Tender Inviting Authority: Superintending Engineer, PWD, North Bengal Construciton Circle-I, Jalpaiguri.
Name of Work: Construction of CMOH Office complex within the premises of Alipurduar District Hospital, Alipurduar during the year
2016-2017.
Contract No: WBPWD/SE/NBCC-I/NIT- 29/2016-2017
Bidder MACKINTOSH BURN LIMITED
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be
rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #

Sl. Item Description Quantity Units Estimated TOTAL TOTAL AMOUNT


No. Rate AMOUNT In Words
Without Taxes
1 2 4 5 6 53 55
1 Earth work in excavation of foundation trenches or drains, in all 3103.875 %m3 12047.00 #VALUE! #VALUE!
sorts of soil (including mixed soil but excluding laterite or
sandstone) including removing, spreading or stacking the spoils
within a lead of 75m. as directed. The item includes necessary
trimming the sides of trenches, levelling, dressing and ramming
the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1,500 mm.

1.01 Depth of excavation for additional depth beyond 1,500 mm. and 3103.875 %m3 19430.00 #VALUE! #VALUE!
upto 3,000 mm. but not requiring shoring.
1.02 Depth of excavation for additional depth beyond 3000 mm. upto 310.387 %m3 23704.00 #VALUE! #VALUE!
4000mm. excluding cost of shoring as necessary.

2 Single Brick Flat Soling of picked jhama bricks including ramming 3152.73 m2 340.00 #VALUE! #VALUE!
and dressing bed to proper level and filling joints with local sand.

3 Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 79.50 m3 4644.00 #VALUE! #VALUE!
mm nominal size) excluding shuttering and reinforcement,if any, in
ground floor as per relevant IS codes.
River bazree

4 Cement concrete with 30 mm down graded shingles excluding 309.630 m3 3835.00 #VALUE! #VALUE!
shuttering.
N.B. Variety
In ground floor
1:3:6 proportion

5 Earth work in filling in foundation trenches or plinth with good 3571.498 %m3 7831.00 #VALUE! #VALUE!
earth, in layers not exceeding 150 mm. including watering and
ramming etc. layer by layer complete. (Payment to be made on the
basis of measurement of finished quantity of work)
With earth obtained from excavation of foundation.

6 Filling in foundation or plinth by fine sand in layers not exceeding 2542.180 %m3 66393.00 #VALUE! #VALUE!
150 mm as directed and consolidating the same by thorough
saturation with water, ramming complete including the cost of
supply of sand. (payment to be made on
measurement of finished quantity)

1 of 28
7 Batch Mixed concrete of M 25 Grade with well Graded stone chips of 20 1258.525 m3 7530.15 #VALUE! #VALUE!
mm nominal size containing designed quantity of cement per Cu. M of Wet
concrete produced in computerisedbatching plant under controlled condition
using approved super plasticizer designing concrete mix following I.S
10262 and I.S. 456 transporting the mix with agitation in transit mixer to
work site depositing the mix on a platform erected for the purpose at
required level of concreting and then placing the mix in its final location of
form work compacting and curing the same complete as per specification
and direction of the Engineer-in-charge including hire charges of
computerised batching plant, transit mixer with all accessories vibrators etc.
inclusive of all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting staging which
would be paid through separate item. Consumption of cement will not be
less than 300 Kg of cement per cubic meter of controlled concrete but
actual consumption will be determined on the basis of preliminary test and
job mix foumula. [Cement to be supplied by agency]
[with Batching Plant & transit mixer] In Ground Floor& Foundation. [Pakur
Variety].
With approved concrete pump.

7.01 1st floor 470.031 m3 7550.15 #VALUE! #VALUE!

7.02 2nd floor 455.945 m3 7570.15 #VALUE! #VALUE!

7.03 3rd floor 491.343 m3 7590.15 #VALUE! #VALUE!

7.04 4th floor 120.897 m3 7610.15 #VALUE! #VALUE!

8 Hire and labour charges for shuttering with centering and 5812.290 m2 474.00 #VALUE! #VALUE!
necessary staging upto 4 m using approved stout props and thick
hard wood planks of approved thickness with required bracing for
concrete slabs, beams and columns, lintels curved or straight
including fitting, fixing and striking out after completion of works
(upto roof of ground floor)
Steel shuttering form, made out of 2mm thk (14 SWG) M.S Sheet
welded with peripheral angle - Stiffner(40x40x5) frame work and
placed over suitable Telescopic/ Adjustable Span (2.45-4.16m)
weighing > 39 kg (SO+SI) & supported by
approved adjustible telesscopic prop (2.50-4.25m) weighing > 18.5
kg .

8.01 1st floor 3667.322 m2 492.00 #VALUE! #VALUE!

8.02 2nd floor 3572.228 m2 510.00 #VALUE! #VALUE!

8.03 3rd floor 3572.228 m2 528.00 #VALUE! #VALUE!

8.04 9 to 12 mm thick approved quality plyboard shuttering in any 571.677 m2 846.00 #VALUE! #VALUE!
concrete work (For Grid beam)
3rd Floor

8.05 4th floor 971.002 m2 546.00 #VALUE! #VALUE!

9 Reinforcement for reinforced concrete work in all sorts of 246.986 M.T 58708.91 #VALUE! #VALUE!
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary),
cutting to requisite length, hooking and bending to correct shape,
placing in proper position and binding with 16 gauge black
annealed wire at every intersection, complete as per drawing and
direction.
For works in foundation, basement and upto roof of ground
floor/upto 4 m
Tor steel/Mild Steel
Ground Floor

9.01 1st floor 92.244 M.T 59148.91 #VALUE! #VALUE!

9.02 2nd floor 89.479 M.T 59588.91 #VALUE! #VALUE!

2 of 28
9.03 3rd floor 96.426 M.T 60028.91 #VALUE! #VALUE!

9.04 4th floor 23.726 M.T 60468.91 #VALUE! #VALUE!

10 Brick work with 1st class bricks in cement mortar (1:4) 229.875 m3 5592.00 #VALUE! #VALUE!
In foundation and plinth

11 250 mm th. Autoclave aerated concrete block Work with size 625 181.60 m3 6372.00 #VALUE! #VALUE!
mm x 250 mm x 125 mm- Grade-I,having drying Shrinkage less
than 0.05% conforming to IS: 2185 ( Part-3)-1984 made up of fly
ash(conforming to IS: 3812-1981, with permissible loss on ignition
upto 6% ), lime , cement and laid in Cement Mortar (1:6) complete
in all respect as per direction & satisfaction of Engineer -in Charge
.
In Super Structure, Ground Floor.

11.01 1st floor 192.00 m3 6484.00 #VALUE! #VALUE!

11.02 2nd floor 192.00 m3 6596.00 #VALUE! #VALUE!

11.03 3rd floor 192.00 m3 6708.00 #VALUE! #VALUE!

11.04 4th floor 42.48 m3 6820.00 #VALUE! #VALUE!

12 125 mm thick Autoclave aerated concrete block Work with size 1115.04 m2 820.00 #VALUE! #VALUE!
625 mm x 250 mm x 125 mm- Grade-I,having drying Shrinkage
less than 0.05% conforming to IS: 2185 ( Part-3)-1984 made up of
fly ash(conforming to IS: 3812-1981, with permissible loss on
ignition upto 6% ), lime , cement and complete in all respect as per
direction & satisfaction of Engineer -in Charge .
laid in Cement Mortar (1:6) -In Super Structure, Ground Floor.

12.01 1st floor 1256.89 m2 832.00 #VALUE! #VALUE!

12.02 2nd floor 1240.89 m2 844.00 #VALUE! #VALUE!

12.03 3rd floor 1240.89 m2 856.00 #VALUE! #VALUE!

12.04 4th floor 562.80 m2 868.00 #VALUE! #VALUE!

13 Polymer concrete made with water resistant bonding agent 30.49 m3 5197.00 #VALUE! #VALUE!
ofsynthetic rubber emulsion as per manufacturer's specification
excluding the cost of cement concrete (2.75 Kg / bag of cement)
Note : Payment on volume of (1 : 1½ : 3) Concrete.

14 Applying epoxy based reactive joining agent for joining the old 100.00 m2 356.00 #VALUE! #VALUE!
concrete with fresh concrete to be applied within manufacturer's
specified time as per manufacturers specification. (0.4 Kg / m² of
concrete surface).

15 25 mm. thick damp proof with cement concrete (1:1.5:3) (with 93.03 m2 307.00 #VALUE! #VALUE!
graded stone aggregate 10 mm. normal size) and painting the top
surface with a coat of bitumen [VG.40 ] using 1.7 kg. per sq.m.
including heating the bitumen and cost and carriage of all
materials complete. [Bitument to be supplied by the Agency]

16 Supplying, fitting and fixing Fan Hook for ceiling with 1 metre long 200 each 107.00 #VALUE! #VALUE!
16mm. dia rod complete including mending damages. Payment for
damage and repair to be made separately.

17 Dismantling all types of plain cement concrete works, stacking 5.00 m3 949.00 #VALUE! #VALUE!
serviceable materials at site and removing rubbish as directed
within a lead of 75m.
In ground floor including roof.
upto 150 mm. thick

3 of 28
18 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar 1715.00 m2 197.00 #VALUE! #VALUE!
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
With 1:4 cement mortar
20 mm thick plaster

18.01 With 1:4 cement mortar 1072.00 m2 201.00 #VALUE! #VALUE!


20 mm thick plaster
1st floor

18.02 With 1:4 cement mortar 1072.00 m2 205.00 #VALUE! #VALUE!


20 mm thick plaster
2nd floor

18.03 With 1:4 cement mortar 1072.00 m2 209.00 #VALUE! #VALUE!


20 mm thick plaster
3rd floor

18.04 With 1:4 cement mortar 637.00 m2 213.00 #VALUE! #VALUE!


20 mm thick plaster
4th floor

18.05 With 1:4 cement mortar 2310.00 m2 169.00 #VALUE! #VALUE!


15 mm thick plaster
Ground floor

18.06 With 1:4 cement mortar 2820.00 m2 173.00 #VALUE! #VALUE!


15 mm thick plaster
1st floor

18.07 With 1:4 cement mortar 3271.86 m2 177.00 #VALUE! #VALUE!


15 mm thick plaster
2nd floor

18.08 With 1:4 cement mortar 3247.00 m2 181.00 #VALUE! #VALUE!


15 mm thick plaster
3rd floor

18.09 With 1:4 cement mortar 367.72 m2 185.00 #VALUE! #VALUE!


15 mm thick plaster
4th floor

18.10 With 1:4 cement mortar 1360.00 m2 135.00 #VALUE! #VALUE!


10 mm thick plaster
Ground floor

18.11 With 1:4 cement mortar 1390.00 m2 139.00 #VALUE! #VALUE!


10 mm thick plaster
1st floor

18.12 With 1:4 cement mortar 1350.00 m2 143.00 #VALUE! #VALUE!


10 mm thick plaster
2nd floor

18.13 With 1:4 cement mortar 1450.00 m2 147.00 #VALUE! #VALUE!


10 mm thick plaster
3rd floor

18.14 With 1:4 cement mortar 355.00 m2 151.00 #VALUE! #VALUE!


10 mm thick plaster
4th floor

19 M.S. structural works in columns, beams etc. with simple rolled structural 4.00 M.T 72749.77 #VALUE! #VALUE!
members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 &
SP (6)- 1964 connected to one another with bracket, gussets, cleats as per
design, direction of Engineer-incharge complete including cutting to requisite
shape and length, fabrication with necessary bolting, metal arc welding
conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and
brand conforming to IS:814- 1957, haulage, hoisting and erection all complete.
The rate includes the cost of rolled steel section, consumables such as
electrodes, gas and hire charge of all tools and plants and labour required for
the work including all incidental chages such as electricity charges, labour
insurance charges etc. Payment to be made on the basis of calculated weight of
structural members only in finished work as per IS specified weight. Payment for
gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual
weight of such items with the weight of finished structural members or 7% of
weight for finished structural members weighing not less than 22.5 Kg. / m. or 15
% of weight for finished structal members weighing less than 22.5 Kg. / m. may
be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate
payment being made for these items, as per direction of Engineer In Charge.
The rates are considered for a height of erection 8m. / 2nd floor level from the
ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond
initiial 8m. or part thereof.
I) For structural members of specified sections weighing less than 22.5 Kg./m
4th floor

4 of 28
20 Supplying, fitting & fixing UPVC pipes A- Type and fittings 180.00 m 291.00 #VALUE! #VALUE!
conforming to IS:13592-1992 with all necessary clamps nails,
including making holes in walls, floor etc. cutting trenches in any
soil through masonry concrete structures etc if necessary and
mending good damages including joining with jointing materails
(Spun Yarn, Valamoid/Bitumen/M-Seal etc)
complete.
UPVC Pipes:
110 mm. Dia

20.01 UPVC Fittings: 24 each 162.00 #VALUE! #VALUE!


Bend 87.5 degree
110 mm. Dia

20.02 UPVC Fittings: 12 each 128.00 #VALUE! #VALUE!


Shoe
110 mm. Dia.

21 Supplying, fitting & fixing Glass mosaic tiles at finished plain wall 160.00 m2 2681.00 #VALUE! #VALUE!
surface of size 20 mm x 20 mm x 4 mm in all colour, design , fixing
in customize design as per direction of Engineer-in- Charge. The
glass mosaic tiles to be fixed on the wall surface with the help of
approved adhesive applied at the rate of 2.5 kg per sqm and
grouting of the same. The rate is inclusive of all operation, material
and required pattern approved by Engineer-in-Charge. [At Ground
Floor]
iv) Repeated pattern/ Border Aligned Type

21.01 1st floor 135.00 m2 2831.00 #VALUE! #VALUE!

21.02 2nd floor 160.00 m2 2981.00 #VALUE! #VALUE!

21.03 3rd floor 182.00 m2 3131.00 #VALUE! #VALUE!

22 Supplying & laying 3mm thick pre-fabricated plastomeric water 1685.00 m2 466.00 #VALUE! #VALUE!
proofing membrane conforming to EN 12311-1 & ASTMD 5147,
manufactured with atactic poly propylene (APP) modified premium
grade asphalt , specially reinforced with non-woven polyester core
with polyester reinforcement @160gms per sqm & both faces
covered with thermo-fusible polyethylene film/MineraL on top face
over a coat of primer @ 0.40 lit/sqm of manufacturer's
specification on smooth,clean dry surface prepared wherever
required.Lap joint shall be provided of 75 mm in longitudinal & 100
mm in transverse direction and fused using LPG/ Propane torch
employing extra care ensuring full bondage,complete removal of
entrapped air and sealing edges into grooves in appropriate
manner as per direction of Engineer -in-charge all complete
including materials,labour and applicable taxes. (Payment shall be
made on the basis of finished surface area.).
Membrane Property: Softening Point > 150 deg C, Cold
Flexibility < -6 deg C, Tensile Strength, N/cm : 600
(longitudinal), 450 (transverse), Tearing Strength, N:
300 (longitudinal), 200 (transverse)

23 Applying Exterior grade Acrylic primer of approved quality and 1275.00 %m2 4899.00 #VALUE! #VALUE!
brand on plastered or cencrete surface old or new surface to
receive decorative textured(matt finish) or smooth finish acrylic
exterior emulsion paint including scraping and preparing the
surface throughly, complete as per manufacturer's specification
and as per direction of the EIC.
In Ground Floor:
Two Coats

23.01 1st floor 1110.00 %m2 4971.00 #VALUE! #VALUE!

23.02 2nd floor 1110.00 %m2 5043.00 #VALUE! #VALUE!

23.03 3rd floor 1110.00 %m2 5115.00 #VALUE! #VALUE!

23.04 4th floor 846.00 %m2 5187.00 #VALUE! #VALUE!

5 of 28
24 Protective and Decorative Acrylic exterior emulsion paint of 1430.00 m2 108.00 #VALUE! #VALUE!
approved quality, as per manufacturer's specification and as per
direction of EIC to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental
charges but excluding the cost of primer.
In Ground floor (Two Coat)
Super Protective 100% Acrylic Emulsion.

24.01 1st floor 1245.00 m2 108.72 #VALUE! #VALUE!

24.02 2nd floor 1245.00 m2 109.44 #VALUE! #VALUE!

24.03 3rd floor 1245.00 m2 110.16 #VALUE! #VALUE!

24.04 4th floor 846.00 m2 110.88 #VALUE! #VALUE!

25 Supplying, fitting & fixing granite slabs 15mm to 18 mm. thick with 145.00 m2 3688.00 #VALUE! #VALUE!
uniform texture & without decorative veins in columns, wall,
facia,rise etc. with 15 mm thick [avg] cement mortar (1:2) including
making suitable arrangements to hold the stones properly by brass
/ copper hooks including pointing in cement mortar (1:2) (1 white
cement : 2 marble dust) with admixture of pigment matching the
stone shades all complete as per direction of the Engineer-
incharge including cost of all materials, labours, scaffolding,
staging, curing and roughening of concrete surface complete.
[Using cement slurry at back side of granite @ 4.4 kg/sq.m & white
cement slurry for joint filling @ 1.8 kg/sq.m]
In ground floor
Area of each Granite slab above 1.00 Square meter.

25.01 1st floor 134.90 m2 3700.00 #VALUE! #VALUE!

25.02 2nd floor 134.90 m2 3712.00 #VALUE! #VALUE!

25.03 3rd floor 134.90 m2 3724.00 #VALUE! #VALUE!

26 supplying,fitting & fixing granite slab 15mm to 18mm thick in floor, 48.00 m2 3518.00 #VALUE! #VALUE!
lobby, stair, landing and treads etc. over 20mm (avg) thick base of
cement morter (1:2) laid with white cement slurry @ 4.40Kg per
Square meter before placing of granite and jointed with white
cement slurry @ 2.0 Kg per square meter with necessary
pigments and complete as per direction of Engineer-in-charge
including cost of all materials, labours, curing and roughening of
concrete surface complete.
In ground floor
Area of each Granite slab above 1.00 Square meter.

26.01 1st floor 43.80 m2 3530.00 #VALUE! #VALUE!

26.02 2nd floor 43.80 m2 3542.00 #VALUE! #VALUE!

26.03 3rd floor 43.80 m2 3554.00 #VALUE! #VALUE!

27 Supplying, fitting & fixing true to line and level digital elevation 950.00 m2 1128.00 #VALUE! #VALUE!
Ceramic tiles of approved brand conforming to IS:15622:2006
Group B III and tested as per IS:13630:2006 as ornamental
cladding on external wall in natural stone, brick, wood, bamboo
pattern/ design fixed with adhesive 4.5 mm thick at the back of
each tile & finishing the joints with white cement mixed with
colouring oxide if required to match the colour of tiles including
roughening of concrete surface, if necessary or by synthetic
adhesive & grout materials etc. With polymerised adhesive and
epoxy grout pointing including spacer - 2mm (When tiles are laid
over existing hard ready surface) all complete as per direction of
Engineer-incharge.
Ground floor

6 of 28
27.01 1st floor 1391.00 m2 1140.00 #VALUE! #VALUE!

27.02 2nd floor 1382.00 m2 1152.00 #VALUE! #VALUE!

27.03 3rd floor 1217.00 m2 1164.00 #VALUE! #VALUE!

28 Supplying and laying true to line and level Double Charge Vitrified 486.00 m2 3066.00 #VALUE! #VALUE!
Tiles of approved brand conforming to IS 15622: 2006 (Group B I
a) and tested as per IS 13630:2006 (relevant parts) [Non-modular
sizes for tiles with Water Absorption (av.) ≤ 0.08 %] in floor,
skirting etc. using polymerised adhesive of 6mm thick layer applied
directly over finished artificial stone floor/Mosaic etc without any
backing course and joints grouted with admixture of white epoxy
grout materials of approved brand including spacer -2mm as
directed and removal of wax coating of top surface of tiles with
warm water and polishing the tiles using soft and dry cloth upto
mirror finish complete including the cost of materials,Iabour and all
other incidental charges complete as per direction of Engineer-in-
Charge. (Note: This work should not be executed without specific
permission of Superintending Engineer)
ln Ground FIoor:(size not Iess than 800mmX 800 mm X 10.2 mm
thick)
Ground floor

28.01 1st floor 1007.00 m2 3078.00 #VALUE! #VALUE!

28.02 2nd floor 1006.00 m2 3090.00 #VALUE! #VALUE!

28.03 3rd floor 1087.00 m2 3102.00 #VALUE! #VALUE!

29 18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) 290.00 m2 1143.00 #VALUE! #VALUE!
cement mortar (1:4) in floor, stair & lobby including pointing in
cement slurry with admixture of pigment matching the stone
shade, including grinding & polishing as per direction of Engineer -
in - charge to match with the existing work. [Slurry for bedding @
4.4kg/Sq.m and pointing @2.0 kg/Sq.m]

30 Supplying, fitting and fixing 18 mm. to 22 mm. thick kota stone 48.50 m2 1286.00 #VALUE! #VALUE!
slab in wall, dado in 15 mm thick [avg] cement mortar (1:3)
including making suitable arrangement to hold the stone properly
by brass / copper hooks including pointing in cement mortar (1:2)
(1 cement : 2 marble dust) with admixture of pigments matching
the stone shade, including grinding and polishing all complete as
per direction of Engineer-in-charge including cost of materials,
labour, scaffolding, staging, curing complete.
[Using cement slurry for bedding @4.4 kg/Sq.m and for jointing
@1.8 kg/Sq.m]

31 Supplying fitting and fixing 15 to 18 mm thick Marble slab/Tile in 47.00 m2 1990.00 #VALUE! #VALUE!
riser of step or skirting (upto 300 mm ht) over 15mm (avg) thick
base of Cement mortar (1:2) laid with white cement slurry @ 4.4
kg/ Sq.m at back side of marble and jointed with white cement
slurry @ 2.2 kg/ Sq.m with necessary pigments including grinding
and Granite Polishing. [White cement and Pigment to be supplied
by the Agency]
With Chawk Doongri
Area of each tile upto 0.3 sq.m.

31.01 1st floor 52.05 m2 2002.00 #VALUE! #VALUE!

31.02 2nd floor 53.50 m2 2014.00 #VALUE! #VALUE!

31.03 3rd floor 54.00 m2 2026.00 #VALUE! #VALUE!

31.04 4th floor 32.50 m2 2038.00 #VALUE! #VALUE!

7 of 28
32 Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm 215.00 m2 4429.00 #VALUE! #VALUE!
thickness in floor, lobby, stair, landing & treads etc. over 20mm
(av.) thck base of Cement mortar (1:2) laid with white cement
slurry @ 4.4 kg/Sq.m before placing marble & jointed with white
cement slurry @ 2.0 kg/Sq.m with necessary pigments including
grinding and Granite polishing as per direction of Engineering -in
-Charge in Ground Floor. {White cement and Pigment to be
supplied by the Agency]
With Chawk Dungri
Area of each slab/tile exceeding 1.00 sq.m (This item to be
executed on Specific permission of Superintending Engineer)

32.01 1st floor 176.00 m2 4441.00 #VALUE! #VALUE!

32.02 2nd floor 176.00 m2 4453.00 #VALUE! #VALUE!

32.03 3rd floor 179.00 m2 4465.00 #VALUE! #VALUE!

32.04 4th floor 69.00 m2 4477.00 #VALUE! #VALUE!

33 Extra cost of labour for prefinished and premoulded Nosing to 552.00 m2 261.00 #VALUE! #VALUE!
treads of steps, railing, window sill etc. of Marble Stone.

34 Wood work in door and window frame fitted and fixed in position 1.065 m3 94368.00 #VALUE! #VALUE!
complete including a protective coat of painting at the contact
surface of the frame exluding cost of concrete, Iron Butt Hinges
and M.S clamps. (The quantum should be correted upto three
decimals).
Sal : Siliguri

34.01 1st floor 1.462 m3 94568.00 #VALUE! #VALUE!

34.02 2nd floor 1.460 m3 94768.00 #VALUE! #VALUE!

34.03 3rd floor 1.460 m3 94968.00 #VALUE! #VALUE!

34.04 4th floor 0.190 m3 95168.00 #VALUE! #VALUE!

35 Supplying, fitting and fixing M.S. clamps for door and window 510 each 33.00 #VALUE! #VALUE!
frame made of flat bent bar, end bifurcated with necessary screws
etc. by cement concrete(1:2:4) as per direction. (Cost of concrete
will be paid separately)
40mm X 6mm, 250mm Length

36 Iron butt hinges of approved quality fitted and fixed with steel 340 each 52.00 #VALUE! #VALUE!
screws, with ISI mark.
100mm. X 58mm. X 1.90mm.

37 Anodised aluminium barrel / tower / socket bolt (full covered) of 85 each 103.00 #VALUE! #VALUE!
approved manufactured from extruded section conforming to I.S.
204/74 fitted and fixed with cadmium plated screws:
150mm long x 12mm dia. bolt.

37.01 225mm long x 10mm dia. bolt. 85 each 134.00 #VALUE! #VALUE!

38 Anodised aluminium Aldrop / Sliding bolts of approved quality 85 each 347.00 #VALUE! #VALUE!
manufactured from extruded section conforming to I.S.
specification (I.S. 2681/66) fitted and fixed complete.
300mm x 19mm dia. bolt.

39 Anodised aluminium decorative handle (hexagonal / fluted) of 170 each 114.00 #VALUE! #VALUE!
approed quality fitted and fixed complete.
175mm plate x 12mm dia rod x 60mm hexagonal / fluted.

40 Door stopper.(Brass) 85 each 134.00 #VALUE! #VALUE!

8 of 28
41 Supplying solid flush type doors of deluxe decorative (both side) 33.77 m2 4689.00 #VALUE! #VALUE!
quality, conforming to I:S 2202 timber frame consisting of top and
bottom rail and side styles of well seasoned timber
65mm wide each and the entire frame fitted with 27.5mm wide
battens places both ways in order to made the door of solid core
and internal lipping with teak, mahogony or rose wood approved
decorative veneers using phenol formaldehyde as glue etc.
complete, including fitting, fixing the shutters in position but
excluding the cost of hinges and other fittings in ground floor:
35mm thick shutters (single leaf)

41.01 1st floor 46.15 m2 4704.00 #VALUE! #VALUE!

41.02 2nd floor 46.25 m2 4719.00 #VALUE! #VALUE!

41.03 3rd floor 46.00 m2 4734.00 #VALUE! #VALUE!

41.04 4th floor 6.18 m2 4749.00 #VALUE! #VALUE!

42 Supplying, fitting & fixing fibre reinforced polymer (FRP) 89.00 m2 3263.00 #VALUE! #VALUE!
Composite door shutters as per approved design with glass fibre
reinforced plastic moulded skins and a special sandwich
core, so as to impart monolitaheic composite structure as per
approved technology of Department of Science and Technology
(DST) to satisfy IS:4020 door testing performance criteria.
In ground floor.
(i) 32 mm thick

43 Supplying, fitting and fixing fibre reinforced polymer (FRP) 168.00 m2 525.00 #VALUE! #VALUE!
Composite door frame as per approved section with glass fibre
reinforced plastic moulded skins and a special sandwich
core, so as to impart monolitaheic composite structure as per
approved technology of Department of Science and Technology
(DST) to safisfy IS: 4020 door testing performance criteria
(ii) 66mm x 70mm

44 Panel shutters of door and window, as per design (each panel 6.18 m2 7305.00 #VALUE! #VALUE!
consisting of single plank without joint), including fitting and fixing
the same in position but excluding the cost of hinge and other
fittings.
In ground floor.
(In case of non-supply of single plank, penal rate of reduction of
20% will be made)
50mm thick shutters with 25mm thick panel of size 30 to 45 cm
1st class best Indian teak.

45 Priming one coat on timber or plastered surface with synthetic oil 162.00 m2 41.00 #VALUE! #VALUE!
bound primer of approved quality including smoothening surfaces
by sand papering etc.

45.01 (b) Priming one coat on steel or other metal surface with synthetic 475.00 m2 31.00 #VALUE! #VALUE!
oil bound primer of approved quality including smoothening
surfaces by sand papering etc.

46 Painting with best quality synthetic enamel paint of approved make 162.00 m2 89.00 #VALUE! #VALUE!
and brand including smoothening surface by sand papering etc.
including using of approved putty etc. on the surface, if necessary:
On timber or plastered surface :
With super gloss (hi-gloss) -
Two coats (with any shade except white)

46.01 On steel or other metal surface : 475.00 m2 86.00 #VALUE! #VALUE!


With super gloss (hi-gloss) -
Two coats (with any shade except white)

47 M.S.or W.I. Ornamental grill of approved design joints continuously 11.80 Qtl 8186.00 #VALUE! #VALUE!
welded with M.S, W.I. Flats and bars of windows, railing etc. fitted
and fixed with necessary screws and lugs in
ground floor.
Grill weighing above 16 Kg./sq.mtr and above

47.01 1st floor 16.20 Qtl 8267.86 #VALUE! #VALUE!

47.02 2nd floor 17.75 Qtl 8349.72 #VALUE! #VALUE!

9 of 28
47.03 3rd floor 17.75 Qtl 8431.58 #VALUE! #VALUE!

47.04 4th floor 4.50 Qtl 8513.44 #VALUE! #VALUE!

48 Supplying, fitting and fixing steel rolling shutter profile type with 18 60.00 m2 2688.00 #VALUE! #VALUE!
B.G . of approved type steel latche section 75mm wide, fitted with
coil wire spring to necessiate the fitting of required Nos. of C.I.
Pulleys on heavy type solid drawn seamless steel tube complete
with locking arrangements both inside and outside specially builtup
side guide channels including providing a hood for the steel rolling
shutter in the room, painting two coats of approved aluminium
paint over a coat of red lead primer complete.

49 Collapsible gate with 40mm x 40mm x 6mm Tee as top and 43.50 m2 3773.00 #VALUE! #VALUE!
bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm
apart in fully stretched position 20mm x 5mm M.S. flats as
collapsible bracings properly rivetted and washered including
38mm steel rollers including locking arrangements, fitted and fixed
in position with lugs set in cement concrete and including cutting
necessary holes, chasing etc. in walls, floors etc. and making good
damages complete.
In ground floor.

50 Holding down bolt with nut including 100 x 100 x 6 mm plate 96 each 99.00 #VALUE! #VALUE!
washer at bottom fitted complete and packing the hole with
cement concrete or cement grout as directed.
16 mm dia bolt
300 mm long

51 M.S. structural works with hollow sections (square or rectangular 5.00 M.T 69326.00 #VALUE! #VALUE!
shape) conforming to IS: 806-1957 & IS:1161-1958) connected to
one another with bracket, gusset, cleat as per design, drawing &
direction of Engineer-in-Charge complete including cutting to
requisite shape & size, fabrication including metal arc welding
conforming to IS: 816-1956 & IS: 9595 using electrodes of
approved make and brand conforming to IS:814- 1957, haulage,
hoisting and erection all complete.
The rate includes the cost of all M.S. Hollow section, all
consumables such as electrodes, gas and hire charges of all tools
and plants and labour reqired for execution and all incidental
chages (such as electricity, labour insurance) etc. complete.
Payment to be made on the basis of calculated weight of structural
memebrs of MS Holow Section as specified in relevent IS code in
finished work. Payment for gusset, bracket, cleat may be made by
adding the actual weight of such items with weight of finished
structural members. The rates are considered for a hight of
erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra
over the rate for each additional floor or 4m. beyond the initial 8 m.
or part thereof.
i) For roof truss works
a) Span up to 12 Mtr

52 Supplying, fitting and fixing glass reinforced polyester translucent 364.00 m2 1042.00 #VALUE! #VALUE!
fiber glass sheet to match with GCI Corrugation as per IS: 12866 -
1989 in roof fitted and fixed with 10 mm dia "J" or "L" hook, bolts
and nuts, limpet and bitumen washers and putty with 150mm end
lap and one corrugation minimum side lap complete.
2.0mm +/- 0.2 mm thick sheet.(3.25Kg/Sq.m)
i) Natural white or tinted blue colour

53 Supplying, fitting and fixing glass reinforced polyester translucent 76.00 m2 646.00 #VALUE! #VALUE!
ridging 450 mm long each way as per IS 2866 -1989 fitted and
fixed with bolts J hooked screws and bitumen washers complete
1.6mm +/- 0.2 mm thick sheet.
Natural white or tinted blue colour

54 Rendering the surface of walls and ceiling with white cement 17925.00 m2 122.00 #VALUE! #VALUE!
based wall putty of approved make and brand(1.5mm thick)

55 Acrylic Distemper to interior wall, ceiling with a coat of solvent 17925.00 m2 76.00 #VALUE! #VALUE!
based interior grade acrylic primer (as per manufacturer's
specification) including cleaning and smoothning of surface.
Two Coats

10 of 28
56 Supplying profiles of required section made of Aluminium Alloy 150.00 m 366.00 #VALUE! #VALUE!
Extrusions conforming to IS: 732-1983 and IS: 1285- 1975;
Annodized (with required film thickness and specified colour /
natural) matt finished conforming to IS: 1868-1983 for fabrication
of composit door, sliding & casement windows, partitions, formed
of basic sections of any ISI embossed / certified make and brand
as per direction of Engineer - In-Charge. (Payment will be made
on finished length of the work).
In 10-12 Micron thickness Annodizing film
Natural white
3- track sliding window
Bottom frame

56.01 ii) Top and side frame 390.00 m 317.00 #VALUE! #VALUE!

56.02 Shutter for all track sliding window. 281.00 m 138.00 #VALUE! #VALUE!
Bottom & Top member.

56.03 Style side member 561.00 m 140.00 #VALUE! #VALUE!

56.04 Interlock member 281.00 m 176.00 #VALUE! #VALUE!

56.05 Fixed partitions. 262.00 m 382.00 #VALUE! #VALUE!


(Unsupported length of vertical member upto 1.5 mtr. Height of
both ends of vertical member restrained but panels within 0.9
Sq.m)
Top , bottom & side member.

56.06 Intermediate member. 308.00 m 403.00 #VALUE! #VALUE!

56.07 Glazing clip. 1650.00 m 50.00 #VALUE! #VALUE!

56.08 Louvered window. 269.00 m 218.00 #VALUE! #VALUE!


Top, bottom and side member.

56.09 Louvered Section 51.00 m 780.00 #VALUE! #VALUE!

56.10 Cleat angle ( Non-annodized). 204.00 m 314.00 #VALUE! #VALUE!

56.11 Movable door shutter. 55.00 m 376.00 #VALUE! #VALUE!


Door frame. (Top & sides).
56.12 Shutter : 12.00 m 361.00 #VALUE! #VALUE!
Top rail.
56.13 Shutter : 12.00 m 534.00 #VALUE! #VALUE!
Bottom rail.
56.14 Shutter : 12.00 m 446.00 #VALUE! #VALUE!
Lock rail
56.15 Shutter : 51.00 m 395.00 #VALUE! #VALUE!
Door vertical.
56.16 Shutter : 190.00 m 50.00 #VALUE! #VALUE!
Glazing clip.

57 Labour charge for fabrication and installation of composite door, 180.00 m2 950.00 #VALUE! #VALUE!
window , partitions made from annodized extruded alloy aluminium
sections for the following units:-
Glazed aluminium sliding windows made of extruded and
annodized alloy aluminium sectios, fabrications, including cutting
to proper shape and size, drilling and aligning of window shutter
frame fitted with in built locking arrangements, sliding rollers and
other necessary fittings, fixture, adhesives and joineries along with
extruded neoprine or EPDM gasketing in between window frame
and masonry work (walls, column, beam.lintels etc.) as well as
between glass and shutter frame for fixing glass and Polysulphide
sealant and in between shutter and window frame where
necessary including cutting to requisite size and fixing glass as per
drawing, specification and direction of EIC. The rate includes the
hire charge of all tools and plants, including all incidental charges,
adhesive, joineries such as screw, cleat angle etc. but excluding
the cost of extruded aluminium sections, glass, neoprene / EPDM
gasket, locking arrangement and rollers.
ii ) 3 /4 track sliding window

57.01 v ) Louvered window 54.00 m2 737.00 #VALUE! #VALUE!

11 of 28
57.02 Partly glazed and partly panelled partition or fixed glazing made of 170.00 m2 736.00 #VALUE! #VALUE!
extruded and anodised alloy aluminium sections, fabrications after
cutting to proper shape and size, drilling and aligning fitted with
inbuilt locking arrangement cutting the glass / board
(prelaminated / particle /block) to requisite shape and size
moulding the edges fitted and fixed glazing clips and dry set
neoprine /EPDM gasket, along with all other necessary
arrangements for fixing the partition to walls, floors, beams,
columns polysulphide sealant for water proofing if necessary
complete in all respect as per drawing and specifications and
direction of the Engineer in charge.
The rate includes the hire charge of all tools and plants, adhesive,
joineries such as screw, fastener but excluding the cost of
extruded aluminium sections, EPDM gasket, glass, board, glazing
clips, locking arrangement, etc.
For partitions using section of size:
63.50 mm x 38.10 mm

57.03 Partly glazed partly panelled or fully glazed single leaf alunminium 28.05 m2 1294.00 #VALUE! #VALUE!
swing door made of extruded and annodized alloy aluminium
sections, fabrication including cutting to proper shape and size,
drilling and aligning, fitted with heavy duty hydraulic action floor
sping placed in the floor with mending damages,with top pin
assembly of approve make and brand, fitted with in built locking
arrangement, flush bolt, glazing clips and all other necessary
fittings, fixtures, adhesives and joineries, cutting glass of approved
make to requisite shape and size fitting with dry set neoprene or
EPDM gasketing, cutting to requisite shape and size panel board
(prelaminated particle block) fixing them with glazing clips as per
drawing, specification and direction of Engineer in charge.

58 Supplying, fitting fixing Godrej type hydraulic (oil check) floor door 12 each 4212.00 #VALUE! #VALUE!
spring, heavy duty double action with brass shoe, brass top centre
aluminium top cover etc. complete set as per direction of
Engineer-in-charge

59 Supplying maruti lock (100mm) 198 each 56.00 #VALUE! #VALUE!

60 Supplying PVC rollers for sliding windows as per direction of 600 each 15.00 #VALUE! #VALUE!
Engineer in charge
61 Supplying EPDM gusket of approved make and brand as per 535.00 m 15.00 #VALUE! #VALUE!
direction of Engineer in charge.
For sliding windows
'U' shaped EPDM gasket for frames.

62 Supplying bubble free float glass of approved make and brand 365.00 m2 558.00 #VALUE! #VALUE!
conforming to IS: 2835-1987.
4mm thick coloured / tinted / smoke glass.

63 Supplying 4 lever mortice lock or any approved make and brand 10 each 451.00 #VALUE! #VALUE!
as per direction of the Engineer- in -Charge.
150 mm.

64 Supplying Heavy Duty Aluminium Handle (EBCO Type) (Natural 16 each 114.00 #VALUE! #VALUE!
White)
65 Godrej Hydraulic door closer fitted and fixed complete. 82 each 2395.00 #VALUE! #VALUE!
Heavy type

66 Supplying, fitting and fixing boiling water proof ply conforming to 181.00 m2 2838.00 #VALUE! #VALUE!
IS: 710-1977 bonded with phenol formaldehyde synthetic resin
conforming to IS: 848-1974 of approved make and brand fitted and
fixed as per design as per approval and direction of Engineer-in-
Charge. [excluding the cost of supporting frame work and teak
wood batten/Lipping]
19mm

66.01 12mm 182.00 m2 2004.00 #VALUE! #VALUE!

67 Wall panelling / partition with Melamine faced 3 layered flat 55.88 m2 1007.00 #VALUE! #VALUE!
pressed wood particle board of approved make and brand as per
direction of Engineer - in - Charge of requisite grade
bonded with phenol formaldehyde synthetic resin conforming to IS:
848 - 1974 (excluding the cost of supporting frame work and teak
wood battens / lipping)
Prelaminated particle board conforming to IS: 3087 - 1985 and IS
12823 - 1990
Both side decorative laminate
Interior Grade
9mm thick

12 of 28
68 Supplying fitting, fixing decorative lamination conforming to IS: 182.00 m2 924.00 #VALUE! #VALUE!
2046 : 1995 as per approved make, brand, finish and thickness
with fitting, fixing the same on Particle/MDF / Ply
Boards with recommended / approved adhesive with proper
clippingds with recommended / approved adhesive with proper
clipping the sides for better attachment as per direction of
Engineer-in-charge.The rate includes the cost of labour,
adhesive and all incidental charges thereof.
Glossy/Matt/Suede excluding surface texture or metallic lustre.
Thickness of laminate 1.5mm

69 Dressed wood work in post , plate , battens . etc. fitted & fixed 0.600 m3 87211.00 #VALUE! #VALUE!
complete (excluding the cost of bolts only, but including the cost of
nails, screws etc.)
(The quantum should be corrected upto three decimals)
Sal : Local

70 Removal of rubbish,earth etc. from the working site and disposal 5000.00 m3 168.00 #VALUE! #VALUE!
of the same beyond the compound, in conformity with the
Municipal / Corporation Rules for such disposal, loading into truck
and cleaning the site in all respect as per direction of Engineer in
charge

71 M.F. suspended ceiling made with 12.5 mm thick Gypsum plaster 315.00 m2 1257.00 #VALUE! #VALUE!
board including G.I. perimeter channel of 0.55 mm flush (having
two flanges 20 mm and 30 mm respectively and web 27 mm )
along with perimeter of ceiling with G.I. intermediate channel of 0.9
mm thick size 45 mmx15mm placed at 750 mm c/c with G.I. ceiling
angle of size 25 mmx10mmx0.55 mm thick fixed to the ceiling with
G.I. Cleat and steel expansion fastener ceiling section 0.55 mm
thick of size 51.50 mmx26mm fixed to the intermediate channels
with the help of connecting clip and in the direction of
perpendicular to the intermediate channel of 300 mm c/c 12.5mm
thick Gypsum plastered board are to be fixed under ceiling section
as above by machine screws. The boards are to be joined and
finished with jointing compound, paper tape and application of top
coat etc. as per the direction of Engineer-in-charge. (The rate
includes of cost of all materials including taxes, cost of
accessories, fittings and fixtures, scaffolding and labour charges
etc. complete)

72 Supplying, fitting and fixing Stainless Steel railing consist of 38mm 188.00 m 7754.00 #VALUE! #VALUE!
dia and 900mm height vertical balustrade at every two alternative
steps, 50mm dia top rail, 3 (three ) nos 19mm dia horizontal
Strainless steel pipe and base/cover plate with Strainless Steel
GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat
finish, complete as per direction of the Engineer-incharge.
Weight of Strainless Steel railing per metre 6.5 Kg (approx)

73 Surface Dressing of the ground in any kind of soil including 2640.00 m2 11.00 #VALUE! #VALUE!
removing vegetation inequalities not exceeding 15 cm depth and
disposal of the rubbish within a lead upto 75 m as directed.

74 S & P WORK 225.00 m3 292.00 #VALUE! #VALUE!


Cleaning rubbish, sludge, weeds scum, liquid earth, mud
etc.etc.from road side masonary drain/ hume pipe drain/ culvert
etc. by mathor labour after removing concrete.Slab/manhole cover
etc.without damaging the same and refixing the same properly
after cleaning as necessary and removing the sludge etc.etc.by
using iron pans,buckets including all labour, tools & plants
including removing the spoils in dry condition and disposing the
same by truck beyond the road side in conformity with
municipal/corporation rules for such disposal including loading into
truck and cleaning the road side in all respects as per direction of
the Engineerin- Charge.
(Payment will be made on the basis of actual stack measurment of
spoils in dry condition at roadside)

75 Supplying, fitting and fixing C.P. Wall Flange 116 each 81.00 #VALUE! #VALUE!

76 Supplying, fitting and fixing C.P. Extension Pipe 116 each 133.00 #VALUE! #VALUE!

77 Supplying, fitting and fixing gunmetal wheel valve of approved 16 each 2014.00 #VALUE! #VALUE!
brand and make tested to 21 kg per sq. cm. (for water lines only).
40 mm dia

77.01 20 mm dia 22 each 738.00 #VALUE! #VALUE!

13 of 28
78 Supplying P.V.C. water storage tank of approved quality with 15 each 12437.00 #VALUE! #VALUE!
closed top with lid (Black) - Multilayer
2000 litre capacity

79 Labour for hoisting plastic water storage tank. 15 each 374.00 #VALUE! #VALUE!
Above 1500 litre upto 5000 litre capacity.
Upto 4th story from G.L.

80 Labour for punching hole in plastic water storage tank upto 50 mm 60 each 19.00 #VALUE! #VALUE!
dia.

81 Constructing Inspection pit of inside measurement 600mm X 18 each 7014.00 #VALUE! #VALUE!
600mm Xupto 600mm (depth) with 250 mm thick 1st. class brick
work in cement mortar (1:4) on all sides, bottom of the pit
consisting of 100 mm thick cement concrete (1:3:6) with stone
chips over a layer of jhama brick flat soling,15 mm thick (1:4)
cement plaster to inside walls and out-side walls upto G.L. and 20
mm.thick (1:4) plaster to bottom of the pit, providing necessary
invert with cement concrete (1:3:6) with stone chips as per
direction, neat cement finishing to entire internal surfaces, top of
the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone
chips and necessary reinforcements upto 1% and shuttering
including 6mm thick cement plaster (1:4) in all external surfaces of
the slab and
one 560 mm dia. R.C.C. manhole cover of approved make
supplied, fitted and fixed in the slab with necessary fittings,
necessary earthwork in excavation in all sorts of soil, filling sides
of the pit with earth and removing spoils after work complete in all
respect with all costs of labour and materials
ii) With Bazree (N.B Varity)

82 Construction of circular soak well 2.5 metre deep in all types of 4 each 16704.00 #VALUE! #VALUE!
sandy soils with dry brick work upto 1.6 metre from the bottom
having 150 mm intermediate cement brick work (1:4) band all
round and cement brick work (1:4) upto 0.90 metre from top with
20mm thick cement plastering (1:4) to inside face upto the depth
of cement brick work, 15mm thick cement plaster (1:4) on outer
face from top of the well upto G.L. and 6mm thick cement plaster
(1:4) on top of the R.C.C. cover slab including filling bottom 1.00
metre of inside of the well with brick metal (50 mm to 63 mm size)
including R.C.C. cover slab of 100 mm thick with cement conc
(1:1.5:3) with stone chips with necessary reinforcement and
shuttering including one 560 mm dia. R.C.C. manhole cover
(heavy type)of approved make supplied, fitted and fixed in the
cover slab with necessary fittings, making nacessary
arrangements for pipe connections, excavation of well including
shoring, dewatering and removing the exess earth from the
premises as per direction complete in all respect with all costs of
labour and materials.
With 250 mm thick dry brick work and 250 mm thick cement brick
work (1:6) and 1.00m inside dia.

83 Construction of septic tank of different capacities as per approved 4 each 87999.00 #VALUE! #VALUE!
drawing with 1st class brick work in cement mortar (1:4) including
two 560 mm dia. R.C.C. manhole cover(heavy type)of approved
make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3)
top slab with necessary fittings, 20mm thick cement plaster (4 : 1)
with neat cement finish to the internal surfaces and 15 mm thick
cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor
finished with 25 mm thick grey artificial stone over 100 mm thick
R.C.C(1:1.5:3) bottom slab including supplying, fitting and fixing all
necessry specials, fittings, S.W. tees, C.I. foot rest etc. including
excavation earth in all sorts of soil, shoring, bailing out and
pumping out water as necessary, ramming, dressing the bed and
fefilling the sides of the tanks with earth, removing spoils, filling up
the chamber with clear water, removing foreign materials from the
chamber and including constructing attached inspection pit as per
approved drawing and connecting all necessary pipes, joints etc.
with internal plaster work and artificial stone flooring is to be done
with admixture of water proofing compound @ 0.5% by weight of
cement with all costs of labour and materials.
For 50 users
With Bazree(N.B Varity)

84 Supplying, fitting and fixing bib cock or stop cock. 89 each 1105.00 #VALUE! #VALUE!
Chromium plated Bib Cock with wall flange (Equivalent to Code
No. 5047 & Model - Florentine of Jaquar or similar brand).

14 of 28
85 Supplying, fitting and fixing bib cock or stop cock. 58 each 1224.00 #VALUE! #VALUE!
Chromium plated concealed Stop Cock heavy duty (Equivalent to
Code No. 5083 & Model - Florentine of Jaquar or similar brand).

86 Supplying, fitting and fixing pillar cock of approved make. 42 each 1105.00 #VALUE! #VALUE!
CP Pillar Cock - 15 mm. (Code No.
5011 & Model - FLORENTINE of JAQUAR or equivalent).

87 Supplying, fitting and fixing G.I. pipes of TATA make with all 360.00 m 265.00 #VALUE! #VALUE!
necessary accessories, specials viz. socket, bend, tee, union,
cross, elbo, nipple, longscrew, reducing socket, reducing tee, short
piece etc. fitted with holder bats clamps, including cutting pipes,
making threads, fitting, fixing etc. complete in all respect including
cost of all necessary fittings as required,jointing materials and two
coats of painting with approved paint in any position above
ground. (Payment will be made on the centre line measurements
of total pipe line including all specials. No separate payment will be
made for accesories, specials. Payment for painting will be made
seperately)
For Concealed Work
15 mm dia. medium quality

87.01 25 mm dia. medium quality 245.00 m 412.00 #VALUE! #VALUE!

87.02 For Exposed Work 240.80 m 476.00 #VALUE! #VALUE!


40 mm dia. medium quality

87.03 50 mm dia. medium quality 194.20 m 624.00 #VALUE! #VALUE!

88 Supply of UPVC pipes (B Type) & fittings conforming to IS-13592- 300.00 m 348.00 #VALUE! #VALUE!
1992
Single Socketed 3 Meter Length
110 mm

88.01 75 mm 150.00 m 234.00 #VALUE! #VALUE!

88.02 Fittings 30 each 149.00 #VALUE! #VALUE!


Door Bend (LH) & (RH)
75 mm

88.03 110 mm 30 each 339.00 #VALUE! #VALUE!

88.04 Door Tee(LH) & (RH) 38 each 212.00 #VALUE! #VALUE!


75 mm
88.05 110 mm 30 each 372.00 #VALUE! #VALUE!

88.06 Bend 45º 38 each 64.00 #VALUE! #VALUE!


75 mm
88.07 110 mm 38 each 106.00 #VALUE! #VALUE!

88.08 Plain Y 16 each 246.00 #VALUE! #VALUE!


110 mm

88.09 Pipe Clip 150 each 25.00 #VALUE! #VALUE!


110 mm
89 Labour for fitting and fixing U.P.V.C. pipes for above ground work 150.00 m 45.00 #VALUE! #VALUE!
including cost of jointing materials etc. fitting and fixing all
necessary specials, cutting pipes, cutting holes in walls or R.C.
floor where necessary and mending good all damages excluding
the cost of masonry or concrete work, if necessary, but including
the cost and fitting and fixing holder bat clamps (any floor) or for
underground work including cutting trenches upto 1.5 metre and
refilling the same complete as per direction of the Engineer-in-
charge. (Payment will be made on centre line measurement of the
total pipeline including specials.
(A)Above ground
(i) 75 mm dia

89.01 (ii) 110 mm dia. 150.00 m 57.00 #VALUE! #VALUE!

89.02 (B)Under ground 150.00 m 85.00 #VALUE! #VALUE!


(ii) 110 mm dia
90 Supplying,fitting and fixing approved brand 32 mm dia.P.V.C. 54 each 89.00 #VALUE! #VALUE!
waste pipe, with PVC coupling at one end fitted with necessary
clamps
900 mm long

15 of 28
91 Supplying,fitting and fixing approved brand P.V.C. CONNECTOR 74 each 126.00 #VALUE! #VALUE!
white flexible, with both ends coupling with heavy brass C.P. nut,
15 mm dia.
600 mm long

92 Supplying, fitting and fixing white vitreous china best quality 30 each 2504.00 #VALUE! #VALUE!
approved make wash basin with C.I. brackets on 75 mm X 75 mm
wooden blocks, C.P. waste fittings of 32 mm dia., one approved
quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber
plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P.
nut 32 mm dia., 900 mm long approved quality P.V.C. connection
pipe with heavy brass C.P. nut including mending good all
damages and painting the brackets with two coats of approved
paint.
550 mm X 400 mm size

93 Supplying, fitting and fixing pedestal of approved make for wash 30 each 1911.00 #VALUE! #VALUE!
basin (white)
94 Supplying, fitting and fixing Orissa pattern water closet in white 2 each 2026.00 #VALUE! #VALUE!
glazed vitreous chinaware of approved make in position complete
excluding 'P' or 'S' trap (excluding cost of concrete for fixing).
(i) 580 mm X 440 mm

95 Suppling, fitting and fixing Wall mounted water closet of white 1 each 5057.00 #VALUE! #VALUE!
glazed vitreous chinaware of approved make and brand in position
complete with necessary nut and boalts (Equivalent to Code No.
20061 or 92065 & Model Studio or Rubbic of Hindware or
equivalent.)

96 Supplying, fitting and fixing E.W.C. in white glazed vitreous 25 each 1895.00 #VALUE! #VALUE!
chinaware of approved make complete in position with necessary
bolts, nuts etc.
With 'S' trap

97 Supplying, fitting and fixing towel rail with two brackets. 29 each 554.00 #VALUE! #VALUE!
(a) C.P. over brass
(ii) 25 mm dia. and 600 mm long

98 Supplying, fitting and fixing glass shelf with aluminium guard rails. 29 each 432.00 #VALUE! #VALUE!
(a) Ordinary type with 5.5 mm sheet glass
(i) 450 mm X 125 mm

99 Supplying, fitting and fixing 18 mm thick marble partition slab with 28 each 1710.00 #VALUE! #VALUE!
chawk doongri marbel square cut, both sides polished with two
front corners rounded and edges polished.

100 Supplying, fitting and fixing urinal flush pipe fittings of approved 16 each 1179.00 #VALUE! #VALUE!
brand.
C.P. urinal flush pipe fittings range of two

101 Supplying, fitting and fixing liquid soap container. 16 each 506.00 #VALUE! #VALUE!
Cromium plated.
102 Supplying, fitting and fixing soap holder. 16 each 171.00 #VALUE! #VALUE!
PTMT(Prayag or equivalent)
103 Supplying, fitting and fixing best quality Indian make mirror 5.5 mm 16 each 792.00 #VALUE! #VALUE!
thick with silvering as per I.S.I. specifications supported on fibre
glass frame of any colour, frame size 550 mm X 400 mm

104 Supplying, fitting and fixing 10 litre P.V.C. low-down cistern 28 each 1181.00 #VALUE! #VALUE!
conforming to I.S. specification with P.V.C. fittings complete,C.I.
brackets including two coats of painting to bracket etc.

105 PART - B 504.16 %m3 12047.00 #VALUE! #VALUE!


Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or
sandstone) including removing, spreading or stacking the spoils
within a lead of 75 m. as directed. The item includes necessary
trimming the sides of trenches, levelling, dressing and ramming
the bottom, bailing out water as required complete.Depth of
excavation not exceeding 1,500 mm.

106 Filling in foundation or plinth by silver sand in layers not exceeding 72.01 %m3 54495.00 #VALUE! #VALUE!
150 mm as directed and consolidating the same by thorough
saturation with water, ramming complete including the cost of
supply of sand. (payment to be made on
measurement of finished quantity)

107 Single Brick Flat Soling of picked jhama bricks including ramming 1380.00 m2 340.00 #VALUE! #VALUE!
and dressing bed to proper level and filling joints with local sand.

108 Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 174.50 m3 4644.00 #VALUE! #VALUE!
mm nominal size) excluding shuttering and reinforcement,if any, in
ground floor as per relevant IS codes.
River bazree

16 of 28
109 Cement concrete with 30 mm down graded shingles excluding 16.80 m3 3835.00 #VALUE! #VALUE!
shuttering.
N.B. Variety
In ground floor
1:3:6 proportion

110 Supplying & laying interlocking designer paver block of any shade 840.00 m2 1427.00 #VALUE! #VALUE!
and of approved quality as per IS: 1237-1980 laid in pattern as
directed in pavement, footpath, driveway, etc including necessary
underlay complete in all respect with all labour and material.
[Border concrete if necessary to be paid separately].
60 mm thick block (over 150 mm medium sand bed including cost
of sand but excluding cost of earthwork in excavation or
dismantling of existing hard surface if necessary)
Coloured Decorative

111 Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips 62.10 m3 6949.78 #VALUE! #VALUE!
(20 mm nominal size) excluding shuttering and reinforcement if
any, in ground floor as per relevant IS codes.
(i) Pakur Variety

112 Hire and labour charges for shuttering with centering and 297.00 m2 221.00 #VALUE! #VALUE!
necessary staging upto 4 m using approved stout props and thick
hard wood planks of approved thickness with required bracing for
concrete slabs, beams and columns, lintels urved or straight
including fitting, fixing and striking out after completion of works
(upto roof of ground floor)
25 mm to 30 mm shuttering without staging in foundation

112.01 25 mm to 30 mm thick wooden shuttering as per decision & 315.00 m2 351.00 #VALUE! #VALUE!
direction of Engineer-In-Charge.

113 Reinforcement for reinforced concrete work in all sorts of 7.310 M.T 58708.91 #VALUE! #VALUE!
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in
proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.
For works in foundation, basement and upto roof of ground
floor/upto 4 m
(i) Tor steel/Mild Steel

114 Brick work with 1st class bricks in cement mortar (1:6) 23.45 m3 5233.00 #VALUE! #VALUE!
(a) In foundation and plinth

115 125 mm. thick brick work with 1st class bricks in cement 188.00 m2 724.00 #VALUE! #VALUE!
mortar (1:4) in ground floor.

116 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar 374.50 m2 197.00 #VALUE! #VALUE!
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
With 1:4 cement mortar
20 mm thick plaster

116.01 With 1:4 cement mortar 390.000 m2 169.00 #VALUE! #VALUE!


15 mm thick plaster

117 Protective and Decorative Acrylic exterior emulsion paint of 855.00 m2 108.00 #VALUE! #VALUE!
approved quality, as per manufacturer's specification and as per
direction of EIC to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental
charges but excluding the cost of primer.
In Ground floor (Two Coat)
Super Protective 100% Acrylic Emulsion.

118 Applying Exterior grade Acrylic primer of approved quality and 855.00 %m2 4899.00 #VALUE! #VALUE!
brand on plastered or cencrete surface old or new surface to
receive decorative textured(matt finish) or smooth finish acrylic
exterior emulsion paint including scraping and preparing the
surface throughly, complete as per manufacturer's specification
and as per direction of the EIC.
In Ground Floor:
Two Coat

17 of 28
119 M.S. structural works in columns, beams etc. with simple rolled structural 1.150 M.T 69617.00 #VALUE! #VALUE!
members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 &
SP (6)- 1964 connected to one another with bracket, gussets, cleats as per
design, direction of Engineer-incharge complete including cutting to requisite
shape and length, fabrication with necessary bolting, metal arc welding
conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and
brand conforming to IS:814- 1957, haulage, hoisting and erection all complete.
The rate includes the cost of rolled steel section, consumables such as
electrodes, gas and hire charge of all tools and plants and labour required for
the work including all incidental chages such as electricity charges, labour
insurance charges etc.
Payment to be made on the basis of calculated weight of structural members
only in finished work as per IS specified weight. Payment for gusset, bracket,
cleat, rivets, bolts and nuts may be make by adding the actual weight of such
items with the weight of finished structural members or 7% of weight for finished
structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for
finished structal members weighing less than 22.5 Kg. / m. may be increased
allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being
made for these items, as per direction of Engineer In Charge. The rates are
considered for a height of erection 8m. / 2nd floor level from the ground. Add
1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or
part thereof.
For Structural Works in Roof Trusses etc. using joists, channels and angles of
specified section weighing less than 22.5 kg/ m

120 Supplying fitting and fixing 600 mm (+/- 30 mm) diametre R.B.T 210.00 m 481.00 #VALUE! #VALUE!
(Reinforced Barbed Tape) Concertina fencing on wall top using
concertina coils stretched to approx.6 meters length at site clipped
with two nos. of horizontal R.B.T strands which will be tensioned
and fixed with the vertical M.S angle iron posts by means of
security fasteners (such as 'C' clips, R.B.T clips etc.)

121 Supplying, fitting galvanised 2 ply 12 gauge / 2 points line of 210.00 %m 2508.00 #VALUE! #VALUE!
barbed wire in fencing (holes already made in the body of the
post) or fixed by staples tightening and fixing the wires in taut
condition with straining bolts including the cost of cutting and of
lapping joints in the wire as necessary but excluding the cost of
galvanised staples,straining bolt and binding wire as necessary 2
ply 12 gauge/ 2 points.
(Payment to be made on the length of individual lines of wire.)

122 PART - C 50.00 m 1078.00 #VALUE! #VALUE!


Labour for boring through any type of soil for sinking tube well of
required dia. with top enlargement by rig boring system (either by
reserve circulation or by direct rotary method) including hire
charges and labour for rig machine, tools and plants, staging,
force pumping set and making arrangement for water required for
boring etc. complete and lowering of pipes, strainers, blind pipes
etc. complete.
For depth upto 250 metre for 150 mm dia. Tube well with top
enlargement of 250 mm dia.(upto 50 metre).
First 50 metre

122.01 Next 50 metre 50.00 m 1060.00 #VALUE! #VALUE!

122.02 Next 50 metre 50.00 m 1261.00 #VALUE! #VALUE!

123 Sypply of E.R.W.M.S.(Electrical Resistant Welded M.S.) black pipe 148.00 m 1814.00 #VALUE! #VALUE!
of of TATA make(heavy quality) as per standard specification, 5
mm thick.
150 mm dia. (internal)

123.01 100 mm dia. (internal) 2.00 m 1246.00 #VALUE! #VALUE!

124 Labour for jointing and lowering G.I. or E.R.W. M.S. pipes 150.00 m 79.00 #VALUE! #VALUE!
including strainer within the tube well bore vertically with
necessary sockets, special fittings and welding as required
including cost of all jointing materials, hire charges of tools and
plants, cutting pipes to required sizes, making threads, welding
pieces together etc. as necessary as per direction of the Engineer-
in-charge.
Above 100 mm dia. and upto 200 mm dia. pipe

18 of 28
125 Labour charges for making slots in E.R.W.M.S. pipe as per 50.00 m 489.00 #VALUE! #VALUE!
direction of the Engineer-in-charge for the purpose of using the
slotted pipe as strainer including cost of labour and hire charges of
tools and plants,all complete.
150 mm dia. pipe

126 Supplying, fitting and fixing G.I. cap at top 1 each 598.00 #VALUE! #VALUE!
150 mm

127 Supplying, fitting and fixing heavy type bell mouth reducing socket. 1 each 732.00 #VALUE! #VALUE!
100 mm X 150 mm

128 Washing and developing tube well with air compressor pump and 1 each 7613.00 #VALUE! #VALUE!
engine for 8 (eight) hours continuous pumping per day with
necessary arrangements for testing the yield in gallons per hour
with 'V' notch including hire and labour charges for all tools and
plants and scaffolding as required.

129 Collecting sample of water for bacteriological and chemical test 2 each 1243.00 #VALUE! #VALUE!
from any depth at any time during execution of work including hire
and labour charges for tools and plants and sterilising the
equipments, paying all charges and fees, testing etc. complete in
all respect as per direction.

130 Supply of G.I. pipes of TATA make including necessary sockets. 140.00 m 347.00 #VALUE! #VALUE!
40 mm dia.
Medium quality

131 Packing the annular space between the outside of the tube well 5.00 m3 2050.00 #VALUE! #VALUE!
pipes & strainers and the bore with pea size washed gravel of
approved quality having size from 2 mm to 5 mm or the size
approved by the Engineer-incharge including cost of all materials
labour and equipment complete.

132 PART - D 100.00 m2 340.00 #VALUE! #VALUE!


Single Brick Flat Soling of picked jhama bricks including ramming
and dressing bed to proper level and filling joints with local sand.

133 Earth work in excavation of foundation trenches or drains, in all 580.00 %m3 12047.00 #VALUE! #VALUE!
sorts of soil (including mixed soil but excluding laterite or
sandstone) including removing, spreading or stacking the spoils
within a lead of 75 m. as directed. The item includes necessary
trimming the sides of trenches, levelling, dressing and ramming
the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1,500 mm.

134 Cement concrete with 30 mm down graded shingles excluding 15.00 m3 3835.00 #VALUE! #VALUE!
shuttering.
N.B. Variety
In ground floor
1:3:6 proportion

135 Batch Mixed concrete of M 25 Grade with well Graded stone chips 108.00 m3 7530.15 #VALUE! #VALUE!
of 20 mm nominal size containing designed quantity of cement per
Cu. M of Wet concrete produced in computerised batching plant
under controlled condition using approved super plasticizer
designing concrete mix following I.S 10262 and I.S. 456
transporting the mix with agitation in transit mixer to work site
depositing the mix on a platform erected for the purpose at
required level of concreting and then placing the mix in its final
location of form work compacting and curing the same complete
as per specification and direction of the Engineer-in charge
including hire charges of computerised batching plant, transit
mixer with all accessories vibrators etc. inclusive of all other
incidental charges in this connection complete but excluding cost
of hire charge of platform and its supporting staging which would
be paid through separate item. Consumption of cement will not be
less than 300 Kg of cement per cubic meter of controlled concrete
but actual consumption will be determined on the basis of
preliminary test and job mix foumula. [Cement to be supplied
agency]
[with Batching Plant & transit mixer]
In Ground Floor& Foundation. [Pakur Variety].
With approved concrete pump.

136 Filling in foundation or plinth by silver sand in layers not exceeding 288.00 %m3 54495.00 #VALUE! #VALUE!
150 mm as directed and consolidating the same by thorough
saturation with water, ramming complete including the cost of
supply of sand. (payment to be made on
measurement of finished quantity)

19 of 28
137 Polymer concrete made with water resistant bonding agent of 108.00 m3 5197.00 #VALUE! #VALUE!
synthetic rubber emulsion as per manufacturer's specification
excluding the cost of cement concrete (2.75 Kg / bag of cement)
Note : Payment on volume of (1 : 1½ : 3) Concrete.

138 Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint 335.00 m2 299.00 #VALUE! #VALUE!
having adhesive & waterproofing properties by mixing in proportion
(1 liquid: 4 cementitious material) or as per manufacturer's
specification for water proofing layer in water tank etc. (No
Departmental Cement is required)

139 Reinforcement for reinforced concrete work in all sorts of 12.400 M.T 58708.91 #VALUE! #VALUE!
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in
proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground
floor/upto 4 m
(i) Tor steel/Mild Steel

140 Hire and labour charges for shuttering with centering and 362.00 m2 474.00 #VALUE! #VALUE!
necessary staging upto 4 m using approved stout props and thick
hard wood planks of approved thickness with required bracing for
concrete slabs, beams and columns, lintels curved or straight
including fitting, fixing and striking out after completion of works
(upto roof of ground floor)
Steel shuttering form, made out of 2mm thk (14 SWG) M.S Sheet
welded with peripheral angle - Stiffner(40x40x5) frame work and
placed over suitable Telescopic/ Adjustable Span (2.45-4.16m)
weighing > 39 kg (SO+SI) & supported by approved adjustible
telesscopic prop (2.50-4.25m) weighing > 18.5 kg .

141 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar 351.00 m2 223.00 #VALUE! #VALUE!
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
With 1:3 cement mortar
20 mm thick plaster

142 Neat cement punning about 1.5mm thick in wall,dado,window 351.00 m2 39.00 #VALUE! #VALUE!
sill,floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.

143 PART - E 1680.00 %m3 12047.00 #VALUE! #VALUE!


Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or
sandstone) including removing, spreading or stacking the spoils
within a lead of 75 m. as directed. The item includes necessary
trimming the sides of trenches, levelling, dressing and ramming
the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1,500 mm.

144 Earth work in filling in foundation trenches or plinth with good 340.00 %m3 7831.00 #VALUE! #VALUE!
earth, in layers not exceeding 150 mm. including watering and
ramming etc. layer by layer complete. (Payment to be made on the
basis of measurement of finished quantity of work)
With earth obtained from excavation of foundation.

145 Single Brick Flat Soling of picked jhama bricks including ramming 1846.00 m2 340.00 #VALUE! #VALUE!
and dressing bed to proper level and filling joints with local sand.

146 Cement concrete with 30 mm down graded shingles excluding 60.72 m3 3835.00 #VALUE! #VALUE!
shuttering.
N.B. Variety
In ground floor
1:3:6 proportion

147 Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 772.00 m3 4644.00 #VALUE! #VALUE!
mm nominal size) excluding shuttering and reinforcement,if any, in
ground floor as per relevant IS codes.
River bazree

148 Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips 260.00 m3 6949.78 #VALUE! #VALUE!
(20 mm nominal size) excluding shuttering and reinforcement if
any, in ground floor as per relevant IS codes.
Pakur Variety

20 of 28
149 Cleaning rubbish, sludge, weeds scum, liquid earth, mud 640.00 m3 292.00 #VALUE! #VALUE!
etc.etc.from road side masonary drain/ hume pipe drain/ culvert
etc. by mathor labour after removing concrete.Slab/manhole cover
etc.without damaging the same and refixing the same properly
after cleaning as necessary and removing the sludge etc.etc.by
using iron pans,buckets including all labour, tools & plants
including removing the spoils in dry condition and disposing the
same by truck beyond the road side in conformity with
municipal/corporation rules for such disposal including loading into
truck and cleaning the road side in all respects as per direction of
the Engineerin - Charge.

150 Dismantling all types of plain cement concrete works, stacking 127.50 m3 949.00 #VALUE! #VALUE!
serviceable materials at site and removing rubbish as directed
within a lead of 75 m.
In ground floor including roof.
upto 150 mm. thick

151 Hire and labour charges for shuttering with centering and 4410.00 m2 221.00 #VALUE! #VALUE!
necessary staging upto 4 m using approved stout props and thick
hard wood planks of approved thickness with required bracing for
concrete slabs, beams and columns, lintels curved or straight
including fitting, fixing and striking out after completion of works
(upto roof of ground floor)
25 mm to 30 mm shuttering without staging in foundation

151.01 25 mm to 30 mm thick wooden shuttering as per decision & 1020.00 m2 351.00 #VALUE! #VALUE!
direction of Engineer-In-Charge.

152 Reinforcement for reinforced concrete work in all sorts of 30.615 M.T 58708.91 #VALUE! #VALUE!
structures including distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if necessary), cutting to
requisite length, hooking and bending to correct shape, placing in
proper position and binding with 16 gauge black annealed wire at
every intersection, complete as per drawing and direction.
For works in foundation, basement and upto roof of ground
floor/upto 4 m
Tor steel/Mild Steel

153 Brick work with 1st class bricks in cement mortar (1:6) 515.00 m3 5233.00 #VALUE! #VALUE!
In foundation and plinth

154 125 mm. thick brick work with 1st class bricks in cement mortar 717.75 m2 724.00 #VALUE! #VALUE!
(1:4) in ground floor.

155 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar 4365.00 m2 197.00 #VALUE! #VALUE!
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
With 1:4 cement mortar
20 mm thick plaster

155.01 With 1:4 cement mortar 1564.00 m2 169.00 #VALUE! #VALUE!


15 mm thick plaster

156 Neat cement punning about 1.5mm thick in wall,dado,window 3565.00 m2 39.00 #VALUE! #VALUE!
sill,floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.

157 Protective and Decorative Acrylic exterior emulsion paint of 3160.00 m2 108.00 #VALUE! #VALUE!
approved quality, as per manufacturer's specification and as per
direction of EIC to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental
charges but excluding the cost of primer.
In Ground floor (Two Coat)
Super Protective 100% Acrylic Emulsion.

158 Applying Exterior grade Acrylic primer of approved quality and 3160.00 m2 48.99 #VALUE! #VALUE!
brand on plastered or cencrete surface old or new surface to
receive decorative textured(matt finish) or smooth finish acrylic
exterior emulsion paint including scraping and preparing the
surface throughly, complete as per manufacturer's specification
and as per direction of the EIC.
In Ground Floor:
Two Coats

21 of 28
159 M.S. structural works in columns, beams etc. with simple rolled structural 4.400 M.T 69617.00 #VALUE! #VALUE!
members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 &
SP (6)- 1964 connected to one another with bracket, gussets, cleats as per
design, direction of Engineer-incharge complete including cutting to requisite
shape and length, fabrication with necessary bolting, metal arc welding
conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and
brand conforming to IS:814- 1957, haulage, hoisting and erection all complete.
The rate includes the cost of rolled steel section, consumables such as
electrodes, gas and hire charge of all tools and plants and labour required for
the work including all incidental chages such as electricity charges, labour
insurance charges etc.
Payment to be made on the basis of calculated weight of structural members
only in finished work as per IS specified weight. Payment for gusset, bracket,
cleat, rivets, bolts and nuts may be make by adding the actual weight of such
items with the weight of finished structural members or 7% of weight for finished
structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for
finished structal members weighing less than 22.5 Kg. / m. may be increased
allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being
made for these items, as per direction of Engineer In Charge. The rates are
considered for a height of erection 8m. / 2nd floor level from the ground. Add
1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or
part thereof.
For Structural Works in Roof Trusses etc. using joists, channels and angles of
specified section weighing less than 22.5 kg/ m

160 Supplying fitting and fixing 600 mm (+/- 30 mm) diametre R.B.T 800.00 M 481.00 #VALUE! #VALUE!
(Reinforced Barbed Tape) Concertina fencing on wall top using
concertina coils stretched to approx.6 meters length at site clipped
with two nos. of horizontal R.B.T strands which will be tensioned
and fixed with the vertical M.S angle iron posts by means of
security fasteners (such as 'C' clips, R.B.T clips etc.)

161 Supplying, fitting galvanised 2 ply 12 gauge / 2 points line of 1600.00 %M 2508.00 #VALUE! #VALUE!
barbed wire in fencing (holes already made in the body of the
post) or fixed by staples tightening and fixing the wires in taut
condition with straining bolts including the cost of cutting and of
lapping joints in the wire as necessary but excluding the cost of
galvanised staples,straining bolt and binding wire as necessary 2
ply 12 gauge/ 2 points.
(Payment to be made on the length of individual lines of wire.)

162 ELETRICAL 250.00 points 1247.00 #VALUE! #VALUE!


Distn. wiring in22/0.3 (1.5 sqmm) single core stranded 'FR' PVC
insulated & unsheathed single core stranded copper wire (Brand
approved by EIC) in 19 mm bore, 3 mm thick polythene pipe
complete with all accessories embedded in wall to light/fan/call bell
points with Modular key type switch (Brand appd by EIC) as per
GS
( Av. Run- 10 Mtr.) ( At NTH- 510 Pts. & At NTS- 840 Pts.)
8 Mtrs (1 (iii)/E-20)

162.01 10 Mtrs (1 (v)/E-20 742.00 points 1472.00 #VALUE! #VALUE!

163 Distn. wiring in22/0.3 (1.5 sqmm) single core stranded 'FR' PVC 86.00 points 277.00 #VALUE! #VALUE!
.insulated & unsheathed single core stranded copper wire (Brand
approved by EIC) in 19 mm bore, 3 mm thick polythene pipe
complete with all accessories embedded in wall to 240V 6A 5 pin
plug points with Modular key type plug socket & switch as per GS
On board (3(i) E-20)

164 Cutting Channel with 40mmx40 mm of required size on masonry 5460.00 m 76.00 #VALUE! #VALUE!
wall by Electric operated cutting machine incl. supplying & fixing of
heavy gauge Polythene pipe of following diameter as per GS.
19 mm dia 3 mm thick [6 (a)/ E- 3]

164.01 25mm dia 3 mm thick [7 (a)/ E- 3] 600.00 m 94.00 #VALUE! #VALUE!

165 Supplying and Drawing 1.1 KV single core stranded 'FR' PVC 700.00 m 62.00 #VALUE! #VALUE!
insulated & unsheathed single core stranded copper wire of the
following sizes in the prelaid polythene pipe as per GS.
3 x (1.5 sqmm) [1(b) / E- 9]

165.01 2x(2.5 sqmm)+1x(1.5 sqmm) power plug [ 1(s) / E-9] 3660.00 m 84.00 #VALUE! #VALUE!

165.02 2x(4 sqmm)+1x (2.5 sqmm) Ac work [1(v) / E- 9] 400.00 m 123.00 #VALUE! #VALUE!

22 of 28
165.03 2x (6 sqmm) + 1x (4 sqmm) PDB to SPNDBV 1200.00 m 181.00 #VALUE! #VALUE!
[ 1 (y) / E- 9]

165.04 4x(16 sqmm)+2x10 sqmm) for TPNDB [1(g1) IE- 9] 600.00 m 1041.00 #VALUE! #VALUE!

166 Finishing of the following size PVC insulated wire ends by 80 set 7.00 #VALUE! #VALUE!
socketting with pin/ ring type copper sockets and insulated tapes
etc., including supplying sockets, tapes.
2.5sq.mm [9(i) / E- 9)

166.01 4.00sq.mm [9(ii) I E- 9] 200 set 8.00 #VALUE! #VALUE!

166.02 6sq.mm [9(iii) / E- 9] 30 set 10.00 #VALUE! #VALUE!


166.03 16sq.mm [9(v) / E- 9] 30.00 set 19.00 #VALUE! #VALUE!

167 Supplying and fixing polythene pipe (3mm thick) complete with 2980.00 m 43.00 #VALUE! #VALUE!
fittings as necy. under ceiling/beam, bound with 22 SWG GI
binding wire incl. supplying and drawing 1x18 SWG GI Wire as fish
wire as per GS.
19mm dia [1(b)/E-2)

167.01 25mm dia [ 1(c) I E-2) 300.00 m 61.00 #VALUE! #VALUE!

168 Supplying & Fixing sheet metal inspection box (16 SWG) of the 100 each 174.00 #VALUE! #VALUE!
following sizes(in mm ) flushed in wall as per GS
150 x 100 x 65 [11(b)/E-4)

168.01 175x100x65 [11 (c)/E-4] 120 each 192.00 #VALUE! #VALUE!

168.02 200 x 150 x 65 [11 (d)/E-4] 80 each 263.00 #VALUE! #VALUE!

169 Supplying and fixing double-door SPN MCB Distribution Board will] 60 set 2285.00 #VALUE! #VALUE!
IP- 42/43 protection, concealed in wall as per GS.
2+12 Way[ Legrand ] [13 / D- 9 ]

170 Supplying and fixing double door Horizontal TPN MCB Distribution 30 set 3717.00 #VALUE! #VALUE!
board with IP-42/43 protection, concealed in wall-as per GS.
( Make - Legrand)
4Way [ 14 / D- 10]

171 Supplying and fixing double door Vertical TPN MCB Distribution 3 set 11204.00 #VALUE! #VALUE!
board for MCCB incomer with IP-42/43 protection, on angle iron
frame on wall as per GS( Make - Legrand)
4Way (Up to 160 A) [15 / D-11]

171.01 8Way (Up to 160 A) [15 / D- 11] 6 set 13903.00 #VALUE! #VALUE!

172 Supplying and fixing 240/415 V MCB Isolator on din rail of existing 80 each 457.00 #VALUE! #VALUE!
DBs and necessary connection as per GS [Make-Legrand]
40A DP [6 / 0- 5]

172.01 63 A FP [6 / D- 5] 30 each 1108.00 #VALUE! #VALUE!

173 Supplying and fixing 240/415 V MCB of Breaking capacity 10kA & 960 each 249.00 #VALUE! #VALUE!
C characteristics on din rail of existing DBs and necessary
connection as per GS [Make -Legrand ]
6-32 SP [7/ D- 6]

173.01 63 A TP [7 / D- 6] 51 each 1878.00 #VALUE! #VALUE!

174 Supplying and fixing 415 V Four Pole MCCB of Breaking capacity 3 each 10674.00 #VALUE! #VALUE!
25kA/35kA in existing Vertical DBs including necessary connection
as per GS [Make - Legrand ].
100 A FP [10 / D- 8]

174.01 200 A FP [10 / D- 8] 6 each 19413.00 #VALUE! #VALUE!

175 Supplying and fixing 415V, TPN on load front operated 1 each 19495.00 #VALUE! #VALUE!
Changeover switch with Sheet Steel enclosure on angle iron frame
on wall with nut bolts etc as per GS [Make L& T].
250A [3(a) / D-2]

23 of 28
176 Supplying and fixing double door sheet steel (16SWG), powder 39 each 1319.00 #VALUE! #VALUE!
coated cable end box for TPN DB vertical enclosure with IP-
42143as per GS
4 / 6 / 8 / 12Way [16 / D -12]

177 Supply & Fixing 240 Volt, Modular type FAN Regulator (Step 232 each 506.00 #VALUE! #VALUE!
Type) (Brand appd by EIC) 16A Modular type on existing modular
GI switch board with top cover plate incl. making necy connection.
E-18 / 10

178 Supply & Fixing Rj45 suitable for CAT6 cable (Brand appd by ElC) 20 each 251.00 #VALUE! #VALUE!
with PVC board and top cover plate on wall and making necy.
connection & testing reqd.
E-18 / 8(a)

179 S/F telephone socket Rj11 modular type PVC board as per GS 20 each 201.00 #VALUE! #VALUE!
E-18/8(b)

Total in Figures #VALUE! #VALUE!

Quoted Rate in Figures #VALUE! #VALUE!


Less (-) 11.8000%

Quoted Rate in Words #VALUE!

24 of 28
Please Enable Macros to View BoQ information
Q information
Please Enable Macros to View BoQ information
Q information

You might also like