Professional Documents
Culture Documents
mouldings
CEILING
CORNICE
installation
F o r D e c o r at i n g W a l l s A n d C e i l i n g s
Tools and materials
2 i n t e r i or a n d fa c a de mou l di n gs
Adhesive
Important! The following information is relevant for Evroplast «Adhesives». If you use other adhesives ,
follow manuals on it’s package .
Work performance conditions: the temperature while performing the works and the next 24 hours must
be at least + 8 ° C. Indoor relative air humidity must be 40%. Required to keep the product in the room
for 24 hours at least.
Requirements to the surface: prepared surface must be dry, degreased, cleaned from dust. Weak mineral
substrates should be pre-strengthened by suitable primer.
i n t er i o r an d f acad e m o u l d i ngs 3
Ceiling cornice installation
1 2
Firmly press the product to the wall and the By use of chalkline to connect the marks
ceiling, make a mark on the bottom edge on the perimeter of the room.
of the product.
3 4
By use the Adjustable square to measure Using a mitre saw, cut out the element to
the angles of the room. the appropriate angle. In a room with 90°
angles a mitre box or a handsaw can be
used.
4 i n t e r i or a n d fa c a de mou l di n gs
For Decorating Walls And Ceilings
5 6
Apply evenly on the mounting surface Mul- Attach the item to the place of installation,
tipurpose glue along the whole length. The using as benchmarks the previously made
thickness of the applied adhesive should marks on the wall. Push the entire length of
be 3-5 mm. the item so the adhesive exudes from the
entire plane.
7 8
i n t er i o r an d f acad e m o u l d i ngs 5
Ceiling cornice installation
9 10
11 12
6 i n t e r i or a n d fa c a de mou l di n gs
For Decorating Walls And Ceilings
13 14
Apply Multipurpose or Assembly glue to Press the cornice to the wall and ceiling
the surfaces adjoining of the next cornice. until the adhesive shows on the whole sur-
face of the junction. By moving the product
along the wall press to the next cornice till
glue will appear at the junction.
15 16
i n t er i o r an d f acad e m o u l d i ngs 7
Ceiling cornice installation
17 18
Continue the process of installation of the After the full hardening (3 hours) of the
next cornice. adhesive treat the joints with Fine grain
abrasive paper.
19 20
Fill the treated area with fine-grained, wa- Fill the spaces in the junction area between
ter-soluble filler for interior works, repeat the cornice and the walls/ ceiling, where
Step #18 if needed, until you get a flat the adhesive has not shown on a surface.
surface.
8 i n t e r i or a n d fa c a de mou l di n gs
For Decorating Walls And Ceilings
21 22
Wipe the area of the junction with a wet Paint the cornice following the instruction
cloth. Wet the cloth with water if Assembly of paint producer, starting with the corners
glue is used and with Acetone in case of of the elements (room).
using Multipurpose glue or Glue for bond-
ing joints.
i n t er i o r an d f acad e m o u l d i ngs 9
сла
айд
www.gaudidecor.eu