Professional Documents
Culture Documents
Option B
Sales x Price X Probability1 + Sales X Price X Probability2
= 75,000 X 710 X 0.61 + 70,000 X 710 X 0.39
= 32,482,500 + 19,383,000
= 51,865,500 – Value Engineering Cost
= 51,865,500 – 120,000
= 51,745,500
Failure Points: Hospital parking- Limited due to the congestion of both hospital
ambulances and regular cars, The number of ambulances is limited as well as the
number of stretchers and wheel chairs, There may also be a problem in hospital
infrastructure as most of the time, nurses are the ones doing the initial visible work.
There may be a need for more nurse or volunteer staff for the initial greeting and
registration
Poke Yokes: Use of the overhead system so as to inform patients when they are called
in, this lessens the burdens on nurses to look for the patient. The overhead system can
also be used to call in nurses or inform them of any needs in the department. The
updated computer systems would make sure that the access to and admission of
information is seamless and without problems. The system should be user friendly as
well as always updated. There is also an automatic feature in the system for updating
the patient’s files. This ensures that the information given to the doctor in charge is
always up to date and reliable.
PART 3C – (20Points) DO A HOUSE OF QUALITY MATRIX FOR THE PROJECT –
BUILD A CAFETERIA FOR Medical City Staff and guests