3.5 If we assume a 24-hour workday (3 shifts), How many patients on the average will be
arriving per day? (5 pts)

3.6 Suppose the cost of lost time for each worker is $60 per hour (or $1 per minute), what is
the total cost per day from lost time for this system? (5 pts)

3.5 24 hrs x 2/hr = 48 clients/day


3.4 Depending on number of memebrs in the team.