Maintenance Report
iv
Installation Report
‘Customer Name
HOLOGIC
Preventative Maintenance Report
Room Identification
[Hoan My Thu Duc International General Hospital
Page 1
Date of Service System SN System Software Version Detector SN
p4r28/2020 fsom131800464 | [1.9.0 /A805192
Contact Name ‘Street Address
[_r. Long f241, National Highway 1K, Linh Xuan Ward, T]
ivkh@hoanmythudi
Email Address & @ thule. com
city State Zip Code
[Ho Chi Minh
Engineer/Title Case #
[Mr. Hung
System Check Functional Check
] System Cleaning 7] CalToo! Verification 7] Half Value Layer Verification
7] System Lubrication 7] Voltage Verification 7] AEC Performance
v] System integrity v7] X-ray Tube Voltage 7] Target Dose
“| Xray Tube Current wv] Image Quality
Preventative Maintenance _installation Preventative Maintenance Period
Pass v] Complete Semiannual
AnnualTEST Equipment
Digital Multimeter
cal batepaz072070 —]
Oscilloscope
Model# {_____ Cal. Date[___
Compression Gauge
Model# LAICA J Gal. Datef03/15/2020_]
lon Chamber
Model#[____ Cal. Date]
High Voltage Tank / Probe
Cal. Datefo1/0372020_]
Solid State Measurement Device (i.e. Raysafe/Unfors/Piranha/RT!)
Serial # Cal. Datep7/2072019_]Hardware Installation
Check if a Mobile Unit
Gantry
[/] Fasten the Gantry in position (/] Verity Read Out Sequence for detector
[7] Remove the Grid Assembly Shipping Bracket [7] Install Gantry compliance label
[7] install the image Receptor
Install Remote X-ray On/Power On lamp connection (optional)
| Install Gantry Footswitch
Acquisition Workstation
[\/] Fasten the Acquisition Workstation in position 7] Install AWS compliance label
[7] Install Control Monitor (UAWS only)
Install X-ray Footswitch (UAWS only)
[7] Install the Preview Display Monitor
/] Install the Radiation Shield
[\] Install the Acquisition Workstation network cable
Mobile Gantry
Install Gantry Brake Kit
Set vertical height limit
Mobile mounting requirements reviewed with the customer
Mobile Acquisition Workstation
Install mobile mounting arm for Preview Display
Review radiation shield requirements
7] Hardware Installation Complete
Page 2System Check
System Cleaning
] Clean AWS glass 7] Vacuum AWS intake vents
(] Vacuum AWS interior ] Vacuum gantry generator exhaust vents
(] Vacuum computer fans (] Replace detector filters (ASY-07829)
System Lubrication
Inspect and lubricate VTA assembly (PN 2-580-0207)
Clean and lubricate collimator assembly (PN 2-580-0216)
Clean and reapply X-ray tube grease (Dow Corning Silicone 540-0108)
C-arm Tomo Gear Rotational Assembly (Lubricate Rotational Gear only PN 2-580-0207)
SIRI
2
system Integrity
Inspect wiring for safety and integrity
Check function of safety interlocks, switches and limit switches
Inspect AWS X-Ray Shield for damage and integrity
Inspect Vertical Height configuration (Mobile and Low Ceiling)
Verify accessory installation and operation (Face Shield, Crosshairs, Paddles, Mag Stand)
Verify C-arm function, up, down, clockwise, counter-clockwise rotation
Verify Compression function, up, down, release
Verify Tomo zero
Verify Collimator lamp operation and override (if equipped)
Verify Paddle Shifting
Verify compression force calibration
Verify compression thickness calibration
Perform paddle height offset calibration
Perform FAST Paddle compression thickness
Inspect high voltage cable connections at the Resistor Pack (2) and Multiplier Drawer
Verify C-arm and Tomo Arm Functionality
Verify C-arm zero angle
Verify C-arm Rotational Brake (Biopsy)
NINN NSPS
Verify Grid configuration (Dip Switch Settings match Grid Rev and Detector)
Caltool Verification
[¥] X-Ray LFS field alignment
[7] X-Ray SFS field alignment
[7] Light field alignmentX-ray Tube Current
10mAs
25kV
30kV
35kV
100mAs:
25kV
30kV
35kV
30kV
42kV
200mAs
30kV
35kV
39kV
42kV
400mAs
35kV
Large Focal Spot LFS
Enter mAs - Range 8 - 12
Small Focal Spot SFS
Enter mAs - Range 8 - 12
Enter mAs - Range 384-416
90
[\V] LFS X-ray Tube Current Verification Pass
10mAs.
lio 20Kv fio
fio aelio
lio 30Kv fio
35kv fio
Enter mAs - Range 96-104
39kV fi
H100
100 40mAs__ Enter mAs - Range 38.4 - 41.6
00 25Kv fio
H00 soKv so
i100 35Kv fro
Enter mAs - Range 196-204 30KV fio
00
boo [| SFS X-ray Tube Current Verification Pass
pod
00HVL Verification
Rh(28kV) Ag(28kV)
Measured mR MeasuredmR 9420
Measured HVL MeasuredHVL so |
Tube Output : Tube Output |
HVL in File HVL in File |
TO in File TO in File |
Al(29kV)
Measured mR
Measured HVL
Tube Output
HVL in File
TO in File
Measured value must be within 5% of File value to Pass.
[¥] HVL Verification Pass[Hells|fellsllsMleltls
SIEIIIEIILIL
LUDO
DOOOOO00o
El
Dose
mAs
Filter kV
[¥] AEC Performance Pass
AEC Performance
ThickSOU iS]Computer Settings (Installation Only)
[7] Configure Windows time zone and date
7] Configure network settings
[7] Configure computer host name
Configure/Verify/Email Hologic Connect settings (optional)
7] Computer Setting Complete
Application Settings (Installation Only)
Enable AWM (optional)
Configure Institution, Address Station and Locale
Configure Serial Number
Verify Reclaimer System Settings
Verify Reclaimer User Settings
Verify / Install Licenses
SUIS) IS} IS} IS} IS
Configure Generated 2D settings (optional)
[| Synthesized Method
‘Synthesized2D for CAD (optional)
[(/] Auto Mapping (Intelligent2D only)
| Set System AE Title
S
Verify Reorient Tomo, Generated 2D and Projection pixel data settings
[V] Configure Procedure RIS Codes (when available)
7] Application Settings Complete
Poge 12Interface Configuration (Installation Only)
4
|
VY]
ir)
iv
w
4
4
4)
O
iy]
Install Modality Worklist interface(s)
Install archive/router devices
Install workstation devices (as needed)
Install CAD devices (as needed)
Install printer devices (as needed)
Install Query/Retrieve interfaces
Configure installed devices’ info, IP address, AE Title and port data
Verify/install optional Image Types for store devices
Verify/Install optional Transfer Syntaxes for store devices
Verify/install marker burn-in settings for store devices
Verify/Configure film sizes for printer devices
Set/Verify Retrieve address for query/retieve devices
Configure Output Groups
Configure optional features as needed (i.e, Dose Reporting, BPO, MPPS)
Interface Configuration CompleteInterface Tests (Installation Only)
SJ IST IS) (SJ IS) LS
]
SJ IS) IS LS} US} (S) IS
Verify MWL Query results
Verify MWL RIS Code Mapping is set correctly
Verify images are stored on PACS
Verify images can be viewed from PACS
Verify images can be retrieved from PACS (optional)
Verify images can be sent to Workstations (optional)
Verify images are sent to CAD (optional)
Verify that C-View RAW is sent to CAD (optional)
Verify images are sent to DICOM printer (optional)
Verify that correct TOMO format is sent to PACS and Workstation (3D System)
Verify images annotated on SecurView arrive at Dimensions (optional)
Verify export settings for removable media
Verify paper printer if needed for QC Report, rejected images, etc. (optional)
Verify Notices are operational (optional)
Reorient pixel data
Verify Barcode Reader operation (if equipped)
Interface Tests Complete
Page 14‘