PART 1 GENERAL 3
1.1 General requirements 3
1.2 Definitions 3
1.3 Requirements for manufacturers 5
1.4 Basic requirements for products inspection 6
1.5 Certificates/documents 7
1.6 Conditions for use of inspection marks 10
1.7 Invalidation, suspension and cancellation of approval certificate 10
PART 2 UNIT/BATCH INSPECTIONS 12
2.1 Application 12
2.2 General requirements 12
2.3 Drawing approval 13
2.4 Type test 13
2.5 Material test 14
2.6 Inspections 15
2.7 Issue certificate of products 15
PART 3 DESIGN APPROVAL 17
3.1 General requirements 17
3.2 Drawing examination 17
3.3 Prototype test and/or inspection 17
3.4 Certificate of Design Approval 18
3.5 Inspection for issuing the Marine Products Certificate 19
PART 4 TYPE APPROVAL 20
4.1 General requirements 20
(3) Design approval: means the process whereby permission is granted by VR for
the design to be used for a stated purpose under specific conditions, generally
comprising drawing approval and prototype/type test.
(4) Type approval: means the evaluation process whereby the manufacturer‘s
ability to produce consistent products in compliance with VR rules or other
acceptable standards is confirmed by VR through design assessment and
manufacturing assessment. Depending on the trustworthiness of quality
assurance as shown by manufacturing assessment.
(5) Manufacturers approval: means the evaluation process whereby the
manufacturer‘s production conditions and ability are confirmed by VR through
documentation review, approval testing and verification of manufacturing
process.
(6) Type test: means testing of the sample as defined in (9) below including its
materials and components by a specified method for confirming compliance
with all requirements of designated standard(s) or technical specifications. The
type test may be a destructive test in special cases.
(7) Prototype test: means testing and measurement of the prototype as defined in
(8) below including its materials and components for evaluating the product
design. The prototype test may be a destructive test.
(9) Sample: means a representative product used for test/inspection. The selected
sample is to be, in respectto performance, characteristics and manufacturing
quality, capable of representing or covering the products or product series to be
inspected.
(10) Inspection: means the verification, examination and test carried out by the
Surveyor for items required by VR rules before commencement and/or during
process and/or after completion of production.
(11) Final testing: as an inspection method means all acceptance tests recorded in
the products certificate.
(12) Applicant: means an organization applying for an inspection of products by VR.
An applicant may be a manufacturer, an agency or a design institute.
(13) Audit: means a systematic and independent examination to determine whether
quality activities and related results comply with planned arrangements and
whether these arrangements are implemented effectively and are suitable to
achieve the stated objectives.
(14) Periodical audit: means an audit for confirming continued compliance with the
certificate of type approval or the certificate of manufacturers approval.
components and parts should be certified, the related suppliers and their
products are to be approved and/or inspected by VR.
1.4 Basic requirements for products inspections
1.4.1 The products required by VR rules are, prior to their use or installation on ships
classed with VR or during their manufacturing, to be inspected according to
relevant requirements to confirm compliance with VR rules, and an appropriate
certificate as specified in 1.5.2 is to be issued.
1.4.2 VR implements the following 3 modes of products approval:
(1) design approval;
(2) type approval;
(3) Manufacturers approval.
1.4.3 In addition to the products to be approved as specified in VR rules and/or
statutory requirements, the manufacturer may apply for approval of one or more
types of products for one or more of the following purposes:
(1) providing products of which the type approval is required by VR rules;
(2) avoiding repeated design approval for the same products;
(3) replacing the Surveyor by the manufacturer in carrying out a part of or complete
on-site inspections;
(4) desiring that his products be entered into VR Lists of Approved Marine
Products.
1.4.4 Where the products have been approved in one or more modes, the specified
unit/batch inspection requirements may be replaced with the following:
(1) reducing the inspection items requiring attendance by the Surveyor;
(2) verifying by the Surveyor of production and quality control information
provided by the manufacturer.
1.4.5 The manufacturers who achieve quality assurance by means of batch production
in a continuous process or completely based on production technology and
process, are to apply for manufacturers approval to demonstrate their conditions
and ability to produce the products.
1.4.6 The manufacturer is to make preparations for inspection and provide all
necessary conditions for inspection so as to ensure that the Surveyor is capable
of:
(1) having access to products for carrying out the specified inspection;
(2) witnessing specified tests of products on site;
(3) obtaining documents, records and information necessary for the inspection,
including information of suppliers of raw materials, components and parts.
1.4.7 The products, for which type approval or manufacturers approval is granted, are
to be produced at the manufacturer‘s production facilities stated in the approval
certificate, and VR does not accept any inspection of those approved products
which are subcontracted.
1.4.8 Where any harmful defect or damage is caused by raw materials or main
components and parts to approved products, the manufacturer is to promptly
inform VR of this and take one or more of the following measures:
(1) suspension of the manufacturing of such products, investigation and analysis of
the quality and the safety effects of such products installed onboard;
(2) termination of their use for approved products;
(3) re-evaluation of supplier(s);
(4) d isqualification of supplier(s).
Where the measure stated in (1) above is considered necessary by VR, the
approval will be suspended.
1.4.9 The nameplate, usage identification, usage/operation instructions and quality
certificate (including standards used as basis, product performance, quality
assurance, liability, etc.) of the products inspected by VR are to be in a
language specified by the ordering party, with at least an English or Vietnamese
translation in any case.
1.5 Certificates/documents
1.5.1 Approval certificates
(1) An appropriate approval of the product by VR is to be certified as follows:
(a) Certificate of Design Approval (DA) issued by VR, showing compliance
of the design with VR rules;
(b) Certificate of Type Approval (TA) issued by VR, showing that the design
complies with VR rules and that the manufacturer has the ability to
continuously produce in batches the products covered by the certificate in
compliance with rules and/or recognized standards;
(c) Manufacturers Approval Certificate (MA) issued by VR, showing that the
manufacturer has the ability to produce the products required by VR
rules.
(2) The Certificate of Design Approval cannot replace the Certificate of Type
Approval or Certificate of Manufacturers Approval. Where a products
(10) any other condition identified by VR for which suspension of the certificate is
necessary.
1.7.3 VR will cancel the certificate within the period of its validity when VR
identifies that one of the following conditions exists at the manufacturer:
(1) the condition leading to suspension of the certificate has not been rectified
within the specified period, or suspension of the certificate has continued for 6
months;
(2) the products installed or used on board a ship classed with VR have been
produced at the facilities not stated in the certificate (including the approved
products being subcontracted or the approved products being produced by
another manufacturer under the same brand) without approval by VR;
(3) there was any fraud, falsification, intentional concealing of facts or any other
illegal conduct on the part of the manufacturer in seeking approval by VR;
(4) any serious nonconformity of the approved products is found during a
periodical audit;
(5) any other condition identified by VR for which cancellation of the certificate is
necessary.
2.1 Application
2.1.1 Unless provided otherwise, the unit/batch inspection procedure of this Section
applies to the products to be certified by VR.
2.1.2 Annex 1 of this Section is the List of Certification Requirements for Classed
Marine Products, as required for the ships classed with VR.
2.1.3 Annex 2 of this Section is the List of Certification Requirements for Statutory
Marine Products, as required for the statutory services delegated to VR.
2.1.4 Appendix 3 of this Section is the List of Certification Requirements for Lifting
Appliances, as required for the issue of certificates relevant to lifting appliances
by VR.
2.2 General requirements
2.2.1 Unless specially considered by VR, the statutory products, classed materials,
and essential machinery and electrical equipment as specified in Annex 1, 2 and
3 are to be inspected after approval of such products (specific products are
given in the Lists). For the products of which the approval is not required in
these Appendices, VR will make an appropriate assessment of the production
capability and conditions of the manufacturer, when receiving his initial
application for unit/batch inspection, to determine whether or not to accept the
application.
2.2.2 In general, the procedure of unit/batch inspection consists of the following
process:
(1) examination of drawings and technical documents or keeping them for
information (hereinafter referred to as ―drawing approvalǁ), or prototype/type
test or measurement, for confirming compliance with VR rules or other
recognized standards;
(2) inspection and test during manufacturing and/or of final products for confirming
compliance with VR rules and/or approved design drawings;
(3) the Marine Products Certificate or an equivalent document is issued to the
products complying with relevant requirements.
2.2.3 For one or more products which have been approved by VR, the requirements of
2.2.2(1) and (2) may be simplified with respect to the unit/batch inspection
items requiring attendance by the Surveyor, and this may be dealt with
according to the approved inspection scheme.
2.2.4 Where type approval or equivalent information is available for the products to
be inspected, VR will assess the relevant information provided by the applicant
to determine whether a partial or full type test is needed.
2.3 Drawing approval
2.3.1 For each application for unit/batch inspection, the applicant is to prepare design
drawings and/or technical documents and submit them to VR for examination
or information according to the relevant requirements of the rules. The design
drawings and technical documents are to clearly state the requirements for the
design, material, manufacturing, performance and use of the products to be
inspected.
2.3.2 The applicant is to submit the following documents related to compliance
evaluation of the products (if applicable):
(1) Applicable technical standards;
(2) General description of the products;
(3) Design drawings and/or manufacturing drawings, including drawings, lists of
components, parts and materials, etc.;
(4) Design calculation results;
(5) Prototype and/or type test reports (if any);
(6) Inspection and test schemes and/or test programme and acceptance criteria;
(7) Main technological documents;
(8) Other documents required by VR.
2.3.3 Where the technical documents are found to comply with the relevant
requirements of VR rules upon examination, VR will issue a notification on
approval of drawings to the manufacturer, identify the approved status on the
submitted technical documents and return the approved drawings.
2.4 Type test
2.4.1 The products, of which type test is required by relevant Guidances of VR rules
and/or Annexs 1, 2 and 3 of this Guidance, are subject to type test when
unit/batch inspection of such products is requested.
2.4.2 The type test is to be carried out according to a test programme approved by
VR.
2.4.3 The type test sample is to be the prototype or a product of the same specification
and manufacture taken at random from the production line. In the latter case,
the sample is to be taken and specifically identified and if necessary, sealed up
in the presence of the Surveyor.
VIETNAM REGISTER - 2010 13
GUIDANCE FOR INSPECTION AND APPROVAL OF MARINE PRODUCTS CN 09E
3.3.2 If applicable and considered as a necessary process for design approval, the
prototype test is to be conducted by the manufacturer in the presence of the
Surveyor. The prototype test is to cover product performance, destructive, non-
destructive and environmental tests or other tests, as specified in VR rules and
guidelines, applicable standards or the manufacturer‘s technical requirements,
and the test programme is to be submitted to VR for approval.
3.3.3 The requirements for the prototype test report are to be in accordance with 3.2.4
of this Guidance.
3.3.4 If the required tests have been completed or are underway at an independent
testing organization accepted by VR, special consideration will be given to the
acceptability of any test results obtained not in the presence of VR Surveyor.
See also 2.2.4.
3.3.4 Certificate of Design Approval
3.4.1 Issue of the certificate
(1) Where the products have been assessed according to 3.3.2 and 3.3.3 of this
Section and found to comply with VR rules, guidelines and/or applicable
standards and/or the manufacturer‘s technical requirements, a Certificate of
Design Approval will be issued. Otherwise, the reasons for refusal of the design
will be notified to the applicant and the application for design approval
terminated.
(2) The products, of which the design has been approved, will be entered into VR
Lists of Approved Marine Products.
(3) The Certificate of Design Approval itself does not mean that the products have
been type approved. If type approval is intended, a manufacturing assessment is
to be carried out according to Section 4.
3.4.2 Maintenance of the certificate
(1) Where any change has been made to the design or any applicable standard of
the products, of which the design has been approved by VR, the applicant of the
initial design is to inform VR of this. VR will, according to the nature and
extent of the change, determine whether a new design approval is necessary.
Not informing VR of this will lead to invalidation of the Certificate of Design
Approval.
(2) Where any change to VR rules will affect the validity of the Certificate of
Design Approval, VR will inform the applicant of the initial design of this in
time and ask him to pay attention to any necessary change of the design, the
requirement for a new assessment and the fact that failure to do so will lead to
automatic invalidation of the certificate.
(1) the product design complies with the applicable requirements of VR rules
and/or other applicable standards;
(2) an effective specialized quality system for marine products is in place for
ensuring the quality control level required by the manufacturer.
4.3 Design assessment
4.3.1 The drawing examination is to be in accordance with 3.2, Part 3 of this
Guidance.
4.3.2 The type test is to be in accordance with 2.4, Part 2 of this Guidance.
4.3.3 Where the products, for which type approval is requested, have been design
approved by VR, the confirmation of the Certificate of Design Approval will
suffice. Where the type test for design approval was conducted without
attendance by VR Surveyor, a final test of product samples at manufacturershop
is to be performed in lieu of the type test.
4.4 Assessment of manufacturing
4.4.1 Audit and/or assessment of the quality management system
(1) The specialized quality system for marine products established by the
manufacturer is to be audited, verifying that the system is appropriate for the
products to be approved and the implemented system is capable of ensuring
compliance of such products with VR rules, guidelines and/or other acceptable
standards. If the manufacturer has a quality management system certified by a
State-approved certification body and at least complying with ISO 9001 or
equivalent quality management standards, the system is to be assessed by VR
for verifying compliance with VR requirements for specialized quality
management systems for marine products.
(2) The manufacturer is in particular to appropriately and sufficiently demonstrate
the following aspects so as to confirm the capability of the equipment used in
production, inspection and test and the ability of the personnel having influence
on product quality to meet the specified level of product quality consistently:
(a) capability and test conditions of inspection, test and measurement
equipment;
(b) inspection and test personnel;
(c) technologies and operators of essential processes;
(d) duties and qualifications of personnel performing quality inspection and
control;
Surveyor. The samples for inspections and tests are to be selected in the
presence of the Surveyor, with the number of samples being determined by the
Surveyor depending on the complexity, production scale and type of the
products.
4.6.2 Where the manufacturer is found to comply with the conditions for maintaining
the certificate at the periodical audit, a confirmation letter for the periodical
audit will be issued by VR.
4.7 Renewal audit
4.7.1 The renewal audit for the Certificate of Type Approval is to be carried out
within 3 months before the expiry date of the certificate. The manufacture is to
send a written application to VR and inform VR of any change to the product
design. VR is to:
(1) re-examine the drawings to check any change to the rules or standards
applicable to the design or specifications of the products;
(2) re-approve the test programme in case of any change;
(3) assess the manufacturing according to 4.4.
4.7.2 Where there is no change to the design, the type approval test may in general be
dispensed with and if necessary, VR may require a retest.
4.7.3 Where the manufacturer is found to remain in compliance with the conditions
for type approval upon check, a new Certificate of Type Approval will be
issued.
4.7.4 Where the above audit and assessment is not completed before the expiry date
of the certificate, the Certificate of Type Approval will be invalidated.
4.8 Change of approved products
4.8.1 The manufacturer is to supervise any change to the products or their
manufacturing process, inform VR of any major change and receive VR
assessment thereof.
4.8.2 Where any change is made to the design of the approved products and their
components and parts, materials used or manufacturing method and this affects
the main characteristics and features of the products or leads to any change of
any performance criterion of the products, a new type approval is to be carried
out.
(4) lists of suppliers of raw materials, main components and parts, submission to
VR for information;
(5) quality assurance system documents, including quality manual and quality
control procedure, information on main production, inspection and test
equipment;
(6) other valid documents, reports and certificates showing the applicant‘s ability to
manufacture the products and control their quality within the scope of approval.
5.2.2 VR examines the documents and information submitted by the applicant,
approves drawings and relevant technical documents of products and
manufacturing technologies as well as approval test programme and returns
them to the applicant.
5.3 On-site audit
5.3.1 After document review and with the approval test programme being agreed, the
Surveyor is to carry out an audit of the quality management system at the
manufacturer‘s production locations, as planned, to:
(1) confirm that the manufacturing and relevant control of products are in
compliance with the submitted documents and the applicable rules;
(2) check the organizational units within the approval scope of the applicant and
their interrelations, and human resources;
(3) confirm adequacy of main production equipment used in manufacturing the
products to be approved;
(4) confirm compliance, sufficiency and effectiveness of the specialized quality
management system;
(5) witness compliance of the manufacturer‘s inspection and test of his products;
(6) confirm the establishment and implementation of procedures and systems for
control of purchase and of selecting and evaluating suppliers.
5.3.2 For purchased materials and components, VR may, depending on their
importance level, require:
(1) an inspection at manufacturershops of the suppliers;
(2) appropriate tests.
5.3.3 Any nonconformity found during the audit is to be notified to the person in
charge from the manufacturer for remedial actions. Any remedial action for any
nonconformity is to be followed up for verification.
PHỤ LỤC 1: DANH MỤC YÊU CẦU KIỂM TRA VÀ CHỨNG NHẬN ĐỐI VỚI
SẢN PHẨM PHÂN CẤP
ANNEX 1: LIST OF CERTIFICATION AND INSPECTION REQUIREMENTS
FOR CLASSED MARINE PRODUCTS
Hồ sơ Kiểm tra đơn vị/ lô Kiểu công nhận Lưu ý
TT Tên sản phẩm Document Unit/batch inspection Approval mode Remarks
No. Product name
C/E W A T M S DA TA MA
Móc kéo
3.5 X – X X X X X O –
Towing hook
Tời kéo
3.6 X – X X X X X O –
Towing winch
(I) – GCN Công nhận
kiểu phải được trình
Phương tiện đo sâu cùng W
3.7 O X – X – – O O –
Souding installation (I) – Type Approval
Certificate to be
provided for W
Bơm và ống
5
Pumps and piping
Van dùng cho hệ thống ống cấp I và II, van có (I)
đường kính từ 300 mm trở lên dùng cho hệ
thống ống cấp III; van dầu hàng; van an toàn,
van phòng sóng (van tự động một chiều), van
thông biển, van thoát mạn và van áp suất chân
5.1 không) X – X X X X O X –
Valves for piping of Classes I and II, valves of
300 mm in diameter and over for piping of
Class III; cargo oil valves; safety valves, storm
valves, sea valves, outboard valves and pressure
vacuum valves)
Ống cấp I và II
5.2 X – – X – X – – X
Piping of Classes I and II
(II)- GCN công nhận
quá trình sản xuất phải
Ống cấp III trình cùng với W
O X – X – – – – X
Piping of Class III (II) - Works Approval
Certificate to be
provided for W
5.3
(II) - GCN Công nhận
Van và phụ tùng khác với 5.1 kiểu phải được trình
cùng W
Valves and fittings other than those under 5.1 O X – – – – – X –
(II) - Type Approval
Certificate to be
provided for W
Bơm
5.4 X – X X O X – X –
Pump
(II) - GCN Công nhận
kiểu phải được trình
Mối nối ống cơ khí (dùng cho ống cấp III) cùng W
5.5a Mechanical pipe joint (for use on piping of O X O X X – – X – (II) - Type Approval
Certificate to be
Class III) provided for W
Mối nối ống cơ khí (dùng cho ống cấp I và II) (I)
5.5b Mechanical pipe joint (for use on piping of X – X X – X – X –
Classes I and II)
Phương tiện đóng kín ống thông hơi (I)
5.6 X – X X – X – X –
Air pipe closing appliance
Nồi hơi và bình áp lực
6
Boiler and pressure vessel
Nồi hơi
6.1 X – X X X X – – X
Boiler
Thiết bị đốt nồi hơi
6.2 X – X X – X X O –
Boiler burner
Bộ tiết kiệm
6.3 X – X X X X – X –
Economizer
Thiết bị sinh hơi (trên 0,35Mpa)
6.4 X – X – – X O X –
Steam heated steam generator (over 0.35 MPa)
Thiết bị dầu nóng và nước nóng (dùng phục vụ
hệ động lực)
Thermal oil and thermal water units (for service
6.5 of propulsion machinery) X – X X X X X – –
Máy
7
Machinery
Tua bin khí
7.1 X – X X X X – X –
Gas turbine
Tua bin hơi
7.2 X – X X X X – X –
Steam turbine
Đường kính xylanh
động cơ dưới 320 mm
Động cơ diesel (theo lô)
7.3a X – X X X X – X – Engines of a cylinder
Diesel engine (in batches) diameter of below 320
mm
Thân máy
.1 X – – X X X – – X
Entablature
Trục khuỷu
.2 X – – X X X – – X
Crankshaft
Chỉ áp dụng M cho chi
Xylanh tiết chể tạo bằng thép
.3 X – – X X X – – X
Cylinder case M applicable only to
those made of steet
Bầu hâm
.4 X – X X X X – X –
Heater exchanger
Thanh truyền
.5 X – – X X X – – X
Connecting rod
Kết cấu hàn yêu cầu
kiểm tra NDT, GCN
Duyệt Kiểu phải được
Ống dầu cao áp trình cùng W
.6 O X X X X – – X –
Fuel injection pipe Welding structure
subject to NDT, Type
Approval certificate to
be provided for W
Turbocharger
.7 Tuabin tăng áp X – X X X X X O –
Bệ máy
.1 X – – X X X – – X
Bedplate
Thân máy
.2 X – – – X – – – X
Entablature
GCN Công nhận kiểu
Thiết bị xả nổ trên cửa các te phải được trình cùng W
.3 Crankcase door explosion relief device O X X X – – O X – Type Approval
Certificate to be
provided for W
Trục khuỷu
.5 X – – X X X – – X
Crankshaft
Thanh truyền
.6 X – – X X X – – X
Connecting rod
Động cơ có xy lanh trên
400 mm
Đầu chữ thập
.7 X – – X X X – – X Engines of a cylinder
Crosshead diameter of over 400
mm
Nắp xy lanh
.8 X – – X X X – – X
Cylinder cover
Gu dông liên kết thân bệ máy
.9 X – X – X X – – X
Tie rod
Bu lông trên/dưới thanh truyền
.10 X – – X X X – – X
Connecting rod upper/lower bolts
Bu lông ổ đỡ chính
.11 X – X – X X – – X
Main bearing bolt
Bu lông nắp xy lanh
.12 X – – X X X – – X
Cylinder cover bolt
Sinh hàn không khí
.13 X – X X X X – X –
Air cooler
Kết cấu hàn yêu cầu
kiểm tra NDT, GCN
Duyệt Kiểu phải được
Ống dầu cao áp trình cùng W
.14 O X X X X X – X –
Fuel injection pipe Welding structure
subject to NDT, Type
Approval certificate to
be provided for W
Vòi phun
.15 O X – – – – O O –
Fuel injector
Bơm dầu cao áp
.16 O – – X – X O X –
High pressure fuel pump
Tua bin tăng áp
.17 X – X X X X X O –
Turbocharger
Cảm biến hơi dầu
.18 Oil mist detector O X – – – – – X –
Piston
.19 X – – X X X – – X
Piston
Hộp số (từ 100 kW trở lên)
7.4a X – X X X X O X –
Gearbox (100 kW and over)
Hộp số (dưới 100 kW) (I)
7.4b X – – – – X O O –
Gearbox (below 100 kW)
VIETNAM REGISTER - 2010 32
GUIDANCE FOR INSPECTION AND APPROVAL OF MARINE PRODUCTS CN 09E
Thiết bị làm lạnh > 7,5kW (sử dụng cho tàu chở
hàng đông lạnh)
7.10 X – X X X X X O –
Refrigerating plant > 7.5kW (for refrigerated
cargo carriers)
Thiết bị điện và tự động
8
Electrical equipment and automation
Tổ hợp máy phát (50 kVA và lớn hơn)
8.1 X – X X – X – O –
Generating sets (50 kVA and over)
Máy phát (50 kVA và lớn hơn)
8.2 X – X X X X – X –
Generators (50 kVA and over)
Tổ hợp máy phát điện sự cố (50 kVA và lớn
8.3 hơn) X – X X – X – O –
Emergency generating sets (50 kVA and over)
Bảng điện sự cố
8.4 X – X – – X – – –
Emergency switchboard
Bảng điện chính
8.5 X – X – – X – – –
Main switchboard
Bàn điều khiển tập trung buồng máy (I)
8.6 X – X – – X – – –
Engine room central operating console
Bàn điều khiển tập trung buồng lái
8.7 X – X – – X – – –
Bridge central operating console
Biến áp (5 kVA và lớn hơn)
8.8 X – X X – X O X –
Transformers (5 kVA and over)
(I) - GCN Công nhận
kiểu phải được trình
Ắc quy cùng W
8.9 O X X X – X – X O (I) - Type Approval
Battery
Certificate to be
provided for W
(I) - GCN Công nhận
Công tắc phòng nổ kiểu phải được trình
cùng W
8.10a Explosion-proof switch O X X X – X – X – (I) - Type Approval
Certificate to be
provided for W
Đèn phòng nổ (I)
8.10b O X X X – X – X –
Explosion-proof light
Nguồn cấp, hệ điều khiển và cáp điện (I)
8.11 Power, control and communication cables and X – X X – X – – X
wires
(I) Động cơ ngoại cỡ và
động cơ dùng cho mục
đích đặc biệt sẽ được
Động cơ (50 kW và lớn hơn) xem xét riêng(I)
8.12a X – X X X X – X – Oversize motors and
Motors (50 kW and over)
special purpose motors
to be considered
otherwise
Ký hiệu:
1) A – Bản vẽ duyệt bởi VR; M – Vật liệu của sản phẩm phải được kiểm tra; S – Kiểm tra bởi đăng kiểm viên VR tại cơ sở chế tạo; T – thử kiểu
hoặc thử mẫu đầu tiên hoặc kiểm tra kiểu, nếu thính hợp.
2) C – Giấy chứng nhận sản phẩm do VR cấp; E – Giấy chứng nhận tương đương (Hồ sơ tương đương); W – Hồ sơ của nhà sản xuất;
3) X – Áp dụng; O – Không bắt buộc.
4) DA - Công nhận thiết kế; TA - Công nhận kiểu; MA - Công nhận cơ sở sản xuất
Symbols:
1) A – Drawing approval by VR; M – Materials of product are to be inspected; S – Inspection by VR Surveyor at the manufacturer’s premises; T –
Type or prototype test or type examination, as appropriate.
2) C – Marine Products Certificate; E – Equyvalent document; W – Manufacturer’s document;
3) X – Applicable; O – Optional.
4) DA – Design approval; TA - Type approval; MA – Manufacturer approval.
Ghi chú:
(I) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) của tổ chức được VR công nhận và cấp giấy chứng nhận sản phẩm (C) sau
khi kiểm tra hoặc thử sản phẩm.
(II) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) và giấy chứng nhận sản phẩm (C)
PHỤ LỤC 2: DANH MỤC YÊU CẦU KIỂM TRA VÀ CHỨNG NHẬN ĐỐI VỚI
SẢN PHẨM THEO LUẬT
ANNEX 2: LIST OF CERTIFICATION AND INSPECTION REQUIREMENTS
FOR STATUTORY MARINE PRODUCTS
Hồ sơ Kiểm tra đơn vị/ lô Kiểu công nhận Lưu ý
TT Tên sản phẩm Document Unit/batch inspection Approval mode Remarks
No. Product name
C/E W A T M S DA TA MA
Boong cấp A
1.8 X – – X – – – – X
Class A deck
Vách cấp A
1.9 X – – X – – – – X
Class A bulkhead
Vách cấp B (I)
1.10 X – X X – X – – X
Class B bulkhead
Trần cấp B (I)
1.11 X – X X – X – – X
Class B ceiling
Trang thiết bị và hệ thống dập cháy
2
Fire-extinguishing system and equipment
Hệ thống chữa cháy cố định
2.1 X – X X X X O X –
Fixed fire-extinguishing arrangement
(I) - GCN công nhận
Chất chữa chữa cháy (bọt) quá trình sản xuất phải
trình cùng với W
2.2 Fire–extinguishing medium (foam) O X – X – X – – X (I) - Works Approval
Certificate to be
provided for W
Lưu ý
Hồ sơ Kiểm tra đơn vị/ lô Kiểu công nhận
TT Tên sản phẩm Remarks
Document Unit/batch inspection Approval mode
No. Product name
C/E W A T M S DA TA MA
Hệ thống xử lý nước thải
5.6 X – X X – X – X –
Sewage treatment plan
Thiết bị nghiền
5.7 X – X X – X – X –
Comminutor
Thiết bị đốt chất thải
5.8 X – X X – X – X –
Incinerator
Thiết bị xử lý và ghi sau xả
5.9 Devices for processing and recording after X – X X – X – X –
discharge
GCN ngăn ngừa
Phát thải NOx cho động cơ diesel trên 130 kW ô nhiễm không
5.10 X – X X – X – X – khí
NOx emission of diesel engines of over 130 kW
EIPP Certificate
Thiết bị hàng hải, tín hiệu và liên lạc
6 Communication, navigation and signaling
equipment
Thiết bị VHF đàm thoại 2 chiều (I)
6.1 X – X X – X – X –
Two-way VHF radiotelephone apparatus
Thiết bị phát báo ra đa (I)
6.2 X – X X – X – X –
Radar transponder
Hệ thống truyền thanh công cộng (I)
6.3 X – X – – X – – –
Public address system
Máy thu NAVTEX hàng hải
6.4 X – X X – X – X –
NAVTEX receiver
Trạm thông tin vệ tinh INMARSAT
6.5 X – X X – X – X –
INMARSAT ship earth Station
Phao vô tuyến định vị sự cố
6.6 Emergency position–indicating radio beacon X – X X – X – X –
(EPIRB)
Thiết bị vô tuyến điện sóng trung/sóng ngắn
6.7 X – X X – X – X –
MF/HF radio installation
GPS (I)
6.8 X X X X – X – X –
GPS
Đèn hành hải và đèn tín hiệu (đèn mất chủ động, (II) - GCN Công nhận
kiểu phải được trình
đèn neo và đèn hạn chế hoạt động) cùng W
6.9 Navigation and signaling lights (Not–under– O X X X – X – X – (II) - Type Approval
command light, anchor light and restricted Certificate to be
provided for W
operation light)
(II) - Type Approval
Certificate to be
Thiết bị phát tín hiệu âm thanh provided for W
6.10 O X X X – X – X –
Audible signal generator (II) - GCN Công nhận
kiểu phải được trình
cùng W
Ký hiệu:
1) A – Bản vẽ duyệt bởi VR; M – Vật liệu của sản phẩm phải được kiểm tra; S – Kiểm tra bởi đăng kiểm viên VR tại cơ sở chế tạo; T – thử kiểu
hoặc thử mẫu đầu tiên hoặc kiểm tra kiểu, nếu thính hợp.
2) C – Giấy chứng nhận sản phẩm do VR cấp; E – Giấy chứng nhận tương đương (Hồ sơ tương đương); W – Hồ sơ của nhà sản xuất;
3) X – Áp dụng; O – Không bắt buộc.
4) DA - Công nhận thiết kế; TA - Công nhận kiểu; MA - Công nhận cơ sở sản xuất
Symbols:
1) A – Drawing approval by VR; M – Materials of product are to be inspected; S – Inspection by VR Surveyor at the manufacturer’s premises; T –
Type or prototype test or type examination, as appropriate.
2) C – Marine Products Certificate; E – Equyvalent document; W – Manufacturer’s document;
3) X – Applicable; O – Optional.
4) DA – Design approval; TA - Type approval; MA – Manufacturer approval.
Ghi chú:
(I) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) của tổ chức được VR công nhận và cấp giấy chứng nhận sản phẩm (C) sau
khi kiểm tra hoặc thử sản phẩm.
(II) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) và giấy chứng nhận sản phẩm (C)
PHỤ LỤC 3: DANH MỤC YÊU CẦU KIỂM TRA VÀ CHỨNG NHẬN ĐỐI
VỚI THIẾT BỊ NÂNG
ANNEX 3: LIST OF CERTIFICATION AND INSPECTION REQUIREMENTS
FOR LIFTING APPLIANCES
Document Kiểm tra đơn vị/ lô Approval mode
Tên sản phẩm Hồ sơ Unit/batch inspection Kiểu duyệt Remarks
No.
Product name Lưu ý
C/E W A T M S DA TA MA
Ký hiệu:
1) A – Bản vẽ duyệt bởi VR; M – Vật liệu của sản phẩm phải được kiểm tra; S – Kiểm tra bởi đăng kiểm viên VR tại cơ sở chế tạo; T – thử kiểu
hoặc thử mẫu đầu tiên hoặc kiểm tra kiểu, nếu thính hợp.
2) C – Giấy chứng nhận sản phẩm do VR cấp; E – Giấy chứng nhận tương đương (Hồ sơ tương đương); W – Hồ sơ của nhà sản xuất;
3) X – Áp dụng; O – Không bắt buộc.
4) DA - Công nhận thiết kế; TA - Công nhận kiểu; MA - Công nhận cơ sở sản xuất
Symbols:
1) A – Drawing approval by VR; M – Materials of product are to be inspected; S – Inspection by VR Surveyor at the manufacturer’s premises; T –
Type or prototype test or type examination, as appropriate.
2) C – Marine Products Certificate; E – Equyvalent document; W – Manufacturer’s document;
3) X – Applicable; O – Optional.
4) DA – Design approval; TA - Type approval; MA – Manufacturer approval.
Ghi chú:
(I) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) của tổ chức được VR công nhận và cấp giấy chứng nhận sản phẩm (C) sau
khi kiểm tra hoặc thử sản phẩm.
(II) VR có thể xem xét công nhận giấy chứng nhận công nhận kiểu (TA) và giấy chứng nhận sản phẩm (C)
ANNEX 4: CERTIFICATES
1/ Certificate of Marine Products (Form CP)
2/ Certificate of Design Approval (Form CDA)
3/ Certificate of Type Approval (Form CTA)
4/ Certificate of Manufacturer Approval (Form CMA)
CỤC ĐĂNG KIỂM VIỆT NAM CHỨNG NHẬN (các) sản phẩm sau đây đã được kiểm tra và phù hợp với
Hướng dẫn về kiểm tra và chứng nhận sản phẩm công nghiệp dùng cho tàu biển của Cục Đăng kiểm
Việt Nam.
VIETNAM REGISTER CERTIFIES THAT the following products have been inspected and are found in
compliance with the Guidance for Inspection and Approval of Marine Products of Vietnam Register.
01/2011
01/2011
- The End -
01/2011
CỤC ĐĂNG KIỂM VIỆT NAM CHỨNG NHẬN thiết kế dưới đây được thiết kế bởi nhà thiết kế nêu trong
giấy chứng nhận này phù hợp với Hướng dẫn về kiểm tra và chứng nhận sản phẩm công nghiệp dùng
cho tàu biển của Cục Đăng kiểm Việt Nam (sau đây gọi là “Hướng dẫn”).
VIETNAM REGISTER CERTIFIES that the following design designed by the designer statted in the
certificate are found in compliance with the Guidance for Inspection and Approval of Marine Products of
Vietnam Register (hereinafter refer to as “the Guidance”).
01/2011
Bản vẽ được duyệt và tính toán thiết kế/Approved Drawings and Design Calculations
Bản vẽ được duyệt số/Drawing Approval No.: VR 123456
Phạm vi sử dụng/Application
Sử dụng trên tàu thủy
- The End -
01/2011
01/2011
VIETNAM REGISTER - 2010 50
GUIDANCE FOR INSPECTION AND APPROVAL OF MARINE PRODUCTS CN 09E
CTA 1/3
CỤC ĐĂNG KIỂM VIỆT NAM
VIETNAM REGISTER
CỤC ĐĂNG KIỂM VIỆT NAM CHỨNG NHẬN sản phẩm dưới đây được sản xuất bởi cơ sở sản xuất nêu
trong giấy chứng nhận này phù hợp với Hướng dẫn về kiểm tra và chứng nhận sản phẩm công nghiệp
dùng cho tàu biển của Cục Đăng kiểm Việt Nam (sau đây gọi là “Hướng dẫn”).
VIETNAM REGISTER CERTIFIES THAT the following products produced by the manufacturer statted in
the certificate are found in compliance with the Guidance for Inspection and Approval of Marine Products
of Vietnam Register (hereinafter refer to as “the Guidance”).
Sản phẩn được công nhận/ Product Approved:
WD618
Cơ sở sản xuất/ manufacturer:
Giấy chứng nhận này có hiệu lực đến ngày: 25th November 2015
This Certificate is valid until:
với điều kiện phải được xác nhận hàng năm phù hợp với Hướng dẫn.
subject to annual endorsement in accordance with the Guidance.
Ngày ấn định đánh giá hàng năm: 25th November each year
Anniversary date:
Cấp tại: Ha Noi, Vietnam Ngày: 1st January 2011
Issued at Date
01/2011
Bản vẽ và tính toán thiết kế được duyệt/Approved Drawings and Design Calculation: CTA 2/3
- The End -
01/2011
VIETNAM REGISTER
Casting
Fixed Pitch Propeller - max. 2.4 m in diameter
Blades for Controllable Pitch Propeller - max 3.5 m in diameter
Material - Copper Alloy (Ni-Al-Bronze)
Giấy chứng nhận này có hiệu lực đến ngày: 25th November 2015
This Certificate is valid until:
với điều kiện phải được xác nhận hàng năm phù hợp với Hướng dẫn.
subject to annual endorsement in accordance with the Guidance.
Ngày ấn định đánh giá hàng năm: 25th November each year
Anniversary date:
Cấp tại: Ha Noi, Vietnam Ngày: 1st January 2011
Issued at Date
01/2011
Phạm vi áp dụng/Application:
- Nil -
Chân vịt bước cố định/Fixed Pitch Propeller – Đường kính lớn nhất 2,4m/ max. 2.4 m in diameter
Chân vịt biến bước/ Blades for Controllable Pitch Propeller - Đường kính lớn nhất 3,5m/max 3.5 m in
diameter
Vật liệu/Material – Hợp kim đồng/ Copper Alloy (Ni-Al-Bronze)
01/2011
VIETNAM REGISTER - 2010 55
GUIDANCE FOR INSPECTION AND APPROVAL OF MARINE PRODUCTS CN 09E