Quotation No.: DM-2016-107
QUOTATION FOR SJS PUMPS in EURO (SJS)
RIG SAFE SKID, PSS-621B DOUBLE PUMP
|ACDIZINGTING UNIT, W/C15 ENGINE,
14700 OFS TRANS., TPD600 PUMP, 20BBL 678,500.00 | 2,035,500.00
DISPLACEMENT TANK, STAINLESS, FMC.
ORIGINAL TREATING IRONS
ISPARE PARTS FOR PSS-620B SKID FOR
JONE YEAR
16,500.00 49,500.00
OPTIONAL: Remote Control System ( Used +7,800.00| 17,800.00
Hor 3 units)
IBCS-300-100A ACIDIZING BATCH MIXER,
IWIC9 ENGINE, STAINLESS TANKS. Se eee
ISPARE PARTS FOR BCS 300 SKID 2,500.00 2,500.00
PNS-180K NITROGEN PUMPING
SKID, W/C15 ENGINE,3-GUPD PUMP, 180K
POT VAPORIZER. FMC ORIGINAL
[TREATING RIONS
386,000.00| — 386,000.00
ISPARE PARTS FOR PNS-180K SKID 15,800.00 15,800.00
SKID MOUNTED NITROGEN TANK, 2000GA\ 28,500.00 28,500.00
5 |DATA VAN 328,000.00] 328,000.00
[TOTAL EXW VALUE OF ALL UNITS
20% Prepayment by TT| 615,280.00
The 80% Remaining Value Due Paid by LIC 2,461,120.00
The Cost for 2-year Irrevocable Usance LIC | 519,281.40
[Total LIC Value, FOB TJ/SH Seaport, China | 2,980,401.40Notes
The quotation is FOB Tianjin or Shanghai, China (accoding to INCOTERMS 2010), and the
validity is 30 days.
2 Payment and Delivery
The buyer should pay 20% of the contract value by T/T against the signing of the contract as
2.1. prepayment. The remaining contract value should be paid by Irrevocable Usance L/C with 2
Years in favor of the Seller.
2.2 Buyer should open the L/C within one month after signing the agreement.
2.3. Paymet Transfer to Kunlun Bank in China.
2.4 The Delivery Time is 45-100 days to Tianjin or Shanghai Seaport after receiving the prepaymet.
3 The above quotation excludes any Bank Guarantee. If the client need it, the cost will be added.
4 The buyer should be responsible for the customs clearances in Iran.