Symptom
You set up the S4HANA system following the green field approach (no migration from ERP or sFIN system)
and you want to set up the Material Ledger (ML) functionality from the scratch.
In the case of migration/transition from ERP to S4HANA check the following notes:
2337383 - Material Ledger Obligatory for Material Valuation (upgrade from S/4HANA 1511 to S/4HANA 1610)
Other Terms
Mateiral Ledger customizing, Material Ledger production startup, S4HANA green field approach
Material Ledger is mandatory in S4HANA. In this note we describe the prerequisites, and all steps to
configure and set up Material Ledger.
Solution
Set up of the Material Ledger must be in sync with the General Ledger set up and the Currency and Valuation
Profile.
Prerequisites:
Therefore, before you set up the Material Ledger execute the following steps, exactly in this order:
1) [OPTIONAL] Only, in the case you want to use valuations 1 - Group Valuation and/or 2- Profit Center
Valuation, set up correctly Currency and Valuation Profile in SAP Customizing Implementation Guide-
>Controlling->General Controlling->Multiple Valuation Approaches/Transfer Prices->Basic Settings->Maintain
Currency and Valuation Profile and assign it to the controlling area in Customizing Implementation Guide-
>Controlling->General Controlling->Multiple Valuation Approaches/Transfer Prices->Basic Settings->Assign
Currency and Valuation Profile to Controlling Area. Also check the follow up customizing settings in SAP
Customizing Implementation Guide->Controlling->General Controlling->Multiple Valuation
Approaches/Transfer Prices->Basic Settings.
2) Set up the Currencies in Universal Journal as described in the note 2344012. Please consider that, ML
currencies can be only in the first four columns of the Universal Journal (H, K, O, V). Starting from
OP1809(S4CORE 103) it is possible to have ML currencies in all columns of the Universal Journal.
4) [OPTIONAL] If you intend to use Material Ledger Actual Costing, then it should be activated it before
setting the Material Ledger productive. Please follow the customizing path SAP Customizing Implementation
Guide-->Controlling->Actual Costing/Material Ledger->Actual Costing->Activate Actual Costing. If you decide
to activate the Actual Costing at later point of time, then you will need to do it by transaction run
FCML4H_STARTUP (Set ML Actual Costing as Productive (retroactively). Please check the note 2395913.
5) [OPTIONAL] If you intend to activate Actual Cost Component Split, then it should be activated before
setting Material Ledger productive as well. Please follow the customizing path SAP Customizing
Implementation Guide-->Controlling->Actual Costing/Material Ledger->Actual Costing-> Activate Actual Cost
Component Split.
6) Now you can set up the Material Ledger productive. SAP Menu->Logistics->Materials Management-
>Valuation->Actual Costing/Material Ledger->Enviroment->Production Startup->Set Valuation Areas as
Productive or transaction CKMSTART. All material master data will be created and the final check of the
currencies will be carried out. The connection between ML relevant currencies (CURTPs) of one company
code and the ledger/currency set up on the other side will be defined and frozen. Please be aware, that once
the valuation areas are set productive, you cannot change ledger/company code assignement in General
Ledger. If there is a necessity to do so, check the note 2512618 - Cases when to deactivate Material Ledger
and carry out new productive start in order to see whether your case is applicable.
Additional Information:
Technical simplification within ML has been carried out in S4HANA. More information are to be found in the
notes:
Software Components
2553586 S/4HANA: error MLCCS009 or C+099 or missing cost component split data in table MLDOCCCS
2426246 MLCCS003 or OMX3: error with currency type 31, ML currency type but not FI currency type
2512618 Cases when to deactivate Material Ledger and carry out new productive start
2337383 S4TWL - Material Valuation Data Model Simplification in S/4HANA 1610 and Higher
2553586 S/4HANA: error MLCCS009 or C+099 or missing cost component split data in table MLDOCCCS