KEY PLAN

A
-
TOWER-1
PES-013
TOWER-2
PODIUM
GENERAL NOTES
1. DO NOT SCALE FROM THE DRAWINGS.
2. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
STRUCTURAL, MECHANICAL, ELECTRICAL AND CIVIL DRAWINGS AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS.
4. ALL LEVELS ARE RELATIVE TO D.M.D (DUBAI MUNICIPALITY DATUM).
5. FOR STRUCTURAL CALCULATION REPORT REFER APPROVAL DTF 1901-02,1900-02,
2151-01,1906-02,1907-02 & APPROVED CONCEPT SHOP DWG.REFER DTF 1902-02,
1905-02,1903-02,1904-01,1908-01,2152-01
6. SEALANT BITE REFER APPROVED DOCUMENTS D1D2-MAR-A-0150/D1D2-MAR-A-0155
7. SINCE THIS IS A SHOP DWG , THE REQUIRED SECTION AND DETAIL OF GRC PANEL
BESIDE THE GLAZING SYSTEM SHALL BE SHOWN SEPERATLY AFTER DETAILED
CO-ORDINATION WITH GRC.
8. SCHUCO SYSTEM MATERIAL REFER APPROVED DOCUMENTS D1D2-MAR-A-0091/92/95//97
9. FOR SUPER DURABLE POWDER COATING APPROVAL REFER DOCUMENTS D1D2-MAR-A-0107
10. GLASS SPECIFICATON REFER APPROVED DOCUMENTS D1D2-MAR-A-0104 /105.
11. COMPATIBILITY STATEMENT ON ALL DIFFERENT MATERIAL SHALL BE PROVIDED SEPRATELY.
12. FOR GLASS & VALUE REFER THERMAL CALCULATION APPROVED DFT 1909/1910/2030/2031.
OUTSIDE
13.DESIGN OF BMU & CONCEPT DWG WILL BE SUBMITTED SEPARATELY.
REFERENCE DRAWINGS
DRAWING NAME DRAWING NUMBER
ARCHITECT ELEVATION 60345201-P-ACM-DG-AR-2022
ARCHITECT PLAN - 1st FLOOR 60345201-P-ACM-DG-AR-1001-01
ARCHITECT PLAN - 2nd FLOOR 60345201-P-ACM-DG-AR-1002-01
STRUCTURAL PLAN - 1st FLOOR 60345201-P-ACM-DG-ST-1101-01
STRUCTURAL PLAN - 2nd FLOOR 60345201-P-ACM-DG-ST-1102-01
INSIDE
INSIDE
00 30.09.2020 Issued For Approval LL MZ GO
INSIDE REV DATE DESCRIPTION DRAWN CHECK. APP.
REVISIONS
CONTRACTOR COORDINATION BOX
Senior Structural Chief Coordinator MEP Mechanical Electrical Sub-Contr
Engineer Architect Coordinator Engineer Engineer
DATE:
DATE: DATE: DATE: DATE: DATE: DATE:
SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:
11
PES-0690 SCALE 1:2
Eng Manager DATE: SIGNATURE: Project Manager DATE: SIGNATURE:
CONSULTANT REVIEW BOX
A B C D
REVIEW STATUS Approved Approved With comment Revise & Resubmit Rejected
DATE REVIEWED
REVIEWED BY
IN NO CASE SHALL APPROVAL ACCEPTANCE BY THE COMPANY INTERPRETED AS RELEASING
OUTSIDE CONTRACTOR FROM HIS RESPONSIBILITIES TO FULFILL AS REQUIREMENT OF THE CONTRACT
DOCUMENT.
PROJECT: D1D2 FORTE TOWER
DOWN TOWN DUBAI DEVELOPMENT
UAE DUBAI
CLIENT EMAAR PROPERTIES - PJSC
P.O.Box 9440
DUBAI, UNITED ARAB EMIRATES
PMC HOLFORDS AND ASSOCIATES
Ground Floor, Wafi Residence Building,
Oud Metha Road, P.O.Box 28166, Dubai,
United Arab Emirates
10
LEAD CONSULTANT AECOM MIDDLE EAST LTD.
ARCHITECTS, PLANNERS & INTERIOR DESIGNERS
PES-0690 SCALE 1:2 P.O. BOX: 51028 DUBAI, UAE
TEL: +97144391000 FAX: +97144391001
INSIDE MAIN CONTRACTOR: TARGET Engineering
Construction Co. L.L.C
P.O. BOX : 119451 Dubai, U.A.E - Tel. : 04-4470495
A Fax : 04-4470495 E-mail : civil@target.ae Website : www.target.ae
-
SUBCONTRACTOR:
 : 5818, SHARJAH, U.A.E : +971 06 536 9788
: www.zebian.ae : +971 06 536 9787
: info@zebian.ae
TITLE:
FRAMELESS GLASS WITH GLASS FIN
DETAILS
SCALE DRAWN BY: JS CHECKED BY: MZ APPROVED BY: GO
DATE: 30.09.2020 DATE: 30.09.2020 DATE: 30.09.2020
AS SHOWN SIGNATURE: SIGNATURE: SIGNATURE:
DTF NO : DATE : 30.09.2020
PREVIOUS DTF NO : DATE :
DRAWING NUMBER
12 A Name Of Project Dwgs Steps Discipline Bldg Zone of Bldg Type Level Running Number REV
PES-0690 SCALE 1:2 PES-0690 SCALE 1:2
FORTE-D1D2 SD D05 T2 00 1 PE DET-1025 0