Project: Room Type Balcony –Block ( B)- Level ( intercontinental 3) Resort hotel Building Name/Level Balcony Room Number 301 1 Adjust the alignment of the A walls and rectify the skirting 2 Clean the surface of the skirting 3 Adjust the soffit of the beam 4 Adjust the bottom level of the aluminum sliding door frame 5 Adjust the verticality of the balustrade glass 6 Adjust the alignment of the shadow jab 7 Adjust the top of the sliding door frame silicon on top with painting 8 Adjust the width of the gap between the GRP fascia and the cement board ceiling. 9 Filling the gap between the GRP fascia and the GRP post 10 Complete the balustrade 11 Adjust the surface for the connection between GRP post and the block wall paint 12 Adjust the corner of the door frame 13 Adjust the soffit of the window 14 15 16 17 18 19 20 By: ENG/YASSER & ENG/ISLAM Date: 22-nov-2020 Snags/works Checked /Accepted by: