Professional Documents
Culture Documents
Casing
Tampo load of
Conductor/casing OD, WH sitting on WH BOP load transferred
conductor/casing on
in support/CD to CD
CD, kips
26 and 20 No No 100-150
9 5/8 No 50-90 0
9 5/8 Yes 50-90 45
13 3/8 No 50-90 0
13 3/8 Yes 50-90 60
Added slot strap curved 13 3/8 No 50-90 15
Added slot strap curved 13 3/8 Yes 50-90 60
Notes:
BOP from jackup 90 kips
BOP from RLU 50 kips
Scab 13.375" normally has soil penetration of 10 ft.
26, 20 in Only temporary hanging load of conductor, no BOP
9 5/8