RFX 1000000493 October 26, 2020
TABLE OF CONTENTS
1. TENDER SECURITY ..................................................................................................................................... 1
2. GO SOLAR SYSTEMS LEGAL DOCUMENTS................................................................................................... 2
CERTIFICATE OF INCORPORATION ....................................................................................................................2
TAX COMPLIANCE CERTIFICATE ........................................................................................................................2
PIN REGISTRATION CERTIFICATE ......................................................................................................................2
CR12..................................................................................................................................................................2
ID OF DIRECTORS ..............................................................................................................................................2
BUSINESS PERMIT .............................................................................................................................................2
3. POWER OF ATTORNEY ............................................................................................................................... 3
4. FILLED TENDER FORMS .............................................................................................................................. 4
LETTER OF APPLICATION ..................................................................................................................................4
FORM OF TENDER .............................................................................................................................................4
TENDER QUESTIONNAIRE .................................................................................................................................4
DECLARATION FORM ........................................................................................................................................4
CONFIDENTIAL BUSINESS QUESTIONNAIRE .....................................................................................................4
5. MANUFACTURERS DRAWINGS AND SPECIFICATIONS ................................................................................ 5
30M HIGH MAST AND FOUNDATION DRAWINGS ............................................................................................5
10M CONCRETE POLE DRAWING......................................................................................................................5
6. MANUFACTURERS CATALOGUES /BROCHURES.......................................................................................... 6
280W LED FLOODLIGHT ....................................................................................................................................6
150W LED STREETLIGHT ...................................................................................................................................6
30M HIGH MAST ...............................................................................................................................................6
10M CONCRETE POLE .......................................................................................................................................6
100W SOLAR STREETLIGHTS .............................................................................................................................6
7. DETAILED MOBILIZATION PLAN ................................................................................................................. 7
8. DETAILED WORK PROGRAMME ................................................................................................................. 8
9. CV’S AND CERTIFICATES OF KEY PERSONNEL.............................................................................................. 9
SUPERVISOR .....................................................................................................................................................9
TECHNICIANS-C1 ...............................................................................................................................................9
TECHNICIANS-T3 ...............................................................................................................................................9
10. AUDITED REPORTS................................................................................................................................... 10
11. MANUFACTURERS AUTHORIZATION LETTERS .......................................................................................... 11
12. MANUFACTURERS WARRANTY LETTERS .................................................................................................. 12
13. MANUFACTURERS CONTACT DETAILS ...................................................................................................... 13
14. LPO’S –SIMILAR ON GOING WORKS ......................................................................................................... 14
15. LPO’S COMPLETION CERTIFICATES OF SIMILAR WORKS ........................................................................... 15
16. CONFIRMATION OF BUSINESS PREMISE/ WORKSHOP ............................................................................. 16
17. RELEVANT TOOLS AND EQUIPMENT OWNED/LEASED.............................................................................. 17
18. VALID EPRA LICENSE-CLASS C1 AND CLASS V1.......................................................................................... 18
20. ISO CERTIFICATES-14001:2015/LOCAL MANUFACTURERS ENVIRONMENTAL POLICY/NEMA .................... 20
21. MANUFACTURERS ISO CERTIFICATES-9001:2015/VALID STANDARDIZATION MARK CERTIFICATE ............ 21
22. GO SOLAR HEALTH AND SAFETY PROGRAM ............................................................................................. 22
2
1. TENDER SECURITY
1|Page
3
4
2. GO SOLAR SYSTEMS LEGAL DOCUMENTS
CERTIFICATE OF INCORPORATION
CR12
ID OF DIRECTORS
BUSINESS PERMIT
2|Page
5
6
For General Tax Questions
Contact KRA Call Centre
PIN Certificate Tel: +254 (020) 4999 999
Cell: +254(0711)099 999
Email: callcentre@kra.go.ke
www.kra.go.ke
This is to certify that taxpayer shown herein has been registered with Kenya Revenue Authority
Taxpayer Information
Taxpayer Name GO SOLAR SYSTEMS LIMITED
Email Address ACCOUNTS@GOSOLARLTD.COM
Registered Address
L.R. Number : Building : SOUTHGATE CENTRE
Street/Road : SOUTH B City/Town : NAIROBI CITY (SOUTH)
County : Nairobi District : Nairobi East District
Tax Area : Nairobi East Station : East of Nairobi
P. O. Box : 74231 Postal Code : 00200
The above PIN must appear on all your tax invoices and correspondences with Kenya Revenue Authority. Your
accounting end month is December unless a change has been approved by the Commissioner-Domestic Taxes
Department. The status of Tax Obligation(s) with 'Dormant’ status will automatically change to 'Active' on date
mentioned in "Effective Till Date" or any transaction done during the period. This certificate shall remain in force
till further updated.
Disclaimer : This is a system generated certificate and does not require signature.
7
For General Tax Questions
Tax Compliance Certificate Contact KRA Call Centre
Tel: +254 (020) 4999 999
Cell: +254(0711)099 999
Email: callcentre@kra.go.ke
www.kra.go.ke
This certificate is issued on the basis of information available with the authority as at the
Caveat certificate date mentioned above. The Authority reserves the right to withdraw the
certificate if new evidence materially alters the tax compliance status of the
Disclaimer : This certificate is system Generated and therefore does not require signature.You may confirm validity of this certificate on the
iTax Portal by using the TCC Checker.
8
BUSINESS REGISTRATION SERVICE
P. O. BOX 30031
NAIROBI
9 SEP 2020
To
GEORGE NDUATI KIBE
P.O. Box 74231
00200 - CITY SQUARE
Name of Directors and Shareholders of the above company with their particular are as follows
Yours Faithfully,
REGISTRAR OF COMPANIES
REF NO: OS-8RF77DPP
DISCLAIMER: THIS IS A SYSTEM GENERATED CERTIFICATE AND DOES NOT REQUIRE A SIGNATURE
9
10
NAIROBI CITY COUNTY
SINGLE BUSINESS PERMIT
Effective Date 1st January 2020
Duration 12 Months
Business under this permit shall be conducted at the address as indicated below
Notice: It is an offence to give false information. Granting this permit does not exempt the business identified above from
complying and any other relevant laws and regulations as established by the Government of Kenya and Nairobi City County
11
3. POWER OF ATTORNEY
3|Page
12
13TH OCT
13
POWER OF ATTORNEY
THIS POWER OF ATTORNEY made this 13TH day of OCTOBER 2020 by GO SOLAR
SYSTEMS LIMITED, a duly registered Company incorporated in the Republic of Kenya and
having its registered office at Ashray Industrial Park, Kampala Road, Nairobi and whose postal
address is Post Office Box Number 74231-00200, Nairobi (herein called “the Company)
WITNESSETH as follows:-
1. The Company HEREBY appoints GEORGE NDUATI KIBE of Post Office Box
Number 74231-00200 Nairobi (herein called “the Attorney ”) to be the Attorney of the
Company for the purposes of negotiating, preparing, signing and varying (if necessary)
the technical and financial proposals, either in the Companys’ name or in his own names
and to execute documents of every description relating to the Tender SUPPLY,
INSTALLATION, TESTING & COMMISSIONING OF HIGHMAST FLOOD
LIGHTS, LOW MAST FLOODLIGHTS, GRID CONNECTED STREET LIGHTS
AND SOLAR STREET LIGHTS IN TURKANA EAST CONSTITUENCY, KILIFI
SOUTH CONSTITUENCY AND EMBAKASI SOUTH CONSTITUENCY, which
the Company may be required to execute.
-2-
14
15
RFX 1000000493 October 26, 2020
FORM OF TENDER
TENDER QUESTIONNAIRE
DECLARATION FORM
4|Page
16
LETTER OF APPLICATION
2. We agree to abide by this Tender including all the terms for a period of……….…150 days
(Candidate please indicate validity of your tender) from the date fixed for tender opening
as per the tender Document, it shall remain binding upon us and may be accepted at any
time before the expiration of that period.
3. We declare that we have read and understood requirements of Clause 17 and 18 on
Creation, Submission, modifications and withdrawal of Bids, and shall abide by this
requirement and any deviation from this section shall lead to disqualification and
REREC is not to blame
3. This application, together with your written appointment thereof, shall not constitute a
contract between us nor commit REREC to any actual tender or amount of contract.
4. We understand that you are not bound to accept any application you may receive.
5. We declare that the statements made and the information provided in our prequalification
tender document are complete, true, and correct in every detail.
Yours sincerely,
Name of Candidate________________________
GO SOLAR SYSTEMS LTD.
NOTES:-
17
FORM OF TENDER
Dear Sir,
1. In accordance with the Conditions of Contract, Specifications, Drawings and Bills of Quantities
for the execution of the above named Works, we, the undersigned offer to Supply, Construct,
Install and Complete such Works and remedy any defects therein for the sum of
26,955,652.00
Kshs._____________________________ [Amount in figures]Kenya Shillings ___
TWENTY SIX MILLION NINE HUNDRED FIFFTY FIVE THOUSAND,
_______________________________________________________[Amount in words]
SIX FIFFTY TWO ONLY
2. We undertake, if our tender is accepted, to commence the Works as soon as is reasonably
possible after the receipt of the Project Manager’s notice to commence, and to complete the
whole of the Works comprised in the Contract within the time stated in the Appendix to
Conditions of Contract.
4. Unless and until a formal Agreement is prepared and executed this tender together with your
written acceptance thereof, shall constitute a binding Contract between us.
5. We understand that you are not bound to accept the lowest or any tender you may receive.
27TH day of ________________20_________
Dated this ________ OCTOBER 20
Witness; Name_____________________________________
GRACE MUE
Address____________________________________
74231-00200
Signature___________________________________
Date_______________________________________
27/10/20
Page 86 of 96
18
TENDER QUESTIONNAIRE
Full address of tenderer to which tender correspondence is to be sent (unless an agent has been
74231-00200 ASHRAY INDUSTRIAL PARK-KAMPALA RD. GO DOWN B1
appointed below)…………………………………………………………………………………
Name of tenderer’s representative to be contacted on matters of the tender during the tender
period………….…………………………………………………………………………………
GEORGE NDUATI KIBE
Details of tenderer’s nominated agent (if any) to receive tender notices. This is essential if the
tenderer does not have his registered address in Kenya (name, address, telephone, telex)
………………………………………………………………..……………………….………………
N/A
……………………………………………………………………..………………….………………
_______________________
Signature of Tenderer
19
DECLARATION FORM
Date 27/10/2020
____________________________
To RURAL
_________________________
ELECTRIFICATION AND RENEWABLE ENERGY CORPORATION
HEAD OF PROCUREMENT
Has not been involved in and will not be involved in corrupt and fraudulent practices regarding public
procurement.
DIRECTOR 27/10/20
20
CONFIDENTIAL BUSINESS QUESTIONNAIRE
You are requested to give the particulars indicated in Part 1 and either Part 2 (a), 2 (b) or 2 (c)
and 2 (d) whichever applies to your type of business.
You are advised that it is a serious offence to give false information on this Form.
Part 1 – General
Plot No………………………………………
209/6625 KAMPALA ROAD
Street/Road ……..……………………………..
74231-00200
Postal Address……………………………… Tel No………………………………………….
0722895922 0737 555333
Nature of Business………………………………………………………………….…………..
RETAIL OF SOLAR PANELS , BATTERIES AND ACCESSORIES
Maximum value of business which you can handle at any time: K. pound
……………………………………………………………………………….……….…………..
500,000,000.00
Branch…………………………………………………………………………………………….
INDUSTRIAL AREA
1………………………………………………………………………………………………….
N/A
2………………………………………………………………………………………………….
3………………………………………………………………………………………………….
21
Part 2(c) – Registered Company:
Private or public…………………………………………………………………………….
PRIVATE
Nominal Kshs……………………………………………………………………………….
100,000
Issued Kshs…………………………………………………………………………………
100,000
1.……………………………………………………………………………………………
GEORGE NDUATI KIBE KENYAN 20793146 140
2.……………………………………………………………………………………………
ROBERT NYAMWAYA OMWANDO KENYAN 21756193 140
JACON NJOROGE KIBE KENYAN 24696010 720
3.……………………………………………………………………………………………
4.……………………………………………………………………………………………
27/10/2020
………………………
DIRECTOR ……………………… …………………
(Title) (Signature) (Date)
22
RFX 1000000493 October 26, 2020
5|Page
23
375
10-M36
3200
2000
φ3200
NOTES
4 3 All dimensions to be checked on site and if necessary confirm
with the architect.
700
All LC's within building area, driveway and parking to have
5 5
1800x1800x1500mm
heavy duty, double seal air tight covers and walls to be 200mm
RC stub column 8mm stiffeners to detail All basins,baths and sinks to be fitted with anti-vacuum traps.
8mm stiffeners to detail All fire doors to be one and half hour fire resistant doors.
galvanised mast All plumbing and drainage works to comply with M.0.H.
regulations.
10No,36mm dia anchors 25mm plate
All S&W.V.P to be approved 100mm dia p.v.c pipes encased
3200
1800
Level 3 Level 3 with chicken Mesh and concrete slab on compacted hardcore
to approval.
ground level after backfill
200
Double cross T8-02 links
2000 2 2 2000
All softwood to be cell cured and approved,to be painted
1100mm dia by 25mm and polished.
base plate preset template Plinth level to be minimum 300mm from proposed parking
level of existing ground level.
1500
T12-01 10No,36mm hd bolts anchored to RAIN WATER DISPOSAL.
2000
2000
700
700 700 gutters and 75mm dia p.v.c down pipes in ducts and other
6mm plate ties appropriate accessories all to be painted.
Level 2 Level 2
R.W.D.P to dispose at ground level into 300x300x300 concrete
500 3 3 500 sump,and cement gullies to detail.
NB
500
500
700 1800 700 All concrete used in floors,columns and beams to be strictly
Level 1 16-T16-04@200B1 Level 1 HD bolts to be set loose (1:2:4) mix ratio.
0 3200 0 1800 in concrete and grouted Mortars for bonding to be strictly 1:4 mix ratio.
15-T16-05@200B2 after levelling All marble and granite tiles to be protected from red soil marks
3200 3200 by totally covering with polythene sheeting and to be smooth
finished with machine polish filling all gaps.
Reinforcement elevation Plan view bolt cage elevation All terrazzo to be finished smooth with terrazzo polish to
1 1 : 25
4 1 : 25
6 1 : 25
architects approval.
T8-02@200 links
30m galvanised mast welded
to base plate
Rev Description Date
1800
1800
Detail 2-2
2 1 : 25
3200 Detail 5-5
5 1 : 25
PROJECT
16-T16-05@200 B2
Fabrication and installation of 30m
High mast lighting in Nakuru
16-T16-04@200B1
3200
TITLE
Foundation details
CLIENT
{3D}
7 Go Solar Systems Ltd
02/07/2020 15:07:32
Wilson WK 05/26/20
SCALE (@ A1) PROJECT NUMBER
A101
26
ABM
Holdings Ltd
TO;
RURAL ELECTRIFICATION AND RENEWABLE ENERGY CORPORATION
Ground Floor: Kawi House, South C;
P.O. 34585 – 00100
NAIROBI, KENYA
REA’S REQUIREMENTS
SPECIFICATIONS GSSL. LTD OFFER
a) Pole Size (Metres) 10 10
b) Spiral diameter wire(mm) 3 3
c) Ring bar diameter(mm) 6 6
d) H.S diameter (mm) 5 5
e) No of H.S bar 14 14
f) Spacing of ring bar ( tip to bottom (mm) 500 500
g) Butt diameter (mm) 330 330
h) Average thickness of butt 55 55
..........2020.......
DATED THIS…16TH… DAY OF JUNE .
27
8 7 6 5 4 3 2 1
F F
SECTION E-E
SCALE 1 : 25
F
E 10000 E
A
190
320
E C E
55
Green Colour
C Coding at tip 190 C
DETAIL F
SCALE 1 : 10 End View
Compacted Concrete
F F
Spiral Wire,Ø 3
E E
320
190
D D
C C
55
.0
0
Butt Cross Section
6|Page
31
TECHNICAL DATA SHEET FOR 150W LED LIGHTING
SiliconRubberHousing: Die
cast Aluminium
Aluminium
j) Lifetime 50,000 Hours (70% Lumen Maintenance @ Ta 35°) 50,000 Hours (70% Lumen
Maintenance @ Ta 35°
k) Installation Use of a single Universal Bracket Use of a Universal Bracket
l) Certifications RoHS, CQC, CB & CE RoHS, CQC, CB & CE
m) Surge protection 10kV 10kV
n) Warranty period Minimum 3years 3years
o) Operating -
40° to 45°C e
Temperatures values for outdoor applications)
P) Classification IK07; IP65; Class 1 IK07; IP65; Class 1
a) Optics AWB AWB
32
GUANGDONG DICKEN LIGHTING TECHNOLOGY CO.,LTD ...
Guangdong Dicken Lighting Technology Co. Ltd
Address:Building 5 Jiaohefeng Hardware, Luoxi Bridge, Haizhu District, Guangzhou, Guangdong, China (528419)
Tel: (86 20) 34171167
Fax: (86 20) 34171167
LED Shoebox Light
PL-01-G2(C1) ®
Application
Tunnel light, Sports field, Parking lot, Garden, Residential area,
Landscape, Architectural decorative lighting, Roads and other places.
300mm(11.81") 82mm(3.23")
300mm(11.81") 82mm(3.23")
545.6mm(21.48")
300mm(11.81") 82mm(3.23")
447.7mm(17.626")
349.7mm(13.768")
750.6mm(29.55")
266.7mm(10.5")
652.7mm(25.697")
554.7mm(21.839")
471.7mm(18.57")
Ø64mm(2.52")
Ø64mm(2.52") Ø64mm(2.52")
Ø64mm(2.52")
50W/80W 100W/120W/150W 200W/240W 300W
Photometry
-/+180 -/+180 -/+180 -/+180 -/+180
-150 150 -150 150 -150 150 -150 150 -150 150
-120 120 -120 120 -120 120 -120 120 -120 120
29
C90/270,96.7
0 0
AVERAGE BEAM ANGLE(50%):111.6 DEG AVERAGE BEAM ANGLE(50%):120.9 DEG AVERAGE BEAM ANGLE(50%):96.8 DEG AVERAGE BEAM ANGLE(50%):101.6 DEG AVERAGE BEAM ANGLE(50%):56.2 DEG
1 2
P2 Square Mount
P3 Trunnion P4 Yoke
Packing Spec
Box Carton
Item
Measurement(mm) Gross weight Pcs/box Measurement(mm) Gross weight Pcs/box
BR-PL50W/80W-01-G2-P1/P2/P3/P5 L520*W355*H155 5.6kg 1 / / /
BR-PL300W-01-G2-P4 L615*W355*H155 30
8.6kg 1 / / /
34
Rev 2020-4
DETAILED TECHNICAL SPECIFICATION
REA’S REQUIREMENTS
SPECIFICATIONS BIZRATE'S OFFFER
a) Number of LED Lights 9 9
b) Light Source LED LED
c) Voltage Range/Frequency 220-240V/50Hz 220-240V/50Hz
d) Power factor 0.95 0.95
e) Power consumption 280w 280w
f) Luminous Efficacy(lm/W) 100 150
g) CRI (Color Rendering 75 75
Index)
h) Color Temperature 5700K±500K (cool white)/ 5700K±500K (cool white)/
4000K±500K (neutral white) 4000K±500K (neutral white)
i) Materials and Finishing Glass: Tempered Glass Gasket: Glass: Tempered Glass Gasket:
Heat Resistant Silicon Rubber Heat Resistant Silicon Rubber
Housing: Die-cast Aluminium Housing: Die-cast Aluminium
j) Lifetime 50,000 Hours (70% Lumen 50,000 Hours (70% Lumen
Maintenance @ Ta 35°) Maintenance @ Ta 35°)
k) Installation Use of a Universal Bracket Use of a Universal Bracket
l) Certifications RoHS, CQC, CB & CE RoHS, CQC, CB & CE
m) Surge protection 10kV 10kV
n) Warranty period Minimum 3years 4 years
o) Operating Temperatures -40° to 45°C (Minimum and -40° to 50°C
maximum acceptable values for
outdoor applications)
P) Classification IK07; IP65; Class 1 IK07/10; IP65; Class 1
a) Optics AWB AWB
33 35
GUANGDONG DICKEN LIGHTING TECHNOLOGY CO.,LTD ...
Guangdong Dicken Lighting Technology Co. Ltd
Address:Building 5 Jiaohefeng Hardware, Luoxi Bridge, Haizhu District, Guangzhou, Guangdong, China (528419)
Tel: (86 20) 34171167
Fax: (86 20) 34171167
LED Shoebox Light
CERTIFICATIONS: ROHS,CQC,CB,CE
PL-01-G2(C1) ®
Warranty- 5 years
36 °
36
37
38
TO: The Chief ExecutiveOfficer
Rural Electrification and Renewable Energy Corporation,
P.O. BOX 34585-00100
NAIROBI SOLAR STREET LIGHTS
Bidders
4 SPECIFICATION FOR LED POWER SOURCE
response
39
SPECIFICATION
FOR SOLAR
1
CHARGE
CONTROLLERS
1.2 Main features All series use MPPT controller All series use MPPT controller
1.7 Operating temperature *-30 to 60o C *-30 to 60o C
Charge efficiency Min 20% 40%
1.9 Self-consumption 0.5% (Maximum) of rated current 0.5% (Maximum) of
rated current
Status Indicators Charging and low battery visual Charging and low battery
1.1
(minimum) indicators visual indicators
1.11 Guarantee 5 years 5 years
Bidders
1 SPECIFICATION OF PV MODULES
response
1.16 CE- conformity, DVE GS, TUV quality certified for product CE DVE GS, TUV
1.17 Horizontal and vertical assembly possible Horizontal and
vertical assembly possible
40
High Mechanical load
(acc. IEC 61215 (5400Pa
High Mechanical load (acc. IEC 61215 (5400Pa superimposed load and
1.18 superimposed load and
2400Pa suction load)) 2400Pa suction load))
1.19 Pre-cabled with MC4 Plug –connectors (IP 65) Pre-cabled with MC4 Plug
Nominal power at IEC-Conditions (radiation 1000W/m2, Air-Mass 1.5 180w
1.2
25°C)
1.21 Product certification IEC 61215 (Ed.2) IEC 61215 (Ed.2)
1.22 Protection class II/ IEC 61730 II/ IEC 61730
Salt mist corrosion
1.23 IEC 61701 (Ed. 2) IEC 61701 (Ed. 2)
test
Nominal operating 45 °C +-2 °C
45 °C +-2 °C
1.24 cell
temperature (NOCT)
Documentation:
1.25 Please indicate: English
English
1.28 Power Tolerance Positive power
tolerance -0/+3%
Cell dimension
1.29 (length x width) in 156X156mm
mm
Module dimension
1.3 (length x width x
1956X40X992MM
height) in mm
1.31 Module weight in kg 19kgs
41
www.pboxlighting.com
X5 DUAL
SPECIFICATIONS
2020
IP65 IK08
1588
1358
1042
126
110
222
252
X5FS-40-D / X5FT-40GD X5GU-50-D / X5GW-50-D
Controller Type Touch-tone controller Touch-tone controller Touch-tone controller Touch-tone controller
Packing Parameters
Carton Size (mm) 1660×165x1120 1660×165×1120 1575×150×1435 1575×150×1435
Main Package
Gross Weight (kg) 58 62 66 69
Environment Requirements
Mounting Recommendations
43
Physical Dimensions (mm)
804 1037
170
170
75
75
RSL80 RSL120
Light Parameters
Brightness
100%
25%
hrs
Dusk 1 2 3 4 5 6 7 8 9 10 Dawn
Packing Parameters
Mounting Recommendations
44
www.pboxlighting.com
180 Watt
POLY CELL MODULE linear performance warranty
Standard performance warranty
100%
83.1%
years
1 6 12 25
KEY FEATURES
5 Busbar Solar Cell
5 busbar solar cell adopts new technology to improve the
efficiency of modules, offers a better aesthetic appearance,
making it perfect for both Horizontal and vertical rooftop
installation
High Voltage
1500V UL and IEC 1500V certified; lowers BOS costs and yields better
LCOE.
High Efficiency
Higher module conversion efficiency (up to 18%) benefit
from poly cell structure (low resistance characteristic).
Module
Advanced EVA encapsulation system with triple-layer back sheet
PID RESISTANT meets the most stringent safety requirements for to be mounted on a
variety of standard racking systems and to withstand harshest
conditions high-voltage operation with a front tempered solar glass of
3.2mm.
Frame
The sturdy, anodized aluminum frame allows the modules to be
PID RESISTANT
verticaly or horizontaly mounted on a variety of standard racking
systems and to withstand harshest conditions.
Certificates/Test/Class
TUV,DVE GS,CQC, CE, IEC,IEC 61215(Ed.2),II/IEC 61730,IEC 61701 (Ed.2)
ISO9001, IS014001, OHSAS18001
45
Engineering Drawings Electrical Performance & Temperature Dependence
Ⅱ
180
Junction box
100
160
XXXXXXXXXXXXXXXXXXXX
Ⅲ
Ⅰ
12 300
Installing Holes Label 140
10 250 120
L
1640
4
2-
Ø Isc
8 200 100
1360
860
Grounding Holes Voc
6 150 80
Pmax
Cathode - + Anode 4 100 60
Connector
2 50 40
A A
0 0 20
0 5 10 15 20 25 30 35 40
Mechanical Characteristics
XXXXXXXXXXXXXXXXXXXX
Ⅰ Ⅲ
9 5.5
Cell Type Poly-crystalline 156×156mm (6 inch)
55 4.5
35
3
14
Ⅱ
Weight 19.0 kg (41.9 lbs)
Front Glass 3.2mm, Anti-Reflection Coating,
High Transmission, Low Iron, Tempered Glass
Packaging Configuration Frame Glass-foil laminated Anodized Aluminium Alloy
( Two pallets=One stack ) Junction Box 3 shunt/BP diodes and IP67 Rated
2
30pcs/pallet, 72 pcs/stack, 840pcs/40'HQ Container Output Cables TÜV 1×4.0mm , Length: 900mm or Customized Length
STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT
Maximum Power (Pmax) 285Wp 209W 290Wp 213Wp 295Wp 216Wp 300Wp 220Wp 305Wp 224Wp
Maximum Power Voltage (Vmp) 36.0V 32.8V 36.4V 33.2V 36.8V 33.5V 37.2V 33.9V 37.4V 34.1V
Maximum Power Current (Imp) 7.92A 6.38A 7.97A 6.42A 8.02A 6.45A 8.07A 6.49A 8.16A 6.57A
Open-circuit Voltage (Voc) 44.7V 41.0V 44.9V 41.2V 45.2V 41.4V 45.4V 41.6V 45.6V 41.8V
Short-circuit Current (Isc) 8.85A 7.13A 8.89A 7.16A 8.95A 7.21A 8.98A 7.24A 9.05A 7.29A
Note: the specifications are obtained under the Standard Test Conditions: 1000 W/m2 solar irradiance, 1.5 Air Mass, and
mechanical load tested at 2400 Newtons per Sq meter.
NOCT: Irradiance 800W/m 2 Ambient Temperature 20°C AM=1.5 Wind Speed 1m/s
46
TECHNICAL DATA SHEET FOR 10M CONCRETE POLES
31
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
RFX 1000000493 October 26, 2020
7|Page
63
PROJECT: SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH MAST FLOODLIGHTS ,GRID CONNECTED STREET LIGHTS
AND SOLAR STREET LIGHTS IN KILIFI SOUTHCONSTITUENCY.
MANPOWER MOBILIZATION
PROJECT DURATION
WEEKS
S/No. Manpower Description
1 2 3 4 5 6 7 8 9 10 11 12
12-Oct 19-Oct 26-Oct 2-Nov 9-Nov 16-Nov 23-Nov 30-Nov 7-Dec 14-Dec 21-Dec 28-Dec
A INDIRECT MANPOWER
1 Director 1 1 1 1 1 1 1 1 1 1 1 1
2 Project Manager 1 1 1 1 1 1 1 1 1 1 1 1
3 Construction Manager 1 1 1 1 1 1 1 1 1 1 1 1
Subtotal 3 3 3 3 3 3 3 3 3 3 3 3
DIRECT MANPOWER
1 QC Engineer 1 1 1 1 1 1 1 1 1 1 1 1
2 Site Engineer 1 1 1 1 1 1 1 1 1 1 1 1
4 Surveyor 1 1 1 1 1 1 1 1 1 1 1 1
5 Skilled Labour 8 8 10 6 7 9 7 8 12 12 10 8
6 Semi-Skilled Labour 5 3 6 4 7 4 5 5 3 3 5 6
7 Unskilled Labour 8 7 6 9 8 8 9 11 12 10 11 9
Subtotal 24 21 25 22 25 24 24 27 30 28 29 26
TOTAL DIRECT AND
27 24 28 25 28 27 27 30 33 31 32 29
INDIRECT MANPOWER
64
8. DETAILED CONSTRUTION SCHEDULE
8|Page
65
PROPOSED PROGRAMME OF WORKS FOR GRID CONNECTED STREET LIGHTS IN KILIFI SOUTH CONSTITUENCY
ID Task Name Duration Start Finish PredecessorsOctober November
December
January FebruaryMarch April
May June
E B M E B M E B M E B ME B M E B M E B M E B M E
1 PUBLICITY SIGN 4 days Fri 2/5/21 Wed 2/10/21
2 SUPPLY 16 days Wed 2/10/21 Wed 3/3/21 1
3 Pre-stressed round reinforced concrete 5 days Thu 2/11/21 Wed 2/17/21 1
4 poles
150W,240V LED street lights 2 days Thu 2/18/21 Fri 2/19/21 3
5 Standard steel,burglar proof and lockable 1 day Mon 2/22/21 Mon 2/22/21 4
6 control
30A, pillar
240V 4 pole contactor with Ant 1 day Tue 2/23/21 Tue 2/23/21 5
7 Surge Switch fuse
80A,SPN 1 day Wed 2/24/21 Wed 2/24/21 6
8 24 hour timer switch 1 day Thu 2/25/21 Thu 2/25/21 7
9 100A SP 500mA circuit breaker 1 day Fri 2/26/21 Fri 2/26/21 8
10 100A 4-way SPN consumer unit 1 day Mon 3/1/21 Mon 3/1/21 9
11 Earth lead cable and copper electrode 1 day Fri 2/26/21 Fri 2/26/21
12 Earthing ferrule 1 day Sat 2/27/21 Sat 2/27/21
13 6.00mm sq Aerial Bundled cable 1 day? Tue 3/2/21 Tue 3/2/21 10
14 INSTALLATION 63 days Thu 3/4/21 Mon 5/31/21 2
15 10mm round pre-stressed reinforced 27 days Thu 3/4/21 Fri 4/9/21 3
16 concrete poles
150W,240V LED street lighting fittings 8 days Mon 4/12/21 Wed 4/21/21 15
17 control gear 3 days Thu 4/22/21 Mon 4/26/21 16
18 Tubular lamp 5 days Tue 4/27/21 Mon 5/3/21 17
19 Standard steel,burglar proof and lockable 3 days Tue 5/4/21 Thu 5/6/21 18
20 control
Lockablepillar
control pillar 4 days Fri 5/7/21 Wed 5/12/21 19
21 Earthing with earth lead cable and 4 days Thu 5/13/21 Tue 5/18/21 20
22 copper electrode
6.0mm sq Aerial Bundled cable 3 days Wed 5/19/21 Fri 5/21/21 21
Page 1
66
PROPOSED PROGRAMME OF WORKS FOR GRID CONNECTED STREET LIGHTS IN KILIFI SOUTH CONSTITUENCY
ID Task Name Duration Start Finish PredecessorsOctober November
December
January FebruaryMarch April
May June
E B M E B M E B M E B ME B M E B M E B M E B M E
23 Final connection to the Luminares 6 days Mon 5/24/21 Mon 5/31/21 22
24 TESTING 6 days Tue 6/1/21 Tue 6/8/21 23
25 COMMISSIONING 1 day Wed 6/9/21 Wed 6/9/21 24
26 ROUTINE INSPECTION AND MAINTENANCE 2 days Thu 6/10/21 Fri 6/11/21 25
Page 2
67
PROPOSED PROGRAMME OF WORKS FOR SOLAR STREET LIGHTS IN KILIFI SOUTH CONSTITUENCY
ID Task Name Duration Start Finish Oct 25, '20 Nov 1, '20 Nov 8, '20 Nov 15, '20
M T W T F S S M T W T F S S M T W T F S S M T W T
1 SUPPLY 6 days Tue 10/27/20 Tue 11/3/20
2 PV modules(160w) 1 day Tue 10/27/20 Tue 10/27/20
3 100w integrated solar LED solar 2 days Wed 10/28/20 Thu 10/29/20
4 powered lamp
Overcharge,Discharge,short 1 day Fri 10/30/20 Fri 10/30/20
5 circuit,open
10m load and surge
round pre-pressed reinforced 1 day Mon 11/2/20 Mon 11/2/20
6 concrete poles
brackets 1 day Tue 11/3/20 Tue 11/3/20
7 INSTALLATION 9 days Wed 11/4/20 Mon 11/16/20
8 Foundation works 2 days Wed 11/4/20 Thu 11/5/20
9 10M round pre-pressed reinforced 2 days Fri 11/6/20 Mon 11/9/20
10 concretebrackets
Provide poles for fitting the 1 day Tue 11/10/20 Tue 11/10/20
11 lighting
Fix system
PV modules 1 day Wed 11/11/20 Wed 11/11/20
12 Install 100w integrated LED solar 1 day Thu 11/12/20 Thu 11/12/20
13 powered
Install lamp
overcharge,discharge,short 1 day Fri 11/13/20 Fri 11/13/20
14 circuit,open
Connect load and surge
to Luminaires and PV 1 day Mon 11/16/20 Mon 11/16/20
15 panels.AND COMMISSIONING
TESTING 1 day Tue 11/17/20 Tue 11/17/20
Page 1
68
PROPOSED PROGRAMME OF WORKS FOR DISTRIBUTION,ELECTRICAL WORKS FOR 5 NO, 30M MONOPOLES FOR HIGH MAST LIGHTING IN KILIFI SOUTH
Page 1
69
9. CV’S AND CERTIFICATES OF KEY PERSONNEL
SUPERVISOR
TECHNICIANS-C1
TECHNICIANS-T3
9|Page
53
70
71
72
73
74
75
76
Koech Vincent Kosgei CV
EDUCATION
2017 Feb
T3 Solar Grid Tie Training (ERC T3 licensed)
Strathmore University – Energy research Centre
77
WORK EXPERIENCE
78
August 2015 - September 2016
Tata chemicals- Energy officer
✓
Planning, organizing, coordinating and directing the company utility management
program. Develops and implements short and long-range utility management goals
and objectives. Recommend policies and procedures for effective, efficient and
economical company operations.
✓
Collaborates with the Maintenance and Operations sections for implementing measures to
reduce utility and usage and improve efficiency. Provides staff training and makes
regular inspection of facilities for implementation of utility management measures.
✓
Studying operations in order to identify energy conservation opportunities,
implement energy retrofit to reduce energy consumption.
79
✓ Developing material inventory monitoring parameters, for the new aircrafts type to the
enterprise resource planning system through analysis of material consumption rates at
entry to service phase
✓
Material planning for scheduled checks to ensure availability to sustain check.
✓
Ensure updated maintenance statuses of aircrafts in term of effected SBs and
ADs effected on an aircrafts that are to be redelivered.
✓
Liaising with suppliers/vendors to expedite ordered materials to ensure timely reception
of the materials.
80
✓
Boiler operation and maintenance
✓
Waste control management.
ASSOCIATIONS
2015 TEEP - Tony Elumelu Entrepreneurial Program Entrepreneur
REFEREES
Silas Kemei
Assistant Regional Manage
Phone: +254722965639
E-mail: kemei@chlorideexide.com
Rogers Maina
Procurement Engineer - Tata Chemicals.
Phone: +254721884307
Email: rmaina@tatachemicals.com
81
82
83
84
62
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
79
102
80
103
81
104
82
105
83
106
84
107
10. AUDITED REPORTS
10 | P a g e
85
108
86
109
87
110
88
111
89
112
90
113
91
114
92
115
93
116
94
117
95
118
96
119
97
120
98
121
99
122
100
123
101
124
102
125
103
126
104
127
11. MANUFACTURERS AUTHORIZATION LETTERS
11 | P a g e
105
128
106
129
130
107
131
108
132
12. MANUFACTURERS WARRANTY LETTERS
12 | P a g e
109
133
110
134
135
111
136
112
137
RFX 1000000493 October 26, 2020
13 | P a g e
113
138
114
139
GUANGDONG DICKEN LIGHTING TECHNOLOGY CO.,LTD ...
Guangdong Dicken Lighting Technology Co. Ltd
Address:Building 5 Jiaohefeng Hardware, Luoxi Bridge, Haizhu District, Guangzhou, Guangdong, China (528419)
Tel: (86 20) 34171167
Fax: (86 20) 34171167
Manufacturer Details:
Manufacturer Contacts:
Postal Address:528476 No.5 Qinglong Road Xinmao industrial park Henglan Town Zhongshan City Guangdong
China
Email: dick@dk-lighting.com.cn
Main Contact
Email: huitong@vip.163.com
Telephone No.+86-13755487242
NAIROBI,
KENYA
Manufacturer Details:
Manufacturer Contacts:
Main Contact
Email: sherry@leadsunglobal.com
………………………….
Signed (Authorized Signatory)
Add: NO. 1, PINGDONG 1ST ROAD, NANPING SCIENCE & TECHNOLOGY INDUSTRIAL PARK, ZHUHAI, CHINA 519060
Tel: 86-756-2289712 Fax: 86-756-8682090 E-mail: sales@pboxlighting.com http://www.pboxlighting.com
142
14. LPO’S –SIMILAR ON GOING WORKS
13 | P a g e
117
143
118
144
15. LPO’S COMPLETION CERTIFICATES OF SIMILAR WORKS
14 | P a g e
119
145
120
146
121
147
148
.....
.~
......u
.S
......
u
'0
~
'""d
u
u
::.:B
~
.......
o
o
<IJ
(])
til
~
<IJ
ro
;..
.D
U
u
i
>-.
GOSOLARSYSTEMSLTD
POBOX7423100200
NAI
ROBI
T
EL:
020
-55
221
6FAX:
020
-55
221
5
137
149
150
z
o
~
~
ro a::
..a
:J o
u..
W c
V)
z
I- OJ a::
«
0
0
o,
0
c
~
u
- ~
0
.......
c:(
a::
-
LL
I-
~
V)
ro
.s:
J-
Z
o
u
0: @ tlO
:c
W U
I-< 0
E
0 <8 <::t
v)
liJ u
CI...
Z ~ N
138
..-t
>
0 .....~ 4-
-
l-
7
N
0
0 Q
0
no
C
c
0
11)
W Z ::r: V)
V)
....J u 'E
-IL
I) U)
..,___
U ro
,r (j)
E
(j)
C
c,
:2:
0\
,......
0
N
..,___
\0
=
N
0
~
E
0
u
Q£)
a.i
:J
-0
OJ
..c
r..t.,r..t., c
0
r..t.,
0 '';::; u
0...0...
'N
nl
Lo
0
::r::::r: !il w ~
V) Vl
c
o
0 c;
.o ~ 0
-0
OJ
Q) c:( '';::; ......
~ '0 Q) ro OJ
Q
U
Q)
(..IU
0 ....Cl
~
Z
J-
ro
....... E
ci,
V)
Cl ...... U o
....0 Q) -+-'
(..I
;... Q)
Q) W
C
u
~nl Q) .......
01) -, > ......
u
I:.t-< 0 '0 0 (i OJ
E Q) ;... :::s a..
0 P::;f;l. ~ a:: :J "0
....
I) a.. V) CI...
136
151
152
0
~
;;...
~.
~
~
~
Z
0
H
~
U
~
Vl
~
~
Vl
~
0
~
f:1
I'il~
HZ
~~
U:;j
137
t3:p.,
0l'il
ZQ
~~
~
~ ~~
~
q ~~
g ~O
O~
~
~ U~
~ §:~ ~ ~
:<::;~~Oo
<:)C)ZQ~
t'l
~~~
~~~
se r1
~
~ CI)CI)
8 ~ s~ cs ~O'
P-.o:t
00
U..,
127
153
I
I·
I~.
I
.f5
.
GOSOLARSYSTEMSLTD
POBOX7423100200
NAI
ROBI
T
EL:
020
-55
221
6FAX:
020
-55
221
5
128
154
129
155
130
156
131
157
138
158
139
159
140
160
141
161
142
162
143
163
144
164
145
165
146
166
147
167
148
168
149
169
150
170
GOSOLARSYSTEM SLTD
POBOX7423100200
ROBI
NAI
EL
T 0
:2-
052
521 0
6FAX:2-
052
525
1
151
171
152
172
153
173
154
174
155
175
156
176
157
177
RFX 1000000493 October 26, 2020
16 | P a g e
158
178
159
179
160
180
161
181
162
182
163
183
164
184
165
185
166
186
167
187
168
188
169
189
170
190
171
191
172
192
173
193
174
194
175
195
176
196
RFX 1000000493 October 26, 2020
17 | P a g e
177
197
LIST OF VEHICLES AND TOOLS OWNED
EQUIPMENT REG NO/SERIAL NO. STATUS QTY
FH LORRY KAV 531F OWNED 1
TOYOTA HILLUX KBL 791A OWNED 1
TOYOTA LAND CRUISER KBU 427K OWNED 1
MITSUBISHI L200 KAV 044Q OWNED 1
MITSUBISHI LANCER OWNED 1
TOYOTA NOAH KBG 631A OWNED 1
TOYOTA LAND CRUISER KBS 319A OWNED 1
SUBARU KBV121Z OWNED 1
178
198
GOSOLARSYSTEMSLI MI
TED.
KAMPALAROAD
P.
OBOX:7423100200
1 50
0KGCONCRETEMI
XER 24
3,600.
00 243,
600.
00
1 HONDAPOWERVI
BRATOR 65,
000.
00 65,
000.
00
KES.
3 08.
600
.00
KES49
,37
6 .
00
KES357,
976.
00
179
199
180
200
181
201
182
202
183
203
184
204
185
205
186
206
187
207
188
208
189
209
RFX 1000000493 October 26, 2020
18 | P a g e
190
210
191
211
212
RFX 1000000493 October 26, 2020
19 | P a g e
192
213
193
214
194
215
195
216
196
217
RFX 1000000493 October 26, 2020
20 | P a g e
197
218
198
219
199
220
221
200
222
201
223
202
224
203
225
204
226
205
227
206
228
207
229
208
230
209
231
210
232
211
233
212
234
213
235
214
236
215
237
216
238
217
239
218
240
219
241
220
242
221
243
222
244
223
245
224
246
225
247
226
248
227
249
228
250
229
251
230
252
231
253
232
254
233
255
256
257
258
259
260
261
262
RFX 1000000493 October 26, 2020
21 | P a g e
263
264
265
266
267
21. GO SOLAR HEALTH AND SAFETY PROGRAM
21 | P a g e
268
HEALTH & SAFETY PROGRAMME
www.gosolarltd.com
269
1. HEALTH AND SAFETY
1.1. POLICY
It is the responsibility of every employer to ensure the safety, health and welfare of
all employees at work working in his/her workplace. Go Solar Systems Ltd follows the
procedures as outlined in The Occupational Safety and Health Act of 2007 that provides for
the safety, health and welfare of workers and all persons lawfully present at workplaces.
270
Send a copy of each risk assessment report to the area occupational safety and
health officer.
Take immediate steps to stop any operation or activity where there is an imminent
and serious danger to safety and health and to evacuate all persons employed as
appropriate.
Register their workplace unless such workplace is exempted from registration under
this Occupational Health and Safety Act.
The Occupational Safety and Health Act, specifies that a worker shall not be employed at
any machine or in any process liable to cause ill health or bodily injury, unless he/she has
been fully instructed as to the dangers likely to arise and has received sufficient training in
271
work at the machine or in the process; or is under adequate supervision by a person who has
a thorough knowledge and experience of the machine or process.
This training has to be carried out on recruitment; transfer or change of job; the introduction
or change of new work equipment or materials; and the introduction of new technology.
The training shall be adapted to take into account new changed risks, and be repeated
periodically. The cost of training shall be incurred by the employer.
272
Annex 1
Employee Induction Form
Induction Checklist
Worker’s name: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Position/job . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manager/supervisor: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Department/Section: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
273
Explain your security: Conduct a follow-up review:
Cash Repeat any training required or provide
For each worker and for their personal additional training if needed
belongings Review work practices and procedures with
Show your work environment: the worker
274
22. PRICED BILL OF QUANTITIES