You are on page 1of 1

KEY NOTES

Concrete masonry
02
backup
03 Brick veneer

31 Horizontal joint
reinforcement
32 Wall ties

36 Air space
36
41
Rigid insulation
02 in cavity
61 Air/moisture/vapor
barrier as req'd
32
61
31

41

03

KEY WORDS
Anchored veneer, CMU, Cavity
wall, drainage wall, 01.030.0201

WALL SYSTEM Brick veneer, CMU backup, rigid insul, fluid-applied AB


Detail 01.030.0201 Rev. 11/29/15

© 2016 International Masonry Institute

You might also like