11 3 14 14 4 18
1.5.1 – Flight Path 1.5.2 – Flight path
0 6 6 6 0 6 6 5 11 Engineering testing
1.1.1 – Develop Milestone – 1.3.1 – Drone 14 3 17 17 3 21
Scope and Plan End Initiating changes 14 3.5 17.5
6 4design10 10 4 14
0 0 6 6 0 6 6 0
1.4.1 – Systems 11 11 – Specialized
1.4.2 3 14 1.4.3 – Custom
14 8 22
changes design Customer order interface
1.3.2 – Purchase Management
1.3.3 – Custom Reporting
0 3 3 6 35.5 15.59 materials Interface
drones structure
11.5 15.5 5.5 19.5
1.1.3 – Communication 1.2.5 – Processes 11 0 14 1419.5 0 5.5 22 23
Management Plan design
3 3 6 19 13 22
14 4 18 18 0 18
1.2.3 – Legal Contract Milestone –
Negotiations Contract assigned
21 7 25 25 7 25
28 0 28
Finish
28 0 28
18 2 20
1.5.3 – Pharmacy 22 2 24 24 0 24 25 2 27 27 1 28
manager drone 1.5.4 – Customization Milestone – End Flight 1.6.1 – Final 1.6.2 – Closing
operations procedures of Flight Processing operations implementation out the project
21 3 23 23 1 25 25 1 25 25 0 27 27 0 28
22 3 25
1.3.4 – Drone 25 0 25
maintenance Milestone – End
procedures Adapted drones
22 0 25 25 0 25
17.5 0 17.5
Milestone – End IT
and App interfaces
23 5.5 23