Topics of Knowledge Sharing

1 Introduction to Cellular RAN

2 HUAWEI DBS3900s Overviews

3 RRUs Overviews

4 Power Modules

5 FAN Unit
SLPU(Signal Lighting Protection Unit )/ Optional
Overviews on BTS Hardware Networking

6 U2020Mobile Element Management System

7 Common Faulty & Alarms Descriptions with


Troubleshooting Guidance
8 RAN Routine Hardware & Remot Maintenance
Over Views

9 Preventive Maintenance/PM

10 Operation and Maintenance Performance Enhancing


Solution(OMPES)

11 Trouble Ticket Overviews

12 Miscellaneous
& On job Training Contents
Time Frame Achieved(YES/NO )
Week 43 on progress
Overviews of Wireless Communication
2G-RAN (GSM-EDGE RAN)
3G-RAN (UMTS RAN)
4G-RAN /eUTRAN(LTE RAN)
Week 43 Planned
Introduction on Hardware Components of DBS3900
Overviews on BBU3900 Hardware Architecture
BBU3900 Physical Structure(Onsite visiting )
BBU3900 Slot Assignment
Typical & Principles Configuration of BBU Boards
BBU3900 Cable Connections
Week 43 Planned
RRUs Physical Structure(Onsite Visiting)
RRUs Logical Structure & Technical Specification
RF Cable Connections (Common Scenarios)
CPRI Cable Technical Specification
Week 43 Planned
Power Distribution Modes(03)
Direct Current Distribution Unit01(DCDU01, 03B)
Week 43 Planned

BTS Networking Topology(STAR;CHAIN;TREE;RING)


RF Unit Topology
Week 43 Planned
Logging in to the Client U2020
Introduction on Client Applications
Creating/Browsing Current Alarms
Viewing Alarm Details on Main Root Topology
Setting Alarm Rules
Creating/Browsing Historical Alarm Events
Week 44 Planned

ALM-26532 RF Unit Hardware Fault


ALM-26529 RF Unit VSWR Threshold Crossed
ALM-26546 RF Unit External Power Supply Insufficient
ALM-26520 RF Unit TX Channel Gain Out of Range
BBU Optical Module Interface Error
BBU Optical Module Transmit/Receive Fault
ALM-28009 Carrier No Traffic
ALM-26522 RF Unit RX Channel RTWP/RSSI Unbalanced
ALM-28008 Radio Link Failure
ALM-25881 MAC Excessive Frame Error Rate
ALM-28008 Radio Link Failure
ALM-26811 Configured Capacity Limit Exceeding Licensed Limit
ALM-26101 Inter-Board CANBUS Communication Failure
Week 44 Planned

Replacing UMPT
Replacing WBBP/e4/f1;f2
Replacing RRU
Replacing UPEU
Replacing FAN Unit
Week 44 Planned
Routine PM &5S Site Standardization principle

Week 44 Planned

Logging in to OMPES Account


Accessing & Using APPLICATIONS ITEMS on the System
Updating NE Checklists
Updating RCA(Root cause Analysis)
Accessing Summary Reports & Extracting Backlog/Current Data
Week 44 Planned
Accessing &Monitoring TTS
Handling & Reassigning TTS
Week 44 Planned
Briefings on Service Avaliablity(NAR/NUR)
NAR Enhancing Strategies & NUR factors
Key performance Indicator(KPI) of of 2G/3G
Briefings on RAN Domain Common BSC-Points
Analyzinig data using Excel.
TX & BB introduction(Mr.Azmeraw is assigned)
Overall Power System introduction(Mr.Choul is assigned)