You are on page 1of 7

Offer No

Offer Date Aug 5th 2020

1000LPH monoblock RO system

PROJECT OFFER

张家港市菲派机械有限公司
ZHANGJIAGANG CITY FILL-PACK MACHINERY CO.,LTD.

Price list
Items Size(mm) Qty. Unit Price
Description Model
(USD)
1.1 Monoblock RO system with two 1600*800*1800 1set 2150
1000LPH
filters manual operation valves
EXW Price Total: 2150 USD

Options (The price difference if change to the following specifications):

1.1.1 Add the FRP manual valve water softner 1suit 150
1.1.2 Change the FRP material filters as SUS 304 material Per pcs 140
1.1.3 Change the manual control valves as auto valve Per pcs 50
1.1.4 Change the softner manual control valve as auto valve Per pcs 45
1.1.5 Change Catridge filter shell(blue plastic) as SUS 304 material 1pcs 45
1.1.6 Change the RO membranes as DOW brand 4pcs 520
1.1.7 Change all connection pipes and valves as SUS 304 material 1suit 750

Descriptions:
Options system for ref:
System with FRP softner manual control FRP filters with softner auto control
valve valve

SS filters with softner auto control valve RO System with SS softner manual
specifications for ref control valve pre-treatment part for ref
Parameters:
Items Name Specifications and model Material Brand&Origin Unit Qty.
Raw water lifting
I
unit
1 Level controller ST-70AB assembly PRADAR suit 1
CHL2-40,
2 Raw water pump SS304 NanFang set 1
380V,0.55kw,2T,30M
II Multimedium filter assembly FILLPACK
Multimedium filter
1 Φ350*1400, 150PSI FRP FILLPACK set 1
tank
Central tube, Up and
2 3\4" ABS RUNXIN suit 1
below distribution
Manual operation
3 TMF56A assembly RUNXIN set 1
valve
NO. 1-4, Filling height
4 Quartz sand assembly NingBo KG 150
1000mm
Active carbon
III assembly FILLPACK
filter
1 Filter tank Φ350*1400, 150PSI FRP FILLPACK set 1
Central tube, Up and
2 3\4" ABS RUNXIN suit 1
below distribution
Manual operation
3 TMF56A assembly RUNXIN set 1
valve
10-24MU, Filling height
4 Activated Carbon assembly Chengde kg 50
1000mm
IV Cartridge filter assembly FILLPACK
1 Cartridge filter 20INCH *3 Blue plastic FILLPACK set 2
2 PP cotton 20INCH / 5 um polypropylene FILLPACK pcs 2
5 Pressure gauge 0-0.1MPa SS304 YYST pcs 1
VI RO system
1 High pressure pump CDL2-13, 1.5KW/98m SS304 NANFANG set 1
2 RO pressure vessel R4040 SUS304 BONA pcs 4
3 RO membrane 4040 polyamide VONTRON pcs 4
Water inlet solenoid
4 DN25/AC220V BRASS YONGCHUAN pc 1
valve
Washing solenoid
5 DN20/AC220V BRASS YONGCHUAN pc 1
valve
6 Pressure gauge 0-0.6MP/0-3MPA SUS304 YYST pcs 4
High low pressure
7 0.1-3MPA SUS304 BD pcs 1
switch
Conductivity meter
8 CCT3320 assembly CREATEC suit 1
for produced water
Flowmeter for
9 Rotor type 10G acrylic YYST pcs 1
produced water
Flowmeter for salinity
10 Rotor type 10G acrylic YYST pcs 1
water
Flowmeter for salinity
11 Rotor type 40G acrylic YYST pcs 1
water
12 Main frame of RO Stainless Steel SS304 FILLPACK suit 1
VII Connecting pipe
Tubing / fittings / UPVC/
1 DN20/DN25 XieYu/China suit 1
valves GB

VIII Pure water tank

1 Level controller ST-70AB assembly PRADAR suit 1

IX Electrical system
1 control cabinet BD-4.0 matching FILLPACK suit 1
2 Programmer RO-2015 matching CREATEC suit 1
3 Air switch suit 1
4 AC contactor suit 2
5 Thermal relay suit 2
6 Intermediate relay assembly CHNT suit 4
7 Button / switch suit 3
8 wire suit 1
9 accessories suit 1
1700*700*1800MM Host machine pcs
Wooden frame
X 400*400*900MM Salt box pcs 3
packaging
900*800*700MM Filtration materials pcs

Payment Term: 30% as deposit, 70% before shipment.


Delivery: 20-25 days after deposit receipt
Packing: Wooden case

Our service:
1.Technical support
 Before the customer purchasing equipment, we will recommend the most suitable water
treatment system to you. Once you have any question about water treatment system, we will
try our best to provide the most professional solutions.
 We can help with the placement drawing and equipment layout if you need.
 If the customer can provide water analysis report of the original water, we can help with the
water quality analysis. If the customer don’t have, we can also find relevant agents to do
water quality analysis as long as we can get the original water.
 We can recommend spare parts and relevant equipment accordingly to the customer.
2.Production status update
 We are responsible for showing the production progress of production line to the customer
regularly until all the equipment are delivered.
 Before shipping, we will send detailed equipment photos, spare parts and accessories photos,
production line running videos, packing photos and delivery photos to the customer online. If
the customer think it’s necessary to inspect on site, we can also arrange it according to the
customer’s requirements.
3.Installation & commissioning
 After the equipment arriving at the customer’s site, we suggest the customer to unpack to
verify well arrival and arrange the equipment placement according to the drawing already
fixed.
 If requiring on site technical guidance, we will also cooperate with it. The customer have to
inform us his application ahead of time on the equipment delivery. Then, we will arrange it
into the commissioning lists and try to confirm a proximate date(except unpredictable factors )
according to actual conditions. Afterwards, the customer have to help our technician with visa
application and documents preparation.
 If requiring on site installation and commissioning, all the of costs including visa, round trip
flights, food, traffic, livings as well other local costs are at customer’s expense. At the
meantime, the customer should pay wage to our technician(Asian area USD80/person/day,
other areas USD100/person/day). The time is calculated from flight going date to flight arrival
back date. Meanwhile, The expense should be settled by cash at last before our technician
leave your site.
4.Training
 We will provide customer particular equipment instruction of our production line, the customer
can follow the instruction when install and commission. Once the customer meet any trouble
when operating, we will give prompt guidance.
 If the customer require on site learning, it’s better to arrive at our our factory one week
before delivery.
5.Quality assurance
 We guarantee the goods offered are brand-new, not used, with latest design and suitable
material made, and we guarantee the specification of the equipment is consonance with the
contract.
 We guarantee the line achieve product technical performance indicators within 5 days after
feeding operation through the correct guidance of the installation and commissioning.
 We are responsible for the fault and damage of the production line caused by our design,
technology, manufacture, installation, adjustment and material defect etc. that all belong to
our responsibility.
 The warranty period is 12 months after acceptance check of the production line. If there is
any difference between the furnished equipment in the customer’s factory and the equipment
concerned in the contract, the users have the right to pass the inspection book to the legal
department to claim for compensation to our company within goods warranty period.
 Offer 12 months maintenance period to the problem that caused by our design, manufacture
and the material quality, and offer the relevant parts and effective service for free for above
reason.
6.Further support
 We can provide customer all the spare parts and accessories for selling after the expiration
date.
 We will offer customer widely and favorable technical support, after-sales service lifelong.

You might also like