Room Snags Responsible Snag Close out

Sl.No Description of Item subcontractor Date Date


Project: Room Type Balcony –Block ( B)- Level (
intercontinental 3)
Resort hotel
Building Name/Level Balcony Room Number 301
1 Adjust the alignment of the
A walls and rectify the skirting
2 Clean the surface of the skirting
3 Adjust the soffit of the beam
4 Adjust the bottom level of the
aluminum sliding door frame
5 Adjust the verticality of the
balustrade glass
6 Adjust the alignment of the
shadow jab
7 Adjust the top of the sliding
door frame silicon on top with
painting
8 Adjust the width of the gap
between the GRP fascia and
the cement board ceiling.
9 Filling the gap between the
GRP fascia and the GRP post
10 Complete the balustrade
11 Adjust the surface for the
connection between GRP post
and the block wall paint
12 Adjust the corner of the door
frame
13 Adjust the soffit of the window
14
15
16
17
18
19
20
By: ENG/YASSER & ENG/ISLAM Date: 22-nov-2020 Snags/works Checked /Accepted by: