= (11.8 x 11.8 x 2.6) = 362.024 m3 = 3.620 x 1011 mm3
VCONC = VPEDESTAL + VFOOTING + VSTUMP
= (1 x 1 x 3 x 4) + (0.8 x 0.3 x 2.2) + (11.8 x 11.8 x 0.7) + (2 x 2 x 0.3 x 2) = 112.396 m3= 1.124 x 1011 mm3 VBACKFILL = VEXCCAVATION - VCONC = 362.024 m3- 112.396 m3 = 249.628 m3 = 2.496 x 1011 mm3