You are on page 1of 3

Conductor

Casing

Tampo load of
Conductor/casing OD, WH sitting on WH BOP load transferred
conductor/casing on
in support/CD to CD
CD, kips
26 and 20 No No 100-150
9 5/8 No 50-90 0
9 5/8 Yes 50-90 45
13 3/8 No 50-90 0
13 3/8 Yes 50-90 60
Added slot strap curved 13 3/8 No 50-90 15
Added slot strap curved 13 3/8 Yes 50-90 60

Notes:
BOP from jackup 90 kips
BOP from RLU 50 kips
Scab 13.375" normally has soil penetration of 10 ft.
26, 20 in Only temporary hanging load of conductor, no BOP
9 5/8

Total Load sitting on CD

100-150 kips from surface conductor


Only BOP load of 50-90 kips
BOP+45
Only BOP load of 50-90 kips
BOP+60 * Some platforms has scab installed at sub CD.
BOP load of 50-90 kips + 15
BOP+60
ging load of conductor, no BOP load because BOP transfers to conductor and conductor to soil.

alled at sub CD.