NED UNIVERSITY OF ENGINEERING & TECHNOLOGY

CE-514: DESIGN OF TALL STRUCTURES


M.E Structures (Weekend)

ASSIGNMENT No. 02

Pressure Floor Catchment Building Story Moment Moment


Z (ft) Kz Force (kip)
(lb/ft2) height heights Width Shear (kip) (kip-ft) (kip-ft)

550 1.82 31.8682 50 25 180 143.4 143.4069 78873.8 0


500 1.75 30.6425 50 50 180 275.8 419.1894 137891.3 78873.8
450 1.67 29.2417 50 50 180 263.2 682.3647 118428.9 216765
400 1.58 27.6658 50 50 180 249.0 931.3569 99596.88 335193.9
350 1.49 26.0899 50 50 180 234.8 1166.166 82183.19 434790.8
300 1.39 24.3389 50 50 180 219.1 1385.2161 65715.03 516974
250 1.28 22.4128 50 50 180 201.7 1586.9313 50428.8 582689
200 1.16 20.3116 50 50 180 182.8 1769.7357 36560.88 633117.8
150 1.02 17.8602 50 50 180 160.7 1930.4775 24111.27 669678.7
100 0.86 15.0586 50 50 180 135.5 2066.0049 13552.74 693790
50 0.63 11.0313 10 30 180 59.6 2125.57392 2978.451 707342.7
40 0.57 9.9807 20 15 180 26.9 2152.52181 1077.916 710321.2
20 0.42 7.3542 5 12.5 180 16.5 2169.06876 330.939 711399.1
15 0.37 6.4787 15 10 180 11.7 2180.73042 174.9249 711730
0 0 0 0 7.5 180 0.0 2180.73042 0 711904.9

Story Shear (kip) Moment (kip-ft)


0 500 1000 1500 2000 2500 0 100000 200000 300000 400000 500000 600000 700000 800000
600
550 143.4069

500 419.1894 550 1; 550

450 682.3647 500 2; 500

400 931.3569
450 3; 450
350 1166.166
400 4; 400
300 1385.2161

350 5; 350
250 1586.9313

200 1769.7357 300 6; 300

150 1930.4775
250 7; 250

100 2066.0049
200 8; 200
50 2125.57392
150 9; 150
40 2152.52181

20 2169.06876 100 10; 100

15 2180.73042 50 11; 50
12; 40
0 2180.73042 13;
14; 20
15
0 15; 0