Construction Budget: To This Spreadsheet
Construction Budget: To This Spreadsheet
We're pleased to provide you with this budgeting spreadsheet for your building project.
Using the Spreadsheet: The Summary section is automatically populated when figures are entered in any of
the 24. sections of the spreadsheet. The "total" formula may need to be adjusted in those sections where
lines are added.
Note: Please check all of your work carefully to ensure accuracy. We are not responsible for any errors, omissions, changes, deletions
to this spreadsheet.
1. Preparation: Blueprints, Survey & Start Up Fees Estimate Accepted Bid Actual Cost Over or Under
Land or lot cost including surveying and any inspection fees $ - $ - $ - $ -
Designer/draftsperson/architect and blueprint copies $ - $ - $ - $ -
Building and soil engineers $ - $ - $ - $ -
Building Permits and all other fees $ - $ - $ - $ -
Project Management Fee $ - $ - $ - $ -
Insurance $ - $ - $ - $ -
Temporary Electricity $ - $ - $ - $ -
Temporary Water $ - $ - $ - $ -
Taxes/levies $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Preparation $ - $ - $ - $ -
4. Basement & Garage Floor Estimate Accepted Bid Actual Cost Over or Under
Gravel & compaction $ - $ - $ - $ -
Rebar $ - $ - $ - $ -
Concrete $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Basement & Garage Floor $ - $ - $ - $ -
5. Structure: Framing materials & Labour Estimate Accepted Bid Actual Cost Over or Under
Main subfloor $ - $ - $ - $ -
Second floor subfloor $ - $ - $ - $ -
Interior walls $ - $ - $ - $ -
Roof framing $ - $ - $ - $ -
Garage framing $ - $ - $ - $ -
Basement framing $ - $ - $ - $ -
Back framing $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Structure $ - $ - $ - $ -
6. Log/Hybrid Home Package Estimate Accepted Bid Actual Cost Over or Under
House package $ - $ - $ - $ -
Truck/transportation $ - $ - $ - $ -
Crane $ - $ - $ - $ -
Assembly $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Log Home Package $ - $ - $ - $ -
7. Windows & Doors Estimate Accepted Bid Actual Cost Over or Under
Window and door package $ - $ - $ - $ -
Garage doors $ - $ - $ - $ -
Skylights or specialty glass $ - $ - $ - $ -
Installation $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Windows & Doors $ - $ - $ - $ -
8. Roofing Material & Labour Estimate Accepted Bid Actual Cost Over or Under
Roofing materials $ - $ - $ - $ -
Installation $ - $ - $ - $ -
Flashing $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Roofing Material $ - $ - $ - $ -
10. Fascia: Soffits and Gutters Estimate Accepted Bid Actual Cost Over or Under
Soffit and Fascia $ - $ - $ - $ -
Gutters and downspouts $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Fascia $ - $ - $ - $ -
11. Log/Timber Other Estimate Accepted Bid Actual Cost Over or Under
Stairs and railing $ - $ - $ - $ -
Stain - interior $ - $ - $ - $ -
Stain - exterior $ - $ - $ - $ -
Chinking $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Log/Timber Other $ - $ - $ - $ -
16. Interior Finish Estimate Accepted Bid Actual Cost Over or Under
Drywall and taping $ - $ - $ - $ -
Millwork $ - $ - $ - $ -
Trim $ - $ - $ - $ -
Log Trim $ - $ - $ - $ -
Hardware $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Interior Finish $ - $ - $ - $ -
19. Floor Coverings Estimate Accepted Bid Actual Cost Over or Under
Carpet $ - $ - $ - $ -
Ceramic/stone $ - $ - $ - $ -
Wood Flooring $ - $ - $ - $ -
Basement $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Floor Coverings $ - $ - $ - $ -
20. Painting & Decorating Estimate Accepted Bid Actual Cost Over or Under
Paint non-log walls and ceiling $ - $ - $ - $ -
Wallpaper $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Painting & Decorating $ - $ - $ - $ -
22. Decks, Driveway & Landscaping Estimate Accepted Bid Actual Cost Over or Under
Decks $ - $ - $ - $ -
Driveway $ - $ - $ - $ -
Retaining walls $ - $ - $ - $ -
Sidewalks $ - $ - $ - $ -
Landscaping $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Decks, Driveway & Landscaping $ - $ - $ - $ -
23. Other Systems Estimate Accepted Bid Actual Cost Over or Under
Alarm system $ - $ - $ - $ -
Central vac $ - $ - $ - $ -
Solar Panels, etc. $ - $ - $ - $ -
Irrigation $ - $ - $ - $ -
Other $ - $ - $ - $ -
========= ========= ========= =========
Total Other Systems $ - $ - $ - $ -
Notes