You are on page 1of 1

GURU RAGHAVENDRA INFRASTRUCTURES.

TIRUPATI

MCI 70 Control System Ver 3.1


SCHWING
Stetter
Docket / Batch Report / Autographic Record
Batch Date : 01-Nov-2020 Plant Serial Number: 3494
Batch Start Time : 12:03:21 PM
Batch End Time : 12:03:21 PM
Batch Number / Docket Number : 1157 Ordered Quantity : 0.00 M³
Customer : DBC CONSTRUCTIONS Production Quantity : 6.00 M³

Site : DBC CONSTRUCTIONS Adj/Manual Quantity : 0.00 M³


Recipe Code : DBC M25 With This Load : 0.00 M³

Recipe Name : M25 Mixer Capacity : 0.50 M³


Truck Number : TS25T1535 Batch Size : 0.50 M³

Truck Driver : RAJESH


Order Number : DBC CONSTRUCTIONS
Batcher Name : Stetter

Cement Water MS / ICE Admixture

12 MM SAND 40 MM 0 CEM-1 CEM-2 CEM-3 WATER 0 ADMIX1


Targets based on batchsize in Kgs.
205 340 0 0 175 0 0 90 +/- 0 1.00 0.00

Actual in Kgs.
205 313 0 0 175 0 0 100 10 0 0 1.00 0.00
205 305 0 0 175 0 0 100 10 0 0 0.97 0.00
205 300 0 0 175 0 0 100 10 0 0 0.97 0.00
205 300 0 0 175 0 0 100 10 0 0 0.97 0.00
205 300 0 0 175 0 0 100 10 0 0 0.97 0.00
205 317 0 0 179 0 0 100 10 0 0 0.88 0.00
205 308 0 0 174 0 0 100 10 0 0 0.95 0.00
205 336 0 0 174 0 0 100 10 0 0 0.96 0.00
205 348 0 0 174 0 0 100 10 0 0 1.05 0.00
205 339 0 0 167 0 0 102 12 0 0 0.98 0.00
205 409 0 0 174 0 0 102 12 0 0 1.21 0.00
205 377 0 0 182 0 0 102 12 0 0 1.15 0.00
Total Set Weight in Kgs.

2460 4080 0 0 2100 0 0 1080 0 0 12.00 0.00

Total Actual in Kgs.


2460 3952 0 0 2099 0 0 1206 0 0 12.05 0.00

You might also like