You are on page 1of 14

Export 400-500 Sales Order

OTR

Import 2500-3000
BL Free Days 14/21 Planned Dates Actual Date
IMCN1 25.10.2020 24.10.2020
IMCN2 28.10.2020 28.10.2020
IMCN3 31.10.2020 01.11.2020
IMCN4 01.11.2020 01.11.2020
IMCN5 05.11.2020 05.11.2020
IMCN6 08.11.2020 10.11.2020
IMCN7 09.11.2020 15.11.2020
IMCN8 15.11.2020 12.11.2020
IMCN9 18.11.2020
IMCN10 20.11.2020
01.11.2020
Delivery
DTR FU-->CU-- Container Requirement

Transit Days Submission of Container


09.11.2020
12.11.2020
15.11.2020
16.11.2020
20.11.2020

CN1 IMCN7 Container No. IMCN1


CN2 IMCN2
CN3 Hold IMCN3
CN4 Hold IMCN4
CN5 Request Empty Provisioning IMCN5
IMCN6
IMCN7 Traingulated
IMCN8 Hold
IMCN9 Hold
IMCN10

20ft / 40ft
Source Location / Destination
Selection Screen

Source Location Mandatory No Interval

Container Size 2Oft

Date Mandatory

Fetch container units Range

Output Screen
Direct Mapping Hold Empty Provisioning

Containers Requirement

CU Src Lo Des Loc Qty req date

13-Nov
Status Triangulated

Available Containers
Logic

Direct Mapping Update Custom table


Also Update the container number taking from selected available contai
Custom table staus to be updated with - 01 (Triangulated)

Hold Update Custom table


Custom table staus to be updated with - 02 (Hold)

Empty Provisioning Update Custom table


Custom table staus to be updated with - 03 (Empty Provisioned)
Create freight order for the record selected in the left side to bring the e

POWL 1 (Overview TriReads all entries from custom table and displays

Triangulati 1 Triangulated
2 Hold
3 Empty Provisioned
4 Released
Custom Table

Primary Key Direct Mapping Hold

X MANDT X X
X CU To be Triangulated X X
Container Size X X
from selected available containers Source Location X X
1 (Triangulated) Planned Date X X
Source Container No X
CU selected for Triangula X X
Dest Location X X
Planned Vessel Arrival DaX X
Actual Vessel Arrival Date
B/L Free Days X X
3 (Empty Provisioned) Planned B/L Free days en X X
d in the left side to bring the empty containers Actual B/L Free days end X X
Target Container No X X
Triangulation Status X X
Freight Order No
Created By X X
Creation Date X X
Creation time X X
Changed By X X
Changed Date X X
Changed Time X X

Technical Settings
Change Log X
Empty Provisioning

X
X
X

X
X
X
X
X
X
X
X
Direct Mapping
Retrieval logic ZTM_MAPPING_STAT
CU_NUMBER
CONTAINER_SIZE
STOP table with First (F) SRC_LOCATION

STOP table with F record , Field = Plan Trans Time,


Change the desc to Planned Date PLAN_ARVL_DATE
From Item table of your right side container, Read SOURCE_CONT_NO
CU_SELEC_TO_TRIAN
STOP table with First (L) DEST_LOCATION
PLAN_VESL_ARV_DT

ACT_VESL_ARV_DT
BL_FREE_DAYS
PLAN_BL_FREE_DAYS
ACT_BL_FREE_DAYS
TARGET_CONT_NO
TRIANGUL_STATUS
FREIGHT_ORD_NO
To be filled with
Table Field Logic
ZTMS_S_CONTAINER_TRIANG_CU CU_NUMBER
ZTMS_S_CONTAINER_TRIANG CONTAINER_SIZE From selection screen input (20/40ft)
ZTMS_S_CONTAINER_TRIANG SOURCE_LOC From selection screen input (20/40ft)

ZTMS_S_CONTAINER_TRIANG_CU REQ_DATE
ZTMS_S_CONTAINER_TRIANG_IMP_CO CONTAINER_NUMBER
ZTMS_S_CONTAINER_TRIANG_IMP_CO CU_NUMBER
ZTMS_S_CONTAINER_TRIANG_IMP_CO DEST_LOCATION
ZTMS_S_CONTAINER_TRIANG_IMP_CO PLAN_ARVL_DATE

Read EXEC associaton (Table -


/SCMTMS/D_TOREXE)for
'ZTMS_S_CONTAINER_TRIANG_IMP_C
O-CU_SELEC_TO_TRAIN' and read
Event data of Event -
ZEM_CU_ARRIVAL_PRT, Actual Date
and Time value to be picked up
ZTMS_S_CONTAINER_TRIANG_IMP_CO BL_DAYS
Add BL_DAYS to PLAN_ARVL_DATE
Add BL_DAYS to ACT_VESL_ARV_DT if actual date is
ZTMS_S_CONTAINER_TRIANG_IMP_CO CONTAINER_NUMBER
01 for Direct mapping
Empty for Direct Mapping. To be filled only for Emp
ARV_DT if actual date is determined

o be filled only for Empty provisioning


ALL only 1 record should be selected for running this functionality
SP5210 20 31.12.2020