL BE DONE AS PER IS : 456-2000 .
STCPL
100
FOR RAFT TO BE = M:25
2 GRADE OF REINFORCEMENT = Fe500(HYSD)
(OF TESTED & APPROVED QUALITY) SCALE :
APPROVED :
500(TYP.)
AS/SCHEDULE.
I
I 10@200c/c
O
D
I
P.C.C.(1:4:8) I 10@100c/c
O BOTTOM TOP SIDE
CHECKED : PRAVEEN 1:100
I
------- -------- 40MM
I
IN COLUMN
230 970
BOTH WAYS IN PILE
IN PILE CAP
75MM
60MM
-------- 60MM
DESIGN : ARUSHI SHARMA REV. NO. :
300 300
B1 300 300
300 300
60MM 60MM
300 B2 300 300 300 300 300
P.C.C.(1:4:8) 4 DEVELOPMENT LENGTH FOR REINFORCEMENT (FOR Fe500) TOR STEEL
SIZE(AxB) 1200 DRAWN : S.PANCHAL
MIX OF CONC. BAR IN TENSION & BENDING BAR IN COMPRESSION
B A M 30 46 X d 46 X d
PROJECT :PRPOSED COMMERCIAL COMPLEX AZADPUR DRG. NO. :
M 25 49 X d 49 X d
FILE :
5 REFER THIS DRG. IN CORRELATION TO FOLLOWING
S-01-02
STRUCTURAL DRGS :S-01-01,S-1-03 DATE : 11th JUNE.2020