Professional Documents
Culture Documents
SPOILER Construction Panel Changes Final
SPOILER Construction Panel Changes Final
0
November 2020
#1 - 55 new objects in the ZIP worker panel.
#2 - 62 new objects in the ZIP Architect panel and 35 new objects in the ZIP
Manager/Supervisor panel.
#3 - 38 current objects fixed in the construction panels.