You are on page 1of 3

Note: 1) Enter length and width in feet only.

Size of Plot
2) change construction rate.
3) change Material Quantity Area of Plot
Construction Cost
Building Construction Cost
S. No. (Material) % Amount
1 Cement 12.8 96000
2 Steel 11 84375
3 Sand 6.2 46800
4 Gravel 4 30375
Finishing
Color
5 10 77430
Tiles
Bricks
Fittings
Windows
6 Doors 8 60000
Plumbing
Electrical
Sanitary
Material Cost 53 394980
Labour Cost 37 280020
Engineers/architect 10 75000
Total Construction Cost ₹ 750,000
Length Width Construction Rate Normal Quality
25 30 ft Rate per Sq. ft. 1000
750 Sq. ft
750,000 ₹
Building Construction Materials
S.No. Material Qty Rate
0.4 1 Cement (Bags) 300 320
2.5 2 Steel (Kg) 1875 45
1.2 3 Sand (Cu.ft.) 900 52
1.35 4 Gravel (Cu. ft.) 1012.5 30
7.32 5 Bricks (Nos.) 5,490 7
0.7 6 Tiles (Sq. ft.) 525 40
0.12 7 Color (Liters) 90 200
Total Cost

For changing construction rate and materail rate make


100 Rs. Goople Pay or BHIM App on this number
8905904345 and to receive passoword Send Text Msg to
same number like "I have Paid for Password"
77430

n Materials
Amount
96000
84375
46800
30375
38430
21000
18000
334,980 ₹