You are on page 1of 12

JOB PROFILE CHART (JPC)

SECTOR ELECTRICAL AND ELECTRONIC, TELECOMMUNICATION & BROADCASTING


SUB SECTOR INDUSTRIAL ELECTRONICS
JOB AREA ELECTRONIC EQUIPMENT & APPLIANCE INSTALLATION & TROUBLESHOOTING
JOB LEVEL TWO (2) JOB AREA CODE

COMPETENCY COMPETENCY UNIT


Instrument and Test Instrument and Test
Electronic Schematic Industrial Electronic
Equipment Set Up & Equipment
CORE Drawing Equipment Installation
Handling Troubleshooting

             
Industrial Electronic
Equipment
Troubleshooting

SLR-XXX-05

Electronic Appliance Electronic Appliance


ELECTIVE Troubleshooting
Installation

COMPETENCY PROFILE (CP)


1

FIGURE 1: JOB PROFILE CHART


Sub Sector INDUSTRIAL ELECTRONICS
Job Area ELECTRONIC EQUIPMENT & APPLIANCE INSTALLATION AND TROUBLESHOOTING
Level TWO (2)

CU Title CU Code CU Descriptor CU Work Activities Performance Criteria


1. Electronic schematic Electronic schematic drawing is 1. Identify electronic schematic 1.1 Schematic drawing is
drawing one of the basic types of electronic drawing requirements interpreted
design diagrams that can either be 1.2 Drawing instrument and
produced manually by hand or materials determined
using drawing application 1.3 Schematic drawing techniques
software. By being competent in determined
this Competency Unit, the 1.4 Schematic drawing symbols
personnel will be able to identify determined
the basic electronics components,
symbols and circuit diagrams. The 2. Prepare electronic schematic 2.1 Drawing activities listed
drawing will be according to drawing requirements 2.2 Drawing techniques confirmed
design specification. The 2.3 Drawing elements confirmed
personnel who are competent in 2.4 Electronic schematic drawing
electronic schematic drawing shall tools selected
be able to identify electronic
schematic design drawing 3. Perform electronic schematic 3.1 Electronic schematic drawing
requirements, produce schematic drawing produced in accordance with
drawing and confirm drawing design requirement
approval. 3.2 Drawing dimensions
confirmed
3.3 Drawing comparison and
dimension checked against
design specification
3.4 Drawing quality and accuracy
inspected

4. Submit electronic schematic 4.1 Drawing submitted to superior


drawing 4.2 Drawing errors rectified

2. Instrument and test Instrument and test equipment set 1. Identify instrument and test 1.1 Manual for set up & handling
equipment set up & up & handling consists of activities equipment set up & procedures is obtained
2
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
handling pertaining to instrument and test handling requirements 1.2 Safety & precaution measures
equipment set up and operating identified
procedures according to 1.3 Instrument and test equipment
manufacturer’s manual and location identified
specification. The personnel who 1.4 Instrument and test equipment
are competent in instrument and confirmed
test equipment set up & handling 1.5 Instrument and test equipment
shall be able to identify instrument functionality determined
and test equipment functionality,
interpret set up & handling 2. Prepare for instrument and 2.1 Set up & handling tools and
instruction manual, set up test equipment set up & materials listed
instrument & test equipment, check handling activities 2.2 List of relevant safety and
validity of instrument & test precaution measures are
equipment and obtain superior determined
approval. 2.3 Instrument and test
equipment location identified
2.4 Power source availability
confirmed
2.5 Test specification to be set
confirmed
2.6 Set up procedures confirmed
2.7 Checklist obtained
2.8 Checklist interpreted

3. Set up instrument & test 3.1 Set up & handling location


equipment and layout confirmed
3.2 Electrical loading
documentation produced
3.3 Set up & handling checklist
obtained
3.4 Instrument & test equipment
assembled according to set up
& handling instruction
3.5 Instrument & test equipment
connected to the power
source

3
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
3.6 Required safety standard
confirmed
3.7 Test specification to be set
listed
3.7 Instrument & test equipment
inspected
3.8 Instrument & test equipment
functionality confirmed
3.9 Set up checklist completed

4. Perform recording & tagging of 4.1 Instrument and test equipment


instrument & test equipment 4.2 Handling procedures
confirmed
4.3 Recording & tagging
procedures identified
4.4 Instrument & test equipment
tagging details recorded
4.5 Validity of instrument & test
equipment checked
4.6 Set up & handling is confirmed
to be according to customer’s
specification
4.7 Customer’s acknowledgement
obtained

5. Report instrument & test 5.1 Instrument and test equipment


equipment set up and set up & handling issues
handling activities identified
5.2 Set up & handling report
produced
5.3 Up & handling report
acknowledged by superior

4
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
3. Industrial electronic Industrial electronic equipment 1. Identify industrial electronic 1.1 Industrial electronic equipment
equipment installation installation is to carry out industry equipment installation specification determined
equipment according to requirements 1.2 Industrial electronic
manufacturer’s manual and equipment location
specification. The personnel who determined
are competent in electronic 1.3 Documentation of the
appliance shall be able to identify 1.4 installation is collected
industrial electronic equipment 1.5 Installation tools listed
installation, carry out industrial 1.6 Software for installation listed
electronic equipment assembly,
inspect industrial electronic 2.1 Installation location and
equipment installation as per 2. Install industrial electronic layout confirmed
specification and recommend equipment 2.2 Electrical power source
installation procedures confirmed
2.3 Electrical loading
documentation produced
2.4 Installation manual interpreted
2.5 Industrial electronic
equipment installed according
to specification
2.6 Industrial electronic equipment
functionality testing
procedures confirmed
2.7 Industrial electronic equipment
functionality confirmed
2.8 Installation checklist
completed

3.1 Industrial electronic


equipment installation issues
3. Confirm customer acceptance resolved
3.2 Customer feedback obtained
3.3 Customer feedback
confirmed
4.1 Report format confirmed
4.2 Report content confirmed

5
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4. Report industrial electronic 4.3 Submission procedures
equipment installation confirmed
activities 4.4 Report submitted to superior
for approval and
acknowledgment

6
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
4. Instrument and test Instrument and test equipment 1. Identify the instrument and 1.1 Instrument and test equipment
equipment troubleshooting troubleshooting is to carry out test equipment to be inspected confirmed
instrument troubleshooting troubleshooting requirements 1.2 Instrument and test equipment
according to manufacturer’s fault confirmed
manual and specification. The 1.3 Instrument and test equipment
personnel who are competent in troubleshooting tools and
Instrument and test equipment parts listed
troubleshooting shall be able to 1.4 Instrument and test
identify troubleshooting of equipment troubleshooting
instrument and test equipment, and manual identified
carry out instrument and test 1.5 Location for troubleshooting
equipment functionality, set up job confirmed
instrument and test equipment
functionality and produce 2. Prepare troubleshooting 2.1 Location for troubleshooting
equipment troubleshooting report. requirements work prepared
2.2 Faulty detection procedures
obtained
2.3 Faulty detection procedures
interpreted
2.4 Safety and precaution
procedure confirmed

3. Perform troubleshooting on 3.1 Instrument and test equipment


equipment fault confirmed
3.2 Instrument and test equipment
fault diagnosed
3.3 Instrument and test equipment
fault resolved
3.4 Equipment functionality
tested
3.5 Equipment performance
confirmed

4. Set up the Instrument and 4.1 Dummy product instrument set


Test equipment for dummy up procedures confirmed
product

7
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria

5. Produce equipment
troubleshooting report

5. Industrial electronic Industrial equipment 1. Identify the industrial 1.1 Industrial electronic
equipment troubleshooting troubleshooting is to carry out electronic equipment equipment to be inspected
industry equipment troubleshooting requirements confirmed
troubleshooting according to 1.2 Industrial electronic
manufacturer’s manual and equipment fault determined
specification. The personnel who 1.3 Industrial electronic
are competent in industrial equipment troubleshooting
electronic equipment shall be able tools and parts listed
to identify troubleshooting of 1.4 Industrial electronic
industrial electronic equipment, equipment troubleshooting
carry out industrial electronic and manual identified
equipment functionality, and 1.5 Location for troubleshooting
inspect the industrial electronic job confirmed
equipment working operation as
per specification and record 2. Prepare troubleshooting 2.1 Location for troubleshooting
industrial electronic equipment requirements work prepared
faulty. 2.2 Faulty mapping manual

8
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
obtained
2.3 Faulty mapping manual
interpreted
2.4 Safety and precaution
procedure confirmed

3. Perform troubleshooting on 3.1 Industrial electronic


equipment equipment fault confirmed
3.2 industrial electronic equipment
fault diagnosed
3.3 Industrial electronic
equipment fault resolved
3.4 Equipment functionality
tested
3.5 Equipment functionality
confirmed

4. Report equipment industrial 4.1 Equipment troubleshooting


electronic equipment issue highlighted
troubleshooting 4.2 Report format and content
confirmed
4.3 Report submitted to superior
for approval and
acknowledgement

6. Electronic appliance Electronic appliance installation 1. Identify electronic appliance 1.1 Electronic appliance
installation consists of activities pertaining to installation requirements specification determined
appliances installation according to 1.2 Electronic appliance location
manufacturer’s manual and determined
specification. The personnel who 1.3 Documentation of the
are competent in electronic installation is collected
appliance shall be able to identify Installation tools listed
electronic appliances installation, , 1.4 Software for installation
test electronic appliances Listed
functionality and produce electronic 1.5 Installation location and

9
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
appliance installation report layout confirmed

2. Prepare electronic appliance 2.1 Electrical power source


installation requirements confirmed
2.2 Electrical loading
documentation produced
2.3 Installation manual
interpreted

3. Install electronic appliance 3.1 Electronic appliance installed


according to specification
3.2 Electronic appliance
functionality testing
procedures confirmed
3.3 Electronic appliance
functionality confirmed
3.4 Installation checklist
completed

4. Confirm customer 4.1 Electronic appliance


acceptance installation issues highlighted
4.2 Customer feedback obtained

5. Report electronic 5.1 Report format confirmed


appliance installation 5.2 Report content confirmed
activities 5.3 Submission procedures
confirmed
5.4 Report submitted to superior
for approval and
acknowledgment
7. Electronic appliances Electronic appliances 1. Identify the electronic 1.1 Electronic appliance to be
troubleshooting troubleshooting consist of appliance to be inspected inspected confirmed
electronic appliances 1.2 Electronic appliance fault
troubleshooting activities that are obtained
performed according to 1.3 Electronic appliance
manufacturer’s manual and troubleshooting tools and

10
CU Title CU Code CU Descriptor CU Work Activities Performance Criteria
specification. The personnel who parts listed
are competent in electronic 1.4 Electronic appliance
appliances troubleshooting shall troubleshooting and manual
be able to identify troubleshooting identified
of electronic appliances, carry out 1.5 Location for troubleshooting
electronic appliance functionality, job confirmed
testing electronic appliance
functionality and prepare 2. Prepare troubleshooting 2.1 Location for troubleshooting
electronic appliances requirements work prepared
troubleshooting report. 2.2 Faulty mapping manual
obtained
2.3 Faulty mapping manual
interpreted
2.4 Safety and precaution
procedure confirmed

3. Perform troubleshooting on 3.1 Electronic appliance fault


equipment confirmed
3.2 Electronic appliance fault
diagnosed
3.3 Electronic appliance fault
resolved
3.4 Equipment performance
tested
3.5 Equipment performance
confirmed

4. Report equipment 4.1 Equipment troubleshooting


troubleshooting activities issue highlighted
4.2 Report format and content
confirmed
4.3 Report submitted to superior
for approval &
acknowledgement

11
12

You might also like