SkyEdgel |c
26/ 3G Acceptance Test Procedure (ATP)
” Customer _ IPT
Release Number: DC001342(D)
Gilat Satellite Networks- MARCH: 2020
‘a Sete Neck | Codon an Prepay emsknContents
Introduction .
Prerequisites
Test Coniguration,
Test Pitosopty. -
Successful Call between a Mobile Telephone and PSTN Telephone
Successful Call between two Mobile Telephones
RNCIBSC Communications Recovery...
ATP Approvals
Final Aporval
(lo Sate wa | Coton rd Poser ntmaion |Introduction
By THSATP cat be used for both 26 and 36 networks For 26
networks, the components are BSCat the Hub side and BTS at th
remote site. For 3G networks, the components are RNC at the H
side and Node # at the remote site.
The customer is responsible to supply a 26/36 network, cont
and the PSTN
1 The 26/36 network should be enabled to work with Satellite delay on the A-bis
Interface
1m Specific tests in this ATP require the customer to supply equipment (phones, SIM
‘ards, PCs, applications, switches, servers, ports, ete) in order for these tests to be
carried out. Failure to supply this equipment will prevent these tests from being,
perform
1 A2G/2G service engineer who is familiar with 26/36 over Satellite must he present
luring the integration and testing pracess. The engineer must be capable of “tuning”
the BTS/ Node configuration. It should he noted that fremote-controlled
configuration of the BTS/ NodeB isnot passible, the engineer may be required to
travel to remote BTS, Nadel sites in order to periorm such configuration
Ifthe ATP includes customer specific applications, they must be pre-tested to verify
‘that they can be run over the satelite link.
ted tothe Internet
“This document details the Acceptance Test Procedure (ATP) for testing the 26/36
‘Remote Site installation. It also serves to record the Acceptance Test Results
(ATR),
‘The ATP describes the test procedures in a general manner, and not necessarily as
detailed step-by-step procedures. These tests must be performed by
knowledgeable and experienced technical personnel
Testing will ake place upon completion ofthe remote site inst
will include formal remote site service testing, These tests verif
communications is properly established.
The tests contained inthis document constitute the ATP. These tests must be
‘witnessed by the customer, Results will be summarized and a punch ist
‘generated (ifnecessary) upon completion ofthe testing, The result section of
‘each test is a surmmary of the major results and is to be signed both by the
customer and tester.
ion, This tes
that end-tovend
(la Sete Nets | Crk nd Popes oman |Prerequisites
The co-located Node B/BTS should work terrestrially with the RNC/BSC prior
to starting the ATP. As part ofthe prerequisites for the ATP, these
componenits should be conmected through a delay simulator and it should be
verified that calls and SMSs are received and transmitted properly with a
delay ot up to 850msec.
All the NODE B/BTS stations that will be working through the SkyEdgell-c
system should reside within a separate “Location Area Code" (LAC) that will
not include any terrestrial, microwave, or other NODE B/BTSs. The reason is
due to the paging process, which should be using different timers ifthe NODE
2/BTS is terrestrial, microwave, satellite or other.
12 Git Sutaie Netacrhs | Conde and ProptaryIntrmationTest Configuration
‘The system and protocol parameters are set as expected in the operational
network according to the Sizing Spreadsheet. If Technical Support personnel
determine that some parameter changes are required or, if the Sizing Spreadsheet
is not available, they will perform the necessary changes at the site. A diagram of
the network is shown in the figure below.
Figure 1: 26/3G over SEll-c Network Diagram
‘The mobile telephones referred ton this drawing are configured to
BE communicate as fallows:
Test Philosophy
‘The philosophy ofthis ATP is to test critical functions in an operational
environment. Thus, “artificial” configurations are not used. The ATP is intended to
be carried out by a knowledgeable tester with specific details explained to a
customer witness as necessary. Itis suggested that the Gilat test director maintain
the “official” copy of the ATP document and that all parties involved initial any
changes made,
a For all procedures in this ATP, both the Gilat and customer
representatives should initial each test result in the form for
cach test procedure,
The ATP will be performed after the final configuration of
the network.
Git Sate Netverks | Corddenl and PropietaryInomaton | 3Successful Call between a Mobile Telephone and
PSTN Telephone
Purpose
‘To verify that telephone calls can be successfully completed between a mobile
telephone and PSTN telephone in both directions.
Test Procedure
26/36,
Test Steps ‘Success Criteria Fait
1. | Make a telephone call from | The telephone call is
Mobile telephone Tlocated | successfully completed.
behind the VSAT toa PSTN “
telephone number located at
the hub site,
2, | Makea telephone call froma | The telephone call is
PSTN telephone number successfully completed.
located at the hub site to Mobile
telephone 1 located behind the
[ ¥sar. I I |
Satie Newer | Condetal and Prec ntermatinSuccessful Call between two Mobile Telephones
Purpose
‘Ta verify that telephone calls can be successfully completed between two mobile
telephones either on the same NODE B/BTS or between a NODE B/BTS telephone
and a non-NODE B/BTS telephone.
Test Procedure
26/36
No.
Test Steps ‘Success Criteria
| Make a telephone call from | The telephone call is
Mobile telephane 1 to Mobile | successfully completed.
telephone 3,
I ianvwipuarancan | pemopam mur
Motictccthone SteMobile | succetaly competed
tnephone
Make atelephone call from | The telephone call is
Mobile telephone 1 to Mobile | successfully completed.
telephone 2,
lat Satete Netw | Confidential and Propitary Iniomaton | §SMS Transfer
Purpose
To verify that SMS transfers can be successfully completed between two mobile
telephones
Test Procedure
her on the same NODE B/BTS or between a NODE B/BTS telephone
and a non-NODEB/BTS telephone
telephone 3. Repeat an
additional two times.
26/36
No. Test Steps Success Criteria | Pass | Fail
1, | Send an SMS from Mobile ‘The 3 SMSs are successfully
| telephone 1 to Mobile received without any errors. |“
Send an SMS from Mobi
telephone 3 to Mobile
telephone 1. Repeat an
additional two times.
‘The 3 SMSs are successfully
received without any errors.
Send an SMS from Mobile
telephone 1 to Mobile
telephone 2. Repeat an
additional two times.
‘The 3 SMSs are successfully
received without any errors.
Gilat Stee Networks | Conidertl and Proprietary riormasnNode B/BTS Communications Recovery
Purpose
‘To demonstrate that the communication connectivity of the Node B/BTS can be
restored after the connection between the Node B/BTS and VSAT is disconnected
and then reconnected.
Test Procedure 26/36
No. Test Steps Success Criteria Pass | Fail
1. | Makeatelephone call from | The telephone cal is,
Mobile telephone 1 to Mobile | successfully completed. a
telephone 3,
2. | Disconnect the LAN cahle from | The telephone call cannot he
the rear ofthe VSAT and then | completed. |
attempt to make a telephone |
call from Mobile telephone 1 to
Mobile telephone 3,
-
3, | Reconnect the LAN cableand | The telephone calls, |
tmakea telephone call from | successfully completed. | y-~
Mobile telephone 1 to Mobile
telephone 3
(Gl Seite Netwrks | Conder and Propet Intmaton | 7RNC/BSC Communications Recovery
Purpose
ro demonstrate thatthe communication connectivity ofthe RNC/BSC can be
Testored after the connection between the RNC/BSC and SkyFdgel-c Hub is
tlisconnected and then reconnected.
Test Procedure 26/6
No. | Test Stops: ‘Success Criteria Pass | Fail
| Makea telephone callfrom | The telephone call is
Mabie telephone to Mobile | successfully completed. |
telephone 5.
> | Disconnect the cable herween | The telephene call eannnt he
the RNC/ESC and SkyEdgeti-c | completed
| band then attempt to make
| atelephor li from Mobile “
telephone 1 to Motile
telephone 3,
3. | Reconnect the cable and makea | The telephone callis
|e | sey ome “
telephone 2
be a Termmnol
- 3G Speedtests* 756 Mbps / O44 Mbps Hvawer Mates
55H Mips / 106 Mbps Semury ate 4
= RTP Server UL: 05 Nby TEMS Pocket
| rs Same SF
Se realizaron pruebas de serveto came Facebook, yootebe,
whatsapp, descarga ob aplicacion sin proslemas
Gla Sabie New | Cored tray omanATP Approvals
This section should be completed after all ofthe testing in this document has been
successfully completed.
Ifthe ATP was completed with exceptions, these exceptions should be listed and
attached to this document and the provisional approval should be signed.
If the ATP was completed entirely without exceptions, the final approval should be
signed.
Provisional Approval
Attach a list with the description of the exceptions initialed by hath parties
Representative Signatyrey Date
aman pie 0/03 howe
ad | roles pxw
Representative
4A Jole3/ 2020
‘The SkyBdgell-c and Sky-Ahis hub and VSAT operate according to the
specifications.
Gilat
Representative
y. Uilorner
Lepreien Biive
Final Approval
Representative Name Signature | Date
reaanive | el Arp v2foshoro
7 | of E
iepresettadre Tp Adke ‘cle ropes how
Jo/03,] 2020
Chervacton
- El marca SCP sttlads es el gue se frabeoba a le fecha de la
Firma oel AIP. Se debe con siderar que se Tench un rweve marcady
DSC pesteriormente
‘Gl Sie Netwerks | Conde and rota ntornaton |