1.0 SCOPE OF WORK
The scope of work include manufacture, assembly, shop testing at manufacturer’s
shop, inspection by authorized agency, packing, transportation, supply and installation
of LIGHTNING PROTECTION SYSTEM
4.0 INSPECTION
The manufacturer shall carry out a comprehensive inspection and testing program
during manufacture for all bought out items and also workmanship during this stage.
The manufacturer shall submit the inspection program at least four weeks prior to the
purchaser. The manufacturer shall carry out all standard routine tests in accordance
with relevant IS. The manufacturer shall also carry out type tests in accordance with
relevant IS on one piece of one rating. While the routine tests shall be carried out at
manufacturer's works under prior information to purchaser, the type test certificates from
reputed test houses shall be submitted for purchaser's approval giving details of each
test and evaluation of test data. Tests which are common to both type and routine tests
may be covered under routine test in the presence of purchaser's representative, if
required.
4.01 TEST CERTIFICATE
The equipment covered under these specifications shall be Type tested in
accordance with relevant codes. The bidder shall supply at the time of execution the
routine test certificates from the manufacturer indicating the type of tests conducted
and the test results in accordance with relevant codes.
Page 2 of 9
4.02 STAGE INSPECTION
Purchaser reserves the right to carry out inspection at any stages of the process of
manufacture and assembly for which all facilities will be provided by the Supplier.
Before carrying out such inspection, necessary information will be given to the
manufacturer by the purchaser.
Page 3 of 9
c) Specification of material of construction of major parts/component along with
standard and chemical composition.
d) Catalogues/leaflets for all equipment including bought out items. Details of bought
out items with makes shall be given separately.
e) Time bar chart of delivery showing break up of time required for raw material
procurement engineering, various shop activities order placement for bought out
items and their delivery to shop assembly, testing inspection and dispatch.
5.2.2 To be supplied for approval after placement of order.
a) General arrangement drawing for the equipment/system including sections and
details giving relevant Information, binding dimension etc.
b) Quality assurance plan.
c) Time bar chart of delivery showing break up of time required for raw material
procurement engineering, various shop activities order placement for bought out
items and their delivery to shop assembly, testing inspection and dispatch.
SPECIFICATIONS
FOR LIGHTNING PROTECTION SYSTEM
4.0 CONSTRUCTION:
Lightning protection system shall be in strict accordance with IS-2309.
Page 4 of 9
defects and flaws. The copper conductor shall be in single maximum length to reduce
the number of joints during installation at site.
5.2 Lightning Discharge Receiver
Receiver: The Lightning Discharge Receiver shall be
manufactured, assembled and supplied as per the drawing provided along with
specifications.
5.3 Test Link:: the connection between down comer conductor and earthing pit shall be
through Test link, enclosed in a GI box. The details of the test link and GI box are
given in the drawing provided along with the specifications.
5.4 Clamp & Accessories:: The conductor clamp shall be constructed from brass (of
reputed makeake only), suitable for 25X3mm Tinned Copper Conductor. The design and
installation is shown in the figures given below.
Conductor clamp
Conductor clamp
Conductor support
pyramid holdfast
6.0 INSTALLATION:
6.1 Down conductor from lightning discharge receiver shall be effectively connected to an
independent earth pit by Tinned Copper Strip of 25X3 mm.
6.2 Lightning Discharge Receiver shall be provided on any structure having height 15
metre or more. The height of the receiver above its fixing point on the structure shall
be 2 metre. The spacing between two adjacent receivers shall not be more than 20
metres.
6.3 Lightning conductor shall be of 25
25X3 mm tinned copper strip when used above ground
level. It shall be connected through test link with earth electrode/ earthing system.
6.4 The Bidder shall furnish the details including typical arrangement drawings for the
lightning protection system offered
6.5 Down conductors shall be as short and straight as practicable and shall follow a direct
path to earth. Down conductor shall not be connected to other earthing conductors
above ground level. The size of down conductor from each receiver shall not be lower
than 25X3 mm. Each down conductor shall be effectively connected to independent
earthing pit.
6.6 Each down conductor shall be provided with a test link at 1000 mm above ground level
for testing.
6.7 All joints in the down conductors shall be of brazing type. The brazing procedure shall
be prepared as per ASME Sec Sec-IX
IX and submitted for approval including
includ the brazing
filler material alloy.
6.8 Down conductors shall be cleated on outer side of building wall, at 500mm interval or
welded to outside building columns at 1000 mm interval
interval. The cleating shall be carried
out with brass conductor clamps as shown abo above.
6.9 Lightning conductor on roof shall not be directly cleated on surface. Supporting
holdfast blocks of PCC/insulating material shall be used for conductor fixing as shown
above.
Page 5 of 9
6.10 The building on which installation of down conductor is to be carried out having
maximum height of 40.
6.11 All metallic structures within a vicinity of two meters of the conductors shall be bonded
to conductors of lighting protection system.
6.12 Lightning conductors shall not pass through or run inside GI Conduits.
6.13 The lightning protection system shall not be through cables, conduits and metal
enclosures of electrical equipment.
6.14 Testing link shall be made of Tinned Copper Strip of size 40X5mm and enclosed
inside a GI box.
7.0 TESTING:
The system after installation at site will checked and tested by the engineer in-
charge. The system will be checked for the workmanship, alignments and
material. The resistance measurement of the system will be carried out with
micro-ohm meter. Other tests will be carried out as prescribed in the applicable
standards.
Page 6 of 9
of the contract. Beyond the unit rates, no extra payment will be allowed for
incidental or contingent work, labour, materials and plant.
4. The rates quoted by the bidder shall also include for:
- Supplying, transporting to site, unloading, protecting and installation of
materials in accordance with the specifications.
- Protecting all installed equipment in the area of work falling within the scope
of this contract.
- Following all the safety and security rules and regulations as required by the
Department including deploying supervisor exclusively for safety.
5. Bidders shall go through the technical specifications and provide in the offer point
by point compliance. The technical deviations, (if any) shall be indicated clearly in
the offer. Kindly note that no further communication will be made to get the
technical clarifications. The offers without this information will be rejected without
any consideration.
6. The contractor shall bring his own tools, tackles, ladders etc. required at site for
installation work. Department will not provide any tool/tackles at site.
7. The electricity and water required at site (for very small tools/tackles like
drilling/cutting machine) will be provided to the contractor at a single point, from
where contractor have to make his own arrangement through extension boards etc.
Prior to connection of electrical equipments contactor have obtain written clearance
from Engineer in-charge.
8. The technician required to carry out the electrical work shall be skilled and have
requisite qualification/certificates. The documents are to be provided (in original) to
engineer in-charge, before commencement of work at site. Unqualified/unskilled
technician, workers will not be allowed to work at site.
9. All the safety precautions as per applicable code and practices shall be followed at
site. The PPE shall strictly be used by workers while working at site. The safety
instructions issued by engineer in-charge shall be followed in all respect. The
contractor will be responsible for any injury/accident occurring at site, due to any
reason, department will not pay or liable for any compensation.
10. The site is restricted area and permission to the personnel coming inside the
premises for installation work, require security clearances. Hence firm has to obtain
Police Verification Certificates (PVC) from Police Commissioner Officer (not local
police)/District Magistrate office, for all the persons coming inside the premises for
work.
11. Firms who have not worked inside the DAE units (BARC/NPCIL) in past have to
go through vetting procedure.
12. The entry passes for personnel coming inside premises are made by Security Section
and require local residence proof (Mumbai/Thane) & identification proof along
with PVC.
Annexure-1
BOQ for Lightning Protection
Page 7 of 9
25X3mm STRIP
FROM ROOF
45° 45° CONDUCTOR
25
20
SPIKE 90° THREADED
COPPER TEST LINK
25
40X5MMX230LONG
50
20
Ø40
M8 HEX HEAD
BRASS BOLT –
10
70
30
10
WASHER
100
Ø70
64
12
10
THREADED
COPPER EARTH
230
10
Ø40
THREADED STRIP TO EARTH
PIT
8
Ø8
600
70
MATL- COPPER
QTY. 5Nos. PER UNIT
20
THREADED
32X6MM COPPER 25
50
BRASS COUPLING
STRIP TO EARTH
32
Ø125
4Nos. M6 BRASS BOLTS WITH NUT
& WASHER AT 90° (90PCD)
STATION
Ø38
WITH GI PIPE
6
TEST LINK
50mm DIA. GI PIPE 900 LONG
900
THREADED
Ø62
CLEAR HOLES FOR M10 BOLTS – 4Nos. AT 90°
40
Ø125
Drg.No.-1: LIGHTNING DISCHARGE RECEIVER
LIGHTNING PROTECTION DOWN CONDCUTOR 25X2MM Cu.
A
GALVANISED BOX 2MM THICK SHEET STEEL
PVC TUBING TO BE SEALED WITH EPOXY COMPOUND
WATERTIGHT AFTER INSTALLATION OF CONDUCTOR
30
2
MOUNTING ON WALL
4 6Ø 15LG.
Cu. LINK 40X5 X 230 BOLT
100
100
M8 25LG.HEX HEAD BRASS
150
190
60
150
(TYP)
300 (min.)
20
10
EARTHING CONDUCTOR
SECT A-A