Tenders are invited on-line on the website http://eprocuregsl.nic.in from eligible bidders having Class
III, Digital Signature Certificate (DSC) issued by any agency authorised by Controller of Certifying
Authority (CCA), Govt. of India for undertaking the following works.
17 TENDER FEE N. A.
18 EARNEST MONEY DEPOSIT
Rs 1,70,000/-
(EMD)
1. All GSL procurements will be done only through e-tendering mode. This would enable greater
transparency, integrity and fairness in the process. It would result in expeditious processing, affording
fair opportunities to the bidders.
2. Enrollment:
To participate in the e-tendering process, all vendors must enroll themselves with GSL. The following
procedure is to be followed: for enrollment.
3. Registration:
After enrollment, the bidder has to get himself registered on-line on the e-Procurement portal
(http://eprocuregsl.nic.in), if he has to submit the Bid . The on-line registration on the portal is free of
cost and a one time activity. If you have not registered already, the following procedure is to be
followed.
A: EMD shall be through in the form of Demand Draft / Bankers Cheque / Bankers Pay Order / Bank
Guarantee (DD/BC/BPO/BG). Scanned copy of EMD should be attached with online bid.
DD/BC/BPO/BG towards EMD, in original should reach GSL within 7 days (inclusive of date of
opening of tender and date of receipt of EMD) super scribing on the envelope the tender
description, tender reference no. and tender due date. DD/BC/BPO/BG towards EMD
received after above mentioned period will not be considered and in the absence of these, tender
will not be accepted.
B: In case of exemption from EMD, firm has to attach scanned copy of valid exemption certificate
(udyog aadhaar / NSIC registration certificate etc.) in the on line bid. No exemption will be granted
unless this certificate is attached.
C: No adjustment of the EMD shall be made, if EMD/Security deposit held with GSL with the existing
/ any other contracts.
D: The Tenderers EMD will be forfeited, if the tenderer withdraws his tender during the period of
tender validity, or invalidates his tender; or wants to modify his tender unilaterally during the
period of tender validity or refuses to accept the correction of errors. If any of the documents
submitted with tender or thereafter and are found false / forged, during tender evaluation or during
contract execution, EMD/Security deposit of such tenderer shall be forfeited, EMD of successful
tenderer may also be forfeited, if tenderer fails to accept /sign the contract or fails to execute the
contract
6. Instruction for Submission of Bid:
A: The bidder has to submit the bids on-line in the system available at the above referred portal. The
bidder has to agree to the on-line user portal agreement. Then only the system will permit the bidder to
proceed further in the system. He has to fill all mandatory fields indicated by an asterisk ( * ). All
documents indicated to be submitted in ‘cover details’ are to be enclosed without fail. These
documents are to be uploaded only in .doc or .pdf or .jpg or .rar formats. Deviations in the technical
specification if any are to be mentioned in the document ‘Technical Deviation‘. Similarly, deviations if
any in commercial terms and conditions are to be indicated in the document ‘Commercial Deviation’. In
case there are no deviations to technical and commercial terms & conditions, bidders to indicate NIL
deviations in the document.
B: Withdrawal of Bid: Bidder may withdraw a bid, submitted already, if he wishes before the bid
submission end date and time.
C. Modification of Bid: Bidder may modify the already submitted bid on-line, if he wishes, but before the
bid submission end date and time. The system will accept only the last submitted bid.
D: Clarifications: Bidder may seek clarification on NIC portal only, if any before the due date and time set
for clarifications. The clarifications sought will be furnished by GSL within a week. These clarifications
will be available even to those who have not sought the clarification but participating in the tender.
E. Bid Validity: The validity period of the bids shall be 120 days (One hundred twenty days) from the last
date of submission of bid. The bidder shall not, during the said period or within the period extended by
mutual consent, revoke or cancel his bid or alter any terms/conditions thereof without the written
consent of GSL. If a bidder is found violating this condition, GSL shall have right to take appropriate
further action.
F. Price bid: The Price bid containing the Bill of Quantity will be in Excel format and will be downloaded
by the bidder. Price bid shall be furnished strictly according to Instruction for filling Price Bid mentioned
in this tender. The bidder has to quote according to Instruction for filling Price Bid mentioned at Sr no L
below.
Note that the L1 bidder (lowest quote) will be based on the total price quoted by the firm in the price
bid format. The system will generate a comparative statement. Bidder can find out the status of his
tender on line, any time after opening the bids.
G.
i) The Tenderers shall submit their offer in compliance with all Acts, Regulations, Ordinances, Laws,
Statutes, Notifications and amendments issued thereto by the State as well as Central Government
ii) Successful tenderer / tenderers shall comply with all Acts, Regulations, Ordinance, Law statutes,
Gazette, Notifications and amendments issued thereto by the state as well as central Government
regarding payment of Minimum wages, ESI, PF contributions and Bonus.
iii) Subcontractor shall also comply with all statutory requirements in addition to Minimum wages, ESI, PF
contributions and Bonus as promulgated through Central / State Gazette from time to time.
H. It is the bidder’s responsibility to comply with the system requirement i.e. hardware, software and
internet connectivity at bidder’s premises to access the e-tender website. Under any circumstances,
GSL shall not be liable to the bidders for any direct/indirect loss or damages incurred by them arising
out of incorrect use of the e-tender system or internet connectivity failures.
I. Technical and Price bids will be decrypted and opened online, on or after the scheduled date and time.
Till such time, the bids will be only in the encrypted form. After the scheduled time, the bids will be
opened by stipulated Bid Openers with their Digital Signature Certificates (DSC). The Technical-bids
shall be evaluated based on the information furnished by bidders. If any clarification is required from
bidder, GSL will seek such clarifications. If required, they will be called for technical discussions. The
bidder has to be present for technical discussions if called for.
J. All the bidders who participated in the tender will get system generated intimation from the system
regarding their acceptance or otherwise of their tender. After scrutiny of documents, bidders will
be assessed for meeting the pre-qualification criteria and accordingly qualified bidders will be
called for technical discussions at GSL. Thereafter, a system generated e-mail confirmation will
be sent to all technically cleared bidders communicating the date and time of opening Price-bids.
K. The Price-bid of the successful bidders (qualified in Technical-bid) will be decrypted and opened
on-line, on the scheduled date and time by the Bid Openers with their Digital Signature Certificate
(DSC). The bidders can view the status of their bid on the website.
M: All bids are to be submitted on-line on the website http://eprocuregsl.nic.in. No bid shall be
accepted off-line.
7. Submission of Bid:
Please refer to the attached Annexures & Enclosures for detailed Scope of work and commercial
Terms & Conditions of the tender. Offer must be forwarded through on-line e-tendering.
b) Audited balance sheets with profit and loss statement and auditor report for last three financial
years.
d) Proof of work experience that meets the qualifying criteria mentioned in pre qualification
criteria (work orders complete with detailed scope of work and corresponding work completion
certificates).
Or
Scanned copy of exemption certificate as mentioned at Sr. no. 4.3 of Annexure III.
f) Scanned copies (duly signed and stamped on every page) of Annexure I, III, IV, VII.g)
Scanned copy of duly filled & stamped Annexure VIII, X & XI.
ii) Part-II “PRICE BID” containing only on line price bid schedule as per Excel format. Bidders to note
that the final quoted amount shall be deemed to be exclusive of GST / IGST. GST / IGST at
prevailing rate will be applicable. Presently GST / IGST rate for sub contracts is 18%.
b. Following bid rejection criteria may render the bids liable for Rejection:
i) Bids received without Audited/Certified balance sheet, profit & loss account for the last three
financial years.
ii) Bids received without scanned copy of solvency certificate as mentioned in pre qualification
criteria.
iii) Bidder’s failure to furnish sufficient or complete details for evaluation of the bids within the
given period which may range from one to two weeks depending on the deficiencies noticed
in the drawings/technical data within the validity period.
iv) Incomplete / misleading / ambiguous technical bid in the considered opinion of Technical
Negotiation Committee (TNC) of GSL.
v) Bids with technical and commercial requirements and or terms not acceptable to GSL.
vi) Bids received without scanned copies of documentary evidence in support of pre-qualification
criteria as required as per the tender.
vii) EMD validity period is shorter than specified in the tender enquiry.
viii) Solvency certificate is not addressed to GSL.
ix) Validity period indicated by the bidder is shorter than that specified in the tender enquiry.
x) Bids not meeting the pre-qualification parameters stipulated in the tender enquiry.
Note:
Following documents in original should reach GSL within 7 days (inclusive of date of opening of
tender and date of receipt of documents) super scribing on the envelope the tender description,
tender reference no. and tender due date.
(a) DD/BC/BPO/BG towards EMD, in original.
(b) Original solvency certificate or proof of submission of solvency certificate to GSL.
DD/BC/BPO/BG towards EMD & solvency certificate received after above mentioned period will
not be considered.
9. Pre bid meeting:
Firms desirous to obtain clarification on techno commercial conditions stipulated in scope of work
(Annexure I), commercial terms & conditions (Annexure III) and general terms & conditions
(Annexure IV) etc, can attend the pre bid meeting, prior to submission of bids. The pre bid meeting
for this tender is scheduled on 03/07/2020 at 10:30 HRs in OS Department. The meeting will
constitute reps from User, Outsourcing & allied departments. Due to any exigency, if date of
meeting is declared as a closed holiday then same will be held on next working day. Firms are
requested to send a prior mail indicating relevant details of their representative, authorized to
attend the meeting. The mail should reach this office latest by 9:30 HRs of 02/07/2020. Personnel
attending meeting shall posses authorization certificate for attending the meeting.
10. Due to any exigency, if due date for opening of the tenders is declared as closed holiday, in such
cases the tenders will be opened on next working day at the same time.
11. We look forward to receive your most competitive and reasonable offer against this tender.
Thanking you.
Yours faithfully,
For GOA SHIPYARD LIMITED
SCOPE OF WORK FOR HULL OUTFITTING & STRUCTURAL ASSEMBLY JOBS FOR NEW
CONSTRUCTION SHIP
a) The contract is for a period of one year. Subcontractor should be able to provide 24 nos of
workmen comprising of 12 nos skilled fabricators, 4 nos skilled Welder-Cutters, 2 nos
Certified Welders, 4 nos Unskilled helpers along with 2 experienced Highly Skilled
supervisor on daily basis. Any additional requirement of up to 25 %, should be arranged
whenever needed, within a notice period of 1 week. Subcontract workmen should be
prepared to work on overtime/ holidays and in shifts depending on urgencies of work.
b) The selection process of employees (Fabricators, Helpers and Supervisor) will be conducted
by nominated GSL rep through Practical skill test. On satisfactory performance the firm will
deploy the employees on assigned job.
c) In case the skill/ knowledge/ output of any of the appointed supervisor/ employee is found to
be lacking, GSL reserves the right to discontinue his services from the jobs and the
s/contractor has to provide suitable replacement within one week’s time.
d) The individual fabricators & helpers may be merged with GSL employees.
e) The firm shall not divert man power without permission of GSL-Hull Out Fit section.
f) It will be the responsibility of the firm to ensure that all their workmen are provided with
personal safety gears such as safety shoes, helmets, hand gloves, nose masks, overalls etc.
and ensure its use while working. PPEs to conform to Statutory quality and certificates to be
provided to GSL safety officer.
g) The firm to submit the employee’s attendance with bio metric punching record and work
report to Hull out Fit section on daily basis.
h) The firm’s employees will assist to carry out all testing work onboard ships under the
guidance of GSL reps.
i) Firm is liable to be penalized in according to terms of the contract if there
are repeated problems regarding non completion of the work in given time, poor quality of
work and not ensuring minimum 90% attendance on normal days.
j) Site register to be maintained for recording the specific jobs that are being undertaken by the
subcontractor personnel.
3 Skill requirement:
The s/contractor should have a team of steel fabricators with experience in the marine fabrication/
repair fields. The fabricators shall preferably have ITI or NCTVT Qualification, but personnel with
High school records & adequate experience, can also be considered after an initial set of skill tests.
Subcontractor should have capable supervisor with adequate qualifications (Diploma or well
experienced ITI) to read/ interpret production drawings w.r.t fab/ assembly jobs.
Supply of material and assistance from GSL:
1. All required materials/ items will be supplied by GSL, however, flat bars, brackets, lugs; etc will
have to be prepared from the left over plates that will be provided by GSL.
2. All tools, machineries & consumables will be provided by GSL. Compressed air and electrical
supply also will be given. Services of GSL’s bending machine,
Flanging machine, shearing machine etc. as required will be provided on request.
3. Services of cranes & hydraulic jacks will also be provided on request.
Inspection Requirements
Inspection of items will be by ABS, IRS, GSL (QA) and CGOT /WOT representatives. It will be
subcontractor’s responsibility to arrange for stage inspection as per GSL quality plans, and offer to
the surveying authorities as and when required. A copy of “ QAP” for Hull Outfit activities may be
collected from GSL QA Dept prior to or during TNC.
General Notes:
1. Work should be carried out strictly as per GSL drawings/instructions. Nonconformity to drawings
will not be acceptable, and the s/contractor has to rectify the defect at his own cost. Any deviation
from the drawing should be approved by GSL before the commencement of work.
2. The drawings and other pertinent documents supplied to the sub-contractor should be returned to
GSL, once job is completed. No print or copy of drawings should be taken without the prior
concurrence of GSL.
3. All fitments are to be inspected & cleared by GSL-QA/ Class prior to welding. Any re-work due to
poor supervision or bad workmanship will be at the cost of the subcontractor. Manhours spent on
such work will not be paid. The Firm’s are to ensure that all cut outs are carried out with neat
contours, and proper grinding. The Firm shall ensure that temporary supports are minimally used,
and all residual extra tacks are removed and ground smooth.
4. If the progress of the work is found to be poor in terms of output & quality, GSL reserves the right
to cancel the order and get the same done through other sources at the cost and risk of sub-
contractor.
5. All material handling related to the jobs to be done by the s/contractor. Trolleys/ mobile crane
assistance as required will be provided by GSL free of cost.
6. Job allocation on a daily basis will be done by GSL- Hull Out Fit section. Subcontractor supervisor
to ensure completion of each job within stipulated time. If any of the subcontractor employee is found
loitering/ idling, or engaged in activities not assigned to him, those man-hours will not be considered
for payment. It shall be the Subcontractor responsibility to give prior intimation at QA ( either directly
or through Prodn in charge) prior to undertaking any jobs , during night hours or on Sundays /
holidays; Jobs undertaken without intimation, shall be subjected to additional NDT checks at the
Subcontractor’s cost.
8. Necessary work permits to be obtained from concerned authorities before working at Heights, Hot
work onboard & Confined space.
OTHER TERMS AND CONDITIONS OF CONTRACT:
(i) Storage and safe custody of materials shall be ensured by the subcontractors. Any loss of
material / item from the custody of the subcontractor shall be to their account.
(ii) On completion of given job (after each activity related to fabrication) the supervisor has to inform
the HOF section to raise requisition for inspection stage wise by QA & CGRPT and offer inspection
at site before commencement of next stage or next activity.
(iii) The subcontractor shall ensure necessary safety precautions and use of proper tools and
equipments.
(iv) The subcontractor may have to work overtime or on holidays to meet the shipyard schedules.
(v) The subcontractor shall work in general shift (0830 hrs to 1630 hrs) however at times depending
upon the requirement he may have to deploy his workmen & supervisor in second shift (1600hrs to
2400hrs) as per yard requirement.
Please note followings for the second shift (i.e. 1600hrs to 2400hrs)
a). No canteen facilities will be provided by GSL for the second shift. Subcontractor has to make his
own arrangement for dinner for his personnel.
c). No overtime will be provided for the second shift. However if GSL requires, the workmen &
supervisor have to continue the work after 24.00hrs which will be treated as over time.
d). Subcontractor should ensure that none of his personnel are staying in GSL premises after
2400hrs. (If they have authorized to work only up to 2400hrs.)
e). Any person on the 1st shift should not be deployed continuously on the same day in the second
shift.
f). In case there is no requirement for 2nd shift, subcontractor may be asked to deploy his personnel
for the 1st shift.
(vi)The subcontractor shall take necessary insurance coverage against any accident to their
personnel and arrange transportation and hospitalization, as necessary, at their own risk and cost.
(vii) Any faulty work carried out by the subcontractor is to be rectified by them within the period
stipulated by GSL. In case of failure on the part of the subcontractor, GSL shall have the right to get
the job done by any other subcontractor and Recover the cost for the same.
------------------------------------------------------
Signature and Seal of the Firm
ANNEXURE II
PRE QUALIFICATION CRITERIA
c. The subcontractor should have provided / carried out either of following (c-i or c-ii) in
last 7 years ending 31/05/2020.
c-i. Providing fabricators & welders or fabricators & welder-cutters with or without helpers
for new construction ship building work / ship repair work
OR
c-ii. Carried out fabrication of MS hull block and / or erection of MS hull block for new
construction ship building work and / or undertaken Hull outfitting jobs which includes
fitting, fabrication and installation of seatings, Deck machineries, scuttle, window/
Water tight/ weather tight doors, A Brackets with associated work, Fin Stabilizer, Bow
Thruster, chequered plating for new construction ship building work.
The experience credentials of bidder shall meet either or combination of the above (c-
i) or (c-ii)
Note:
(a) As a proof of work carried out, the bidder is required to submit the copies of Contracts
/ Work Orders (including the full scope of work) along with final / stage-wise Work
Completion Certificates. Irrelevant work orders not pertaining to prequalification
criteria and work orders without detailed scope of work and without work
completion certificate will not be considered for processing. The concerned
HOD or TNC has a right to verify /cause verification of authenticity of the said
document whenever felt necessary.
(b) All financial and work experience related documents issued in the name of bidding
organisation only will be considered for processing.
(c) Firms with change in name may be considered on submission of valid documents like
Partnership deed / affidavit for proprietorship / articles of association including the
changes in the constitution of the firm, as applicable.
ANNEXURE – III
1. GOVERNING OF TENDER:
The contract resulting from this invitation for Tender, shall be governed by the terms & conditions of
the Tender, and the Tenderer quoting against this enquiry, shall be deemed to have read, understood
and accepted the same.
2. COUNTER OFFER:
Where counter Terms & conditions are offered by the Tenderer, those shall not govern the Tender,
unless, specific acceptance of the same is conveyed in writing in the contract or amendment contract
by GSL.
3. VALIDITY:
Offers should be valid for a period of 120 days from the date of opening of the tender.
4. ADDITIONAL PROVISONS
“The MSEs registered with District Industries Centre or Khadi & Village Industries Commission or
Khadi & Village Industries Board or Coir Board or National Small Industries Corporation (NSIC) or
Directorate of Handicraft & Handloom or Udyog Aadhaar or any other bodies specified by Ministry of
Micro, Small & Medium Enterprises will be eligible to be considered under MSE category”.
4.3 Firms in the process of obtaining NSIC registration will not be considered for EMD exemption.
Participant MSE firm submitting Udyog Adhar / NSIC / DIC / SSI / other authorised bodies
registration certificates specified by Ministry of MSME has to qualify for EMD exemption
should necessarily submit valid copy of the Registration certificate. Firms should upload
scanned copy of valid registration certificate as issued in Part-I of e-offer during bid
submission
4.4 Notwithstanding the above, GSL’s decision in this matter on exemption from EMD, splitting of
works to participants shall be final and binding.
4.5 The GSL reserves the right to accept and or reject any or all tenders and or to withdraw the
tender in total and or award the contract / order in full or part to more than one vendor /
contractor without assigning any reason whatsoever and without thereby incurring any liability
to the affected Bidder or Bidders or any obligations to inform the affected Bidder or Bidders of
the grounds for GSL action”.
4.6 As per public procurement Policy MSME order 2012, you are required to submit a valid proof
of registration as an MSE vendor along with details. GSL reserves the right to verify
authenticity of udyog aadhaar memorandum submitted by vendor claiming to be MSE through
internal sources or through jurisdictional MSME. The MSE shall submit a letter of undertaking
confirming that he is a service provider and not a trader. If it is found that bidder is not an
MSE, GSL will deny benefits / incentives applicable to MESs.
4.7 In the event it is discovered by GSL that the declaration submitted by the vendor is false, GSL
reserves the right to debar such vendor and stop them from participating in future tenders and
will refer the case to MSME and intimate other DPSUs for debarment as per policy in vogue.
5. PRICES / RATES :
a. The service charges shall remain fixed & firm during the validity period of contract. No increase in
service charges, whatsoever, on any account shall be considered by GSL during period of
contract.
b. Any increase/decrease in the minimum wages/PF/ESI/Bonus (as specified by State / Central Govt.
in category “Construction OR Maintenance”) for the unskilled/semi skilled/skilled/highly
skilled/supervisor during the period of contract shall be payable by GSL over and above the rate
prevailing as on tender opening date. The pro-rata escalation / de- escalation payable on account
of increase in minimum wages with statutory allowances shall be applicable to the actual number
of unskilled/semi skilled/skilled/highly skilled employed whole time by the contractor for execution
of the work in contract and who are necessarily and properly paid the increased wages
exclusively in connection with the work of the contract. The present basic minimum wage rate for
skilled workers i.e Fabricator, is Rs. 695/-, for Certified welder is Rs. 695/-, for Welder cutter is Rs.
695 and for unskilled workers i.e. for Helper is Rs. 525/- and for highly skilled worker ie
supervisors, is Rs. 764/- as per Govt Notification dated 08/05/2020 effective from 01/04/2020.
c. Price Negotiation may not be carried out with the tenderers and that the Contract/order is likely to
be awarded to the lowest tenderer, if the rates offered are acceptable and prices are found to be
reasonable.
6. QUANTITY VARITION:
Quantities mentioned in the BOQ are only indicative. GSL reserve the right to increase / decrease
strength of labourers as per the Production requirement. Increase in quantity up to 25% of contract
value shall be done by Subcontractor at short notice.
7. TAXES AND DUTIES:
A) The price quoted in Price Bid should exclude taxes and duties. GST / IGST @ prevailing rate will
be applicable. Presently GST / IGST rate for sub contracts is 18%.
D) All the procurement of Goods and Services shall be made only from GSTIN Registered Vendors.
E) Taxes and duties as applicable/agreed will be paid at actual, up to the contractual delivery date,
beyond which, hike if any, shall be borne by the Firm.
8. PERIOD OF CONTRACT :
The contract will be valid for a period of 12 months from the date of commencement of Contract. The
operation of contract will as and when required basis.
(a) 70% of the monthly bill for the work done shall be paid within 14 days from the date of
submission of bills on the basis of recommendation by the HOD of user Department, against
submission of following documents :
i) Performa Invoice for 100% value (excluding taxes) of provisional monthly bill of work
done with recommendation by Head of user Department and dealing Outsourcing officer
for payment for 70% value.
(b) Balance 30% of the actual monthly work completion bill of monthly bill shall be paid within
30 days of receipt of work completion certificate and certification by Production /User
department against submission of following documents :
i) Invoice for 100% value (with taxes for 100% value) of actual work done minus 70%
monthly advance paid duly certified by Head of user Dept
ii) Certificate of Payment duly certified by Head of user Dept/Authorised rep of production
dept. of the project along with Attendance report.
iii) ESI/PF and other labour law clearance certificate signed and stamped by GSL HR&A
dept in GSL format.
iv) GST paid challans if applicable
Note 1:
a) If bidder is not eligible for exemption from submission of EMD as per clause 4.3 above an
EMD of Rs. 1,70,000/- must accompany the tender.
d) GSL stamped receipt for the EMD paid by the tenderer against the tender (in case of DD or
banker’s cheque) may be obtained from accounts officer cash section, within a week’s time
after tender opening, and the same will have to be produced by the firms while claiming the
refund of the EMD from GSL.
e) No interest is payable by GSL on EMD.
f) EMD shall be forfeited by GSL in the following event:
i) If tender is withdrawn by the tenderer during the validity period or its extension thereof.
ii) If a tenderer, who’s tender, has been accepted and contract / work order has been
awarded, fails to honor the contract.
iii) The “Letter of Award " is issued and tenderer withdraws his tender or fails to undertake
the job before issuance of subcontract work order / contract.
iv) Firm accepts the rate during PNC meeting and fails to undertake the contract.
a) In case of subcontract awardee, security deposit of 5% of the annual value of ARC (excluding
value of additional requirement), in the form of a Crossed Demand Draft / Bankers cheque /
Bank Guarantee of any nationalized/scheduled Bank drawn in favour of Goa Shipyard Ltd.,
Vasco-da-Gama, Goa, to be submitted to GSL, within 21 days of receipt of subcontract work
order or letter of award. The BG should have a claim period of 03 months from the date of
expiry of BG. Also in case of enhancement of contract amount, security deposit for enhanced
value having guarantee liability shall be submitted within 21 days of issuing work order / letter
of award.
The contractor shall deposit Security Deposit immediately after receipt of letter of award of
work or as per the prescribed time limit mentioned in the LOA/ Rate contract, in case delay in
submission of Security Deposit beyond stipulated time period, late fee with interest charges @
PLR of SBI plus 2%, of performance guarantee amount, for the delayed period, will be
deducted from pending bill of the contractor.
b) In case of extension of rate contract beyond contractual period, Security deposit validity and
claim period to be extended accordingly.
c) In case of successful tenderers, EMD will be returned back to the subcontractor after
submission of security deposit to GSL as explained at Sr. a, while in other cases, it shall be
refunded within 30 days of finalisation of order.
d) This deposit shall be subsequently refunded to the tenderer after successful Completion of the
contract. No interest is payable by GSL on late refund
a) Firm to ensure supply of required number of manpower as per the contract. In case of
absenteeism, LD will be applicable beyond five times in a month and more than 10% on any
working day.
The tenderer shall not be eligible to participate to this tender enquiry where it has been determined by
GSL that the tenderer is engaged in corrupt or fraudulent practices. Firms that are black listed and
removed from GSL Approved Vendor/Contractor’s list or with whom business dealing has been
banned or kept on vendor holiday will not be eligible to participate in the tender. The bid, if received,
from such firms/bidders will not be considered. During tendering process or during the execution of
contract if it is found that the documents submitted by the bidders are unauthentic / fake / forged/
misleading, then the bid of such bidder will be rejected, GSL reserves the right to debar such vendor
and stop them from participating in future tenders and will refer the case to MSME (if applicable) and
intimate other DPSUs for debarment as per policy in vogue.
Bidder may withdraw a bid submitted already, if he wishes before the bid submission end date and
time, however tender withdrawal after bid submission end date and time is not permitted. Similarly
failure to sign contract or failure to submit security deposit will be viewed seriously. GSL will take
appropriate punitive action in such cases and will inform MSME authority as applicable.
21. INDEMNITY:
The Tenderers shall indemnify Goa Shipyard limited, against any or all liabilities, legal financial or
otherwise, which may arise during the currency of the order / contract as a result of the same due to
non compliance of the aforesaid standard Terms and conditions or otherwise.
22. ATTENDANCE:
Subcontractor must install biometric attendance machine for day to day attendance of their labour at
main entrance / Specified location, and attendance machine generated attendance only shall be
verified by production officer on daily basis and same shall be submitted along with bill. GSL may
audit biometric attendance machines data periodically. GSL also reserves right to provide alternate
arrangement for attendance. Cost of machine should be included in the quoted rates.
23. COST OF TENDERING:
The tenderer shall bear all costs associated with the preparation and submission of its tender, and
GSL will in no case be responsible or liable for those costs, regardless of the conduct or outcome of
the tendering process including cancellation of this tender process.
------------------------------------------------------
Signature and Seal of the Tenderer
ANNEXURE – IV
1. EXECUTION OF THE CONTRACT: The contract will be valid for a period of 12 months from
the date of commencement of Rate Contract. The operation of contract will be as and when
required basis.
4. LABOUR HIRE
a) Claims: The Tenderer's workmen or employees shall under no circumstances be deemed
to be in our employment. They shall be duly insured against all accident etc, and GSL
shall have no liability in this regard. The tenderer shall hold himself fully responsible for
any claim or claims which they or their heirs / dependents or personal representative may
have and / or may make for any damages or compensation for any things done or omitted
to be done by the said tenderer, in the course of carrying out the work under the contract,
whether arising on Company’s premises or elsewhere. The tenderer shall indemnify the
company against and or all, such claims, if made against GSL, and for all the costs as
between attorney & clients of the proceedings, suits or actions, which GSL may incur in
respect of the same.
b) Labour acts:
The Tenderer shall comply fully with all central and state labour laws including but not
limited to: ESI Act. 1948; provident fund Act and Scheme 1942; Labourers Family
pension Scheme 1976; Gratuity act 1952, inter state Migrant workmen Act 1979,
(Regulations of employment and conditions of service), Bonus Act. 1965, contract Labour
Act 1970 (Regulations & abolition) and all the acts related to contract labour as amended
from time to time and rules made there under.
e) Payment of wages:
The tenderer shall deposit the wages in respective bank account of his employee.
Subcontractor shall pay wages of workers employed by expiry of 7th day of succeeding
month and ESI & PF by expiry of 15th day of succeeding month
f) Every contractor shall maintain (a) Muster Roll (b) Register of Wages (c) Register of
Deductions (d) Register of Overtime (e) Register of fines (f) Register of Advances (g)
Wages slip and bank transfer details respectively.
g) Subcontractor shall submit register of wages, register of attendance & bank transfer
details on or before 15th and ESI/PF ECR/PF sheets and payment confirmed sheet on
or before 20th of every month to the HRA Dept & OS Dept. in compliance with Contract
Labour Regulations and Abolition Acts , ESI & PF act.
5. GENERAL SAFETY
a) Standard of Safety:
The standard of safety to be observed in the company shall be decided by the Safety
Officer or any officer appointed for this purpose. Before the commencement of work in
the Yard, the tenderer shall ascertain the standard precautions required to be observed
in discharging his duties as per the standard prevalent in GSL, from the said officer. The
decision of the said Officer or any officer appointed on his behalf shall be final and
binding on the Tenderer.
b) Safety Precautions:
The Tenderer shall observe all safety precautions in connection with the work to be
performed by him, his agents or employee. In the event of any accident taking place in
the yard, resulting in a loss of life or otherwise damaging any part of the property, the
tenderer shall be required to make good the said loss to “GSL”, and shall be responsible
for any or all the consequences that follow from such loss and/ or injuries to the person
involved in such an accident.
c) General Safety Rules are enclosed at ANNEXURE VII.
6. MEDICAL FITNESS OF SUBCONTRACTORS EMPLOYEES:
The subcontractors shall ensure following.
(a) All the employees deployed by the contractor at GSL shall have to undergo the
complete medical checkup by agencies empanelled / registered with inspectorate of
factories and certificate of medical fitness shall be submitted to Health and safety
Department under intimation to contract operating authority and tendering Dept. within
a month from award of contract. As far as possible, such medical checkups to be
undertaken at the time of induction/appointment itself by contractor and regularly
monitored by contractor. The cost of fitness certification shall be borne by the
concerned subcontractor. GSL will issue gate pass to subcontractor employees only on
submission of medical fitness certificate.
(b) Further, medical fitness certificate shall be periodically renewed from time to time as
required by Health and safety Department of GSL.
(c) The contractor shall ensure that only medically fit personnel and “No person below 18
years of age or who has crossed retirement age of 60 years” are employed in the GSL
Premises for the work.
(d) Contractors shall ensure that First Aid Boxes are provided at the work spot and they
shall ensure proper medical care of injured persons
(e) Workers with contagious diseases and unhygienic/unhealthy habits shall not to be
deployed.
7. WORK TIMINGS:
The GSL timings are from 8.30 a.m. to 16.30 p.m. with lunch break of half an hour (1230 hrs to
1300hrs) on Monday to Saturday and 8.30 a.m. to 12.30 p.m. on 5th Saturday if any. The 2nd
and 4th Saturdays are non working days for GSL. The sub-contractor's timing will also be
adjusted according to GSL timings. However subcontract employees if called on 2 nd, 4th & 5th
Saturdays then will be paid rates of normal working days and not the rate of Sundays and
holiday. Due to the nature of work, it may not be feasible to allow the subject work to progress
continuously if it interferes with the other production work. The subject work shall be done if
necessary during overtime, nightshift, Sundays/holidays if instructed by contract operating
authority. Sub contractor should be prepared and ready to execute the job on such
circumstances. If some working day is declared holiday, or some non working day of GSL is
declared working day then subcontractor will be intimated accordingly and will have to adjust
working / non working day accordingly.
The subcontractor shall work in general shift (08:30 hrs to 16:30 hrs) however at times
depending upon the requirement subcontractor have to deploy his workmen & supervisor in
second shift (1600hrs to 2400hrs) as per yard requirement.
Please note followings for the second shift.
a. No canteen facilities will be provided by GSL for the second shift. Subcontractor has to
make his own arrangement for dinner for his personnel.
b. Dinner break will be from 2000hrs to 2100hrs.
c. No overtime will be provided for the second shift. However if GSL requires, the
workmen & supervisor have to continue the work after 24.00hrs which will be treated as
over time
d. Subcontractor should ensure that none of his personnel are staying in GSL premises
after 2400hrs. (If they have authorized to work only up to 2400hrs.)
e. Any person on the 1st shift should not be deployed continuously on the same day in the
second shift.
f. In case there is no requirement for 2nd shift, subcontractor may be asked to deploy his
personnel for the 1st shift.
12. SUPERVISION:
The Tenderer shall be responsible to have adequate supervision over the work carried out by
him.
13. UNIFORM:
The tenderer shall ensure that uniforms issued by him are worn by his employee and for the
purpose of easy identification the same shall be different in colour & shade from GSL workers
uniform. The GSL will provide identity passes to Tenderers employee/Workers.
14. CANTEEN:
The Tenderer’s Employees/Laborers, if required, will be provided with meals in GSL Canteen
against payment. The Tenderers shall pay Rs 25/ - per meal for each person. Increase in price
of meal as and when brought into force shall be borne by the tenderer. In the event of any of
Tenderer's employees found taking meals in the GSL canteen on subsidized coupon, the
Tenderer shall be liable to pay Rs 100/-per person to GSL.
15. PERFORMANCE:
GSL shall have right to short close the contract without any financial implications on GSL., if the
performance of the subcontractor is not satisfactory OR subcontractor doesn’t pay minimum
wages to workers on time OR subcontractor do not comply with on time payment of ESI, PF
contributions OR subcontractor do not comply with statutory requirements.
16. TERMINATION OF RATE CONTRACT:
GSL shall have right to terminate the contract by giving a notice of 15 days if the performance of
the contractor is not satisfactory OR subcontractor doesn’t pay minimum wages to workers on
time OR subcontractor do not comply with payment of on time, ESI, PF contributions OR
subcontractor do not comply with statutory requirements . And such termination shall not have
any financial implications on GSL. Further, the EMD amount/Security Deposit furnished by the
contractor will stand forfeited.
Contract resulting from this tender will be treated as an individual contract, shall not allow any
general lien to you and shall not get prejudice in execution due to any situation arising out of
some other contract that you may have with GSL.
GSL will not pay any compensation for any idle time claimed from the subcontractor for their
work force.
19. SECRECY:
Firm shall not divulge any information about our drawings, documents, specifications etc.
concerning this enquiry / order to any other party.
20. ARBITRATION:
(i) In the event of any question, dispute or differences arising under the agreement resulting
from this tender or in connection therewith, (including a dispute relating to the validity or
existence of this Agreement), the parties agree to settle the same amicably by mutual
discussions within a period of 90 (Ninety) days of service of a written notice from either party to
the other parties, referring/raising the dispute, to resolve the dispute in good faith.
(ii) If the parties failed to resolve the dispute within the aforesaid period of 90 (Ninety) days, then
by consent of Parties, it is agreed that Chairman & Managing Director of Goa Shipyard Limited
(GSL) shall appoint a Sole arbitrator to adjudicate the disputes. The Arbitrator so appointed
shall have neither direct or indirect, past or present relationship with or interest in any of the
disputing parties or in relation to the subject matter in dispute; whether financial, business,
professional or other kind whatsoever. The Arbitration & Conciliation Act, 1996 and the
amendments thereto shall be applicable. The arbitration shall be governed by the laws of India
and the language of arbitration shall be English. The award of the Arbitrator shall be final and
binding on the parties.
(iii). Upon any and every reference for the award, as aforesaid, the cost of the proceedings
including all expenses incidental thereto, shall be determined at the discretion of the arbitrator.
(iv) The seat and venue of the arbitration proceedings shall be Vasco-da-gama, Goa or such
other place, as the arbitrator may decide.
21. AWARD OF CONTRACT IN CASE OF TIE SITUATION:
In case of Tie situation arising on account of more than one bidders emerging as L1, the
following methodology shall be adopted for awarding of contract :
(a) If any bidder emerging L1 is MSE bidder, preference will be given to MSE bidder and
whole contract may be awarded to MSE bidder with due approval, provided the price
is within GSL estimate and L1 MSE bidder is competent enough to execute the order.
PNC may be conducted with L1- MSE bidder to achieve cost effectiveness.
(b) Further, in case, all L1 bidders are MSEs or Non MSEs then spot PNC will be
conducted and reduced price in sealed envelope will be obtained. Sealed envelope
will be opened in presence of Internal Auditor , PNC members and all L1 reps.
Contract may be awarded to L1 bidder arising after spot PNC, with due approval from
CFA. No representation by bidders will be entertained after finalization of contract.
Notwithstanding above, GSL shall keep right reserve to reject all the bidders and proceed with
re-tender/cancellation with CFA approval.
22. JURISDICTION:
The Purchase Order / contracts shall be governed under the Indian Laws and the Courts in
India shall have the exclusive jurisdiction for enforcement of Award.
Contractors, contract workers and visitors will not be permitted to carry mobile phone with
provision of camera inside GSL. Violation of this will attract suitable administrative action
against immediate employer/ contractor. Also entry permit of defaulter will be revoked.
Contractors shall not engage employees working with other subcontractors working for GSL.
The contractor can engage such employee if other subcontractor gives no objection certificate
to its employee and apply for revocation of gate pass made by HRA Dept of the concerned
employee. The subcontractor engaging such employee without permission is liable for penalty
including termination of contract and forfeiture of security deposit. Also penalty can be imposed
if it is found that employees mentioned by subcontractor on documents submitted to GSL (such
as wage register, attendance sheet, any other statutory payment document) are not working
with them.
a) The tender shall observe all safety precautions in connection with the work to be
performed by him, his agents or employee. The safety rule mentioned at ANNEXURE VII
& self protection gears shall be strictly adhering for your workers working at GSL. If non
compliance observed, is liable to be penalized. In the event of any accident taking place
while working, resulting in loss of life or otherwise damaging any part of the property, the
tenderer shall be required to make good the said loss to “GSL”, & shall be responsible for
any or all consequences that follow from such loss and / or injuries to the person involved
in such an accident.
c) The successful contractor should be ready for any addition / deletion of the part of jobs
from their scope of work while executing the contract.
------------------------------------------------------
Signature and Seal of the Tenderer
ANNEXURE – V
(Rupees…………………………………………………………………Only)
Full Name
Designation
ANNEXURE VI
BANK GUARANTEE FOR EMD
This Deed of Guarantee is made on this _____ day of _______(Month)______ (Year) BY-
____________
____________________________, a Banking Company established under the Banking
Companies (Acquisition and Transfer of Undertakings) Act, 1969 and having one of its branch at
________________________(hereinafter referred to as the “BANK” ) IN FAVOUR OF Goa
Shipyard Limited having its registered Office at Vaddem House, Vaddem, Vasco-da-Gama, Goa
– 403 802.
The expression “BANK” and “GOA SHIPYARD LIMITED” shall, unless repugnant to the context
or meaning thereof, mean and include their legal assignees, successors, representative etc.
WHEREAS:
1. Goa Shipyard Limited invited tenders for ________.
2. Under clause No______ of the Tender documents the Tenderer/Bidder is required to
furnish a Bank Guarantee towards the EMD amount specified in the tender, along with
the technical bid. M/s. _________________ (hereinafter referred as “the client”) intends
to submit the bid for the aforesaid tender in respect of which this Bank Guarantee is
given.
AND WHEREAS we ________________________________, banking corporation established
under the Banking Companies (Acquisition and Transfer of Undertakings) Act, 1969 having one
of its branch at __________________, do hereby unconditionally and irrevocably guarantee the
payment of Rs. ________________ (Rupees ____________________________only) towards
EMD amount to Goa Shipyard Limited in respect of the aforesaid tender.
2. We further confirm that any forbearance, delay or omission on the part of Goa Shipyard
Limited to exercise any right or remedy accruing to it under the letter of acceptance or
under any other applicable law shall not in any way release the Bank from its liability
under the Guarantee.
3. This Bank Guarantee shall be valid and remain in full force and effect for 120 days from
the due date of tender with an additional claim period of three months from the date of
expiry of validity period.
4. This Guarantee is unconditional and irrevocable till such time Goa Shipyard Limited
discharges this Guarantee by issuing a letter in this behalf.
5. Any variation in the letter of acceptance under/or concession made by Goa Shipyard
Limited to with/without informing the Bank shall not discharge this Guarantee and this
Guarantee shall be continuing one under all circumstances.
6. We undertake to pay the amount mentioned herein as principal debtor and not as surety
and it shall not be necessary for Goa Shipyard Limited to proceed against the (NAME OF
THE BIDDER) before proceeding against the Bank notwithstanding the fact that Goa
Shipyard Limited may have obtained or obtains from the (NAME OF THE BIDDER) any
other security which at the time when proceedings are taken against the Bank hereunder
is outstanding and unrealized.
7. We further undertake not to revoke this Guarantee during its currency except with the
previous consent of Goa Shipyard Limited in writing and agrees that any change in the
constitution of the Bank shall not discharge the liability of the Bank as mentioned herein.
8. The Courts of Goa shall have exclusive jurisdiction to adjudicate on any or all matters
arising under this Guarantee.
9. The Bank declares that it has the power to issue the Guarantee and the undersigned has
full power to do so.
IN WITNESS WHEREOF THE BANK HAS executed this Guarantee on the day, month and year
first above mentioned through its duly authorised representative.
WITNESSES:
1. These safety rules are promulgated for the guidance of the contractors. These rules in no way
relieve a contractor from his obligations under various statutory rules and regulations.
2. The contractor before starting any work in GSL premises will be issued with these rules and he
is expected to give a declaration that he received one copy of the GSL Safety rules for
contractors and will comply with the rules laid therein.
3. GSL reserves the right to suspend the work in the event the contractor if found not complying
with the rules or instructions with regard to safety practice for which no claims for
compensation of any kind will be entertained.
4. To ensure the safe conduct of safety operations a representative of the contractor shall
maintain appropriate contact with the officer in charge of the work as may be necessary to
acquaint himself with any changed conditions or other matters relating to the safety
performance.
5. All regulations, codes and ordinances of the Government of India, Govt. of Goa and local
Municipal Corporation regarding safety shall be applicable to the contractors.
6. The principal contractor is responsible for observance of these rules by his sub contractor’s
employees acceptable to GSL should be employed for the operation of any type equipment.
Contractor’s employees should not enter the areas where the nature of contracted work does
not require their presence.
7. The contractor is responsible for compliance of these rules by his contract workmen.
8. Only employee cleared by GSL shall be employed for the operation of any type of equipment
contractor’s employee shall not enter the place where the nature of contracted work does not
require their presence.
9. Any accidents occurring to contractor’s personnel must be promptly and immediately reported
by the contractors or his Rep. to the safety officer and manager Personnel and Admn. Within
one hour of occurrence of the accident in addition to the officer in charge of the work and this
shall be followed up by an accident report in the form prescribed by the company.
10. In the case of electrical accidents the report shall be made in accordance with rule 44A of
Indian electricity Rules 1956 and the form shall be in accordance with Annexure XIII to the
Indian Electricity rules 1956. The report shall be furnished to the Executive Engineer. Electrical
within 8 hours of occurrence of an electrical accident. Immediately on occurrence of an
electrical accident, the operator in the main receiving station shall be informed on the phone
and necessary instructions taken from him ( phone No. 2385 )
12. The storage handling and use of hazardous material in the yard must be approved by the
safety officer.
15. Excavations:
a) The area beneath overhead work shall be “roped off” and signs “Danger Men Working” above
shall be placed to warm the men moving below.
b) Excavations shall be protected by positional guards and visible warning lights shall be placed
both during day and night to warm approaching traffic. Precautions shall be taken top prevent
“cave-ins” of the excavations.
c) Proper and adequate timber shoring and bracing shall be provided to prevent sliding or slipping
of loosed or unstable soil, rock, or other material in excavated pits/ trenchers.
d) Undercutting or trenches and other excavations shall be avoided.
e) Excavated materials shall be put away from the edges of the excavated trench to avoid slipping
of the excavated material back into trench.
f) The contractors working in man holes or pits below the ground level shall acquaint himself and
advise his employee of the hazards of gas or liquid level and take proper precautions when
men are at work. The manhole cover shall be kept away from opening and a sign board placed
indicating “men at work” preferably with the stand of the sign board resting through the
manhole with board above the ground.
g) Open manhole shall be protected by adequate barricade. Manhole covers shall be replaced
promptly when work is suspended or completed.
16. Welding & Cutting:
(a) Only qualified employee under the supervision of a qualified supervisor shall be allowed to use
oxy acetylene equipment. The minimum qualification shall be ITI.
(b) Electric welding shall be carried out only by qualified welders under the supervision of a
qualified supervisor. The minimum qualification shall be ITI
(c) Welders shall be provided with and use adequate personal protective equipments while
working.
(d) Cylinders shall be secured in upright position.
(e) Wherever required, shielding to be carried cut during arc welding.
(f) Arc welding equipment shall be properly earthed. While welding it shall be ensured that no
equipment forms part of the ground return. Arc welding electrodes holder should be of fully
insulated type.
(g) Adequate precautions shall be taken during welding or gas cutting against hazards such as
electric shocks, burns, fumes fires explosion and arc eyes etc.
(h) Gauntlet gloves shall be worn while welding or gas cutting.
(i) Outer cloth worn shall be free from oil or grease
(j) Goggles or welder’s helmet shall be worn during welding.
(k) Barriers shall be erected to protect other persons in the vicinity from rays or electric arcs or
welding flames wherever required.
(l) Goggles shall be worn while chipping the welding stag.
(m) Adequate ventilation shall be provided while welding or cutting in confined spaces.
(n) When welding or gas cutting in elevated positions precautions shall be taken to prevent sparks
or hot metal slag falling out to the people or to the combustible and flammable material below.
(o) Before welding or cutting a pipe, tanks or container, which had carried flammable material, it
shall be thoroughly cleaned and gas-freed and if necessary “Hot work certificate” from the
Controller of Explosives shall be obtained.
17. Contractors shall ensure that First Aid Boxes are provided at the work spot and they shall
ensure proper medical care of injured persons.
21. Natural and synthetic fiber ropes shall be properly cared and the following precautions shall be
taken.
(i) Ropes shall not pass over sharp eDGes; pads shall be used to protect fibers.
(ii) Ropes shall not be dragged on the ground unnecessarily. Using too small sheaves shall be
avoided.
(iii) Ropes shall not be permitted to slip on winch drum or moving drums.
(iv) Kinked ropes shall not be used.
(v) Do not tie knots where splices shall be used.
(vi) Ropes shall not be allowed to soak in oil and exposed to acid or other corrosive substances.
They shall be washed and dried.
(vii) Ropes shall not be allowed to expose to weather unnecessarily.
(viii) When drying, excessive heat shall not be used.
22. Access and staging:
a) While working at heights, adequate scaffolding or staging shall be used.
b) While working at heights of 8 ft. and above, the workmen shall wear safety beltsfull body
harness with adequate life lines.
c) Scaffolding shall be of a sound material, securely fastened and shall be capable of
supporting 4 times the combined weight of men and material who may be working on them.
d) Wooden planks used in scaffolding shall not be less than 10” wide 2”thick and shall not
extend beyond the outer supports by more that 12” nor less than 6”.
e) Guarding and toe boards shall be installed in all scaffolding which are 8” or more in height.
f) Ladders shall be soundly constructed, securely fixed and lashed where necessary.
23 Loitering around operating units is prohibited at all times.
24. Bringing intoxicants in to the yard is strictly prohibited. Likewise entering the yard under the
influence of intoxicants is a serious offence.
25. Jumping on or off trunks, automobiles, cranes or other moving vehicle is prohibited. Men shall
wait until the vehicle stops before attempting to enter or leave.
26. In confined spaces workers shall be protected with air line respirators with tights fitting mask
(especially for painting etc).
27. It shall be considered hazardous to carryout gas cutting or welding work within 5-7 meters from
the piece where paint is being applied or stored.
28. Work place shall be sufficiently and suitably lighted.
------------------------------------------------
Signature and seal, of the Tenderer
ANNEXURE VIII
Mandate Form
1) Vendors/customer’s name:
Email Address of Vendor :
PAN Number of Vendor :
3 Date of effect:
I hereby declare that the particulars given above are correct and complete. If the transaction
is delayed or not effected at all for reasons of incomplete or incorrect information, I would not
hold the user institution responsible. I have read the option invitation letter and agree to
discharge the responsibility expected of me as a participant under the scheme.
(.....................................)
Signature of the Vendor
Date
Certified that the particulars furnished above are correct as per our records.
Bank’s Stamp
Date: (.................................)
Signature of the authorised official of the Bank
ANNEXURE IX
WHEREAS M/s.________ (Firm’s name), (hereinafter called the "Contractor" which term shall include
its heirs, successors, administrators and assigns) having their office at ___________ (Firm’s
address) have entered in to a contract / accepted the Work Order No. ________ dated ________
(hereinafter referred to as the "said Contract") for total value of Rs. ______________ placed by the
Company on terms and conditions provided in said contract.
AND WHEREAS in terms of the said contract the Contractor has agreed to furnish to
Company the security deposit amounting to Rs. ___________ i.e. 5% of the contract amount to
perform the contractual obligations and to cover the liability of the Contractor during the contract
period as stipulated in the contract. This guarantee shall be valid till completion of the entire work
and issuance of satisfactory work completion certificate by the Company.
AND WHEREAS the Surety at request of the Contractor has agreed to give this guarantee.
2. We, the Surety, further agree that the Company shall be the sole judge to decide
whether the Contractor has committed a breach of any of the terms and conditions
of the said contract and that the decision of the Company shall be final and binding
on the Surety.
3. The Company and the Contractor will be at liberty to carry out any modifications in
the said contract during the period of the said contract and / or during any extension
thereof, notice of such modifications to the Surety is hereby waved by the bank.
4. This Guarantee would come into effect from the date of its issuance as indicated
above and shall remain in full force and effect till the terms and conditions of the
contract have been fulfilled performed by the Contractor.
5. The Surety undertakes not to revoke this Guarantee during its currency except with
the previous consent of the Company in writing.
6. The Surety further agree that the liability and obligations of the Surety arising under
or by virtue of this guarantee shall not be discharged by any variation of the terms
and conditions of the said contract or extension of the time or any indulgence shown
by the Company to the Contractor.
8. The Surety declares that they have power to issue this Guarantee in your favour and
the undersigned has fully authority to issue the Guarantee granted by the Bank.
9. The Surety declare, agree and undertake to pay the amount demanded by the
Company in writing this Guarantee within a period of seven days from the receipt of
the letter / fax demanding the payment at our aforesaid address, irrespective of any
dispute or controversy with regard to the said contract between you and the said
Contractor.
10. NOT WITHSTANDING anything contained hereinabove our liability under this Guarantee is
restricted to Rs.__________ (Security deposit amount) This Guarantee shall be valid up
to __________ (Completion date of work order) (i.e. till completion of the entire work
and issuance of completion certificate) unless a suit or action to enforce claim under the
Guarantee is filled against us within 3 months from i.e. on or before ____________ (Date
after 03 months from work order completion date) all your rights under this Guarantee
shall be forfeited and we shall be relieved and discharge from all liability hereunder.
IN WITNESS WHERE OF THE (bank name) for and on behalf of the Surety has
signed this Deed on the day and year first above written
b. This guarantee shall be valid upto _______ (work order completion date) and the claim
period upto _______ (Date after 03 months from work order completion date)
c. We are liable to pay the guaranteed amount or any part there under this bank
guarantee and only if your serve us a written claim or demand on or before
________ (work order completion date) including the claim period if any this should be
on or before ________ (Date after 03 months from work order completion date)
including the claim period if any this should be conterminous with
the period of bank guarantee.
IN WITNESS WHEREOF THE BANK HAS executed this Guarantee on the day, month and
year first above mentioned through its duly authorized representative.
WITNESSES:
1.
2.
Annexure X
The bidders are requested to fill the below format and upload it on the portal for scrutiny.
The original financial documents towards EMD & bankers solvency certificate along with
copy of duly filled confirmation chart should reach GSL on OR before due date of the tender.
6 GST Number
The bidders are requested to fill the details only for applicable qualification category, in line with conditions specified at Annex II. Documents
listed in corresponding category & uploaded on the portal should be the same and only such documents will be considered for evaluation.
This format along with experience documents is to be uploaded on the portal for scrutiny.
(i) One completed order for the work specified in Annex II costing not less than Rs.66.75 lakhs
Work Order Execution schedule as Work Order Description of the work Work Order value Work completion
No & Date per the Work order placed by Certificate (WCC) Ref
No. & date
(ii) Two completed orders for the work specified in Annex II costing not less than Rs.41.70 lakhs each
Work Order No Execution schedule as Work Order placed Description of the work Work Order value Work completion
& Date per the Work order by Certificate (WCC) Ref
No. & date
(iii) Three completed orders for the work specified in Annex II costing not less than Rs.33.35 lakh each
Work Order No Execution schedule as Work Order placed Description of the work Work Order value Work completion
& Date per the Work order by Certificate (WCC) Ref
No. & date
(iv) Multiple orders (2 or more) for the work specified in Annex II completed in a continuous span of 12 months totaling to Rs.41.70 Lakhs
Work Order Nos, Execution schedule as Work Order Description of the work Work completion Commencement &
Date & value per the Work order placed by Certificate (WCC) completion date as
Ref No. & date per WCC
We confirm that the experience details specified above are authentic to the best of our
knowledge. In the event if documents are not found genuine, than the bid submitted is
liable for rejection.
Full Name
Designation
Annexure XI
(I/we hereby have understood above points agree to comply the same)
------------------------------------------------
Signature and seal, of the Tenderer
COMPLIANCE MATRIX (Page2)
FOLLOWING POINTS TO BE COMPLIED BY BIDDERS WHILE SUBMISSION OF PRICE BID:
Sr Acceptance (Yes
Points for compliance by Bidder
No /No)
We hereby undertake to pay indicated Total of minimum wage including
statutory levies payment for each item wise including applicable statutory
levies amount mentioned in BOQ to the employees based on their
attendance on monthly basis without any delay.
We agree to pay & file the PF, ESI returns by 15th of succeeding month
8 and submit the challan & statement of return to HRA dept by 20th of
succeeding month.
We agree that at any time, if it is found that contractor had paid less than
min. wage and applicable statutory levies to their employee, the
9 respective amount will be recovered from bills and paid to employee/s by
invoking section 21(4) of the Contract Labour (Regulation and Abolition)
Act, 1970.
Applicable TDS will be deducted for the bills, respective TDS certificate
10
will be issued to the contractor.
Contractor shall note that the service charges (in Rupees) finalised at the
time of placement of order only will be paid throughout the contract
period even though service charges quoted is in %. Service charges
arrived in INR are fixed and firm for entire contract period.
The amount of service charges payable to contractor throughout the
contract period shall be calculated as follows:
Total of min. wage including statutory levies (amount in INR)
x Quantity x Service charges (in % )
(I/we hereby have understood above points agree to comply the same)
------------------------------------------------
Signature and seal, of the Tenderer
Declaration by MSE bidders availing EMD exemption (Page3)
Following declaration shall be submitted duly filled and signed by MSE bidders availing
EMD exemption
We, hereby confirm that aforementioned data is correct and we will not withdraw bid till the
finalisation of the contract. We have understood that we will be liable for rejection in case of false