You are on page 1of 45

SkyHabitat_BLK7_FP_FA_1.1.

indd 1 3/28/12 10:18 PM


PART
HOUSE.
PART
CONDO.
ALL HABITAT

SkyHabitat_BLK7_FP_FA_1.1.indd 2-3 3/28/12 10:18 PM


SkyHabitat_BLK7_FP_FA_1.1.indd 4-5 3/28/12 10:18 PM
R
Location Map ANG MO KIO

ANG MO KIO AVE


3

PRIMARY SCHOOL O ANG


A Marymount Convent School MO
KIO
B Ai Tong Primary School AV
E1
SECONDARY SCHOOL
C Raffles Institution

Y
EXP
D Catholic High School
INTERNATIONAL SCHOOL

L
TRA
E Stamford American International School
B
N

CEN
F Australian International School

AD
PUBLIC FACILITIES I
D

RO
G Bishan Swimming Complex

N
H Bishan Stadium H

HA
BIS
I Bishan Sports & Recreation Centre
J Bishan Bus Interchange G
K Bishan MRT Station UP
PER
L Bishan Public Library

D
Bisha
TH n St

TR
reet
M Bishan Community Club OM 14 LORONG CHUAN
S
SO

UN
N Bishan Active Park N

YMO
RD
O Bishan Park
K J F

MAR
P MacRitchie Reservoir Q
SHOPPING AREA
Q Junction 8 M
BISHAN
L
R AMK Hub
S NEX
MARYMOUNT

AD
Bisha
n Stre

N RO
et 11

BISHA
P

A
BRAD
DELL R
D
E
LORNIE
RD

SkyHabitat_BLK7_FP_FA_1.1.indd 6-7 3/28/12 10:18 PM


Site Map Sky Bridges
Level 14 Level 26
1
1
2
3
3

F
P Q

Bi
06
C
sh 4
07
a 4

n
J BLK 7 08 09

St
F

re
N

et
H
03 02 01 M

14
J
F 8
5
04 6
05
B D 7
L E
G
Level 38
I BLK 9
10 11 12 13

K O

18 17 16 15 14

9
Bishan Street 15
A Guard House J Reflection Gardens Bus Stop 1 Karaoke Room
B Entry Court (Level B1) K Tennis Court 2 Reading/Games Lounge
C Lily Ponds L Leisure Pool 3 Party Room
D Water Wall M Children’s Pool 4 Sky Bridge
E Pool Island N 50 Meter Lap Pool 5 Outdoor Exercise Area
F BBQ/Party Lawn O Comtemplative Gardens 6 Gym
G Tennis Viewing Garden P Outdoor Exercise Space with Pool Showers 7 Screening Room
H BBQ/Social Areas Q Pedestrian Gate to Bus Stop 8 Function Room
I Children’s Play Area 9 Roof Top Lap Pool

SkyHabitat_BLK7_FP_FA_1.1.indd 8-9 3/28/12 10:18 PM


Distribution Chart
PH PH2 PH2 37th Storey
4BR PH1 PH1 36th Storey
C8-T C3 C3 C8-T 35th Storey
3BR
C7-T C3 C3 C7-T 34th Storey
2+1BR
C7-T C3 C3 C7-T 33rd Storey
2BR
D6-T C3 C3 D6-T 32nd Storey
1+1BR D6-T C3 C3 D6-T 31st Storey
Bs9-T As2 C3 C3 As2 Bs9-T 30th Storey
C8-T As2 C3 C3 As2 C8-T 29th Storey
C7-T As2 C3 C3 As2 C7-T 28th Storey
C7-T As2 C3 C3 As2 C7-T 27th Storey
Bs4-T Bs6 As3 D5-T 26th Storey
B7-T B2 As2 C3 C3 D2 B7-T 25th Storey
B7-T B3 As2 C3 C3 D2 B7-T 24th Storey
B6-T B2 As2 C3 C3 D2 B6-T 23rd Storey
Bs8-T B3 As2 C3 C3 D2 Bs8-T 22nd Storey
C6-T B2 As2 C3 C3 D2 C6-T 21st Storey
C5-T B3 As2 C3 C3 D2 C5-T 20th Storey
C5-T B2 As2 C3 C3 D2 C5-T 19th Storey
D4-T B3 As2 C3 C3 D2 D4-T 18th Storey
D4-T B2 As2 C3 C3 D2 D4-T 17th Storey
B5-T Bs3 B3 As2 C3 C3 D2 Bs3 B5-T 16th Storey
B5-T Bs3 B2 As2 C3 C3 D2 Bs3 B5-T 15th Storey
Bs6 Bs7 Bs6 D3 Bs7 Bs6 14th Storey
C4-T Bs5-T B3 As2 C3 C3 D2 Bs5-T C4-T 13th Storey
Block 7 C4-T Bs5-T B2 As2 C3 C3 D2 Bs5-T C4-T 12th Storey
C4-T Bs4-T B3 As2 C3 C3 D2 Bs4-T C4-T 11th Storey
C4-T Bs4-T B2 As2 C3 C3 D2 Bs4-T C4-T 10th Storey
C4-T Bs4-T B3 As2 C3 C3 D2 Bs4-T C4-T 9th Storey
06 07
C4-T Bs4-T B2 As2 C3 C3 D2 Bs4-T C4-T 8th Storey
08 09
C4-T Bs4-T B3 As2 C3 C3 D2 Bs4-T C4-T 7th Storey
03 02 01
C4-T Bs4-T B2 As2 C3 C3 D2 Bs4-T C4-T 6th Storey
05 04
C4-T Bs4-T B3 As2 C3 C3 D2 Bs4-T C4-T 5th Storey
C4-T Bs4-T B2 As2 C3 C3 D2 Bs4-T C4-T 4th Storey
C4-T Bs4-T B3 As2 C3 C3 D2 Bs4-T C4-T 3rd Storey
C4-T Bs4-T B2 As2 C3 C3 D2 Bs4-T C4-T 2nd Storey
C2-P Bs2-P C1-P D1-P Bs2-P C2-P 1st Storey
05 04 03 02 01 09 08 07 06

SkyHabitat_BLK7_FP_FA_1.1.indd 10-11 3/28/12 10:19 PM


1 1
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type C2-P Type Bs2-P


#01-06 #01-07
164 sqm 128 sqm

Type C2-P Type Bs2-P


#01-05 #01-04
156 sqm
138 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 12-13 3/28/12 10:19 PM


1 2
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type D1-P Type C1-P Type C4-T Type Bs4-T


#01-08 #01-09 #02-06 #02-07
207 sqm 145 sqm 130 sqm 120 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 14-15 3/28/12 10:19 PM


2 2
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#02-08 #02-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#02-05 #02-04
130 sqm 120 sqm

Type B2 Type As2 Type C3


#02-03 #02-02 #02-01
81 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 16-17 3/28/12 10:19 PM


3 3
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type C4-T Type Bs4-T


#03-06 #03-07
141 sqm 108 sqm

Type C4-T Type Bs4-T


#03-05 #03-04
141 sqm 108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 18-19 3/28/12 10:19 PM


3 4
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#03-08 #03-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#04-06 #04-07
130 sqm 120 sqm

Type B3 Type As2 Type C3


#03-03 #03-02 #03-01
83 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 20-21 3/28/12 10:19 PM


4 4
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#04-08 #04-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#04-05 #04-04
130 sqm 120 sqm

Type B2 Type As2 Type C3


#04-03 #04-02 #04-01
81 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 22-23 3/28/12 10:19 PM


5 5
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type C4-T Type Bs4-T


#05-06 #05-07
141 sqm 108 sqm

Type C4-T Type Bs4-T


#05-05 #05-04
141 sqm 108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 24-25 3/28/12 10:19 PM


5 6
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#05-08 #05-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#06-06 #06-07
130 sqm 120 sqm

Type B3 Type As2 Type C3


#05-03 #05-02 #05-01
83 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 26-27 3/28/12 10:19 PM


6 6
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#06-08 #06-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#06-05 #06-04
130 sqm 120 sqm

Type B2 Type As2 Type C3


#06-03 #06-02 #06-01
81 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 28-29 3/28/12 10:19 PM


7 7
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type C4-T Type Bs4-T


#07-06 #07-07
141 sqm 108 sqm

Type C4-T Type Bs4-T


#07-05 #07-04
141 sqm 108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 30-31 3/28/12 10:19 PM


7 8
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#07-08 #07-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#08-06 #08-07
130 sqm 120 sqm

Type B3 Type As2 Type C3


#07-03 #07-02 #07-01
83 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 32-33 3/28/12 10:19 PM


8 8
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#08-08 #08-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#08-05 #08-04
130 sqm 120 sqm

Type B2 Type As2 Type C3


#08-03 #08-02 #08-01
81 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 34-35 3/28/12 10:19 PM


9 9
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR

Type C4-T Type Bs4-T


#09-06 #09-07
141 sqm 108 sqm

Type C4-T Type Bs4-T


#09-05 #09-04
141 sqm 108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 36-37 3/28/12 10:20 PM


9 10
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#09-08 #09-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#10-06 #10-07
130 sqm 120 sqm

Type B3 Type As2 Type C3


#09-03 #09-02 #09-01
83 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 38-39 3/28/12 10:20 PM


10 10
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type D2 Type C3
#10-08 #10-09
167 sqm 116 sqm

Type C4-T Type Bs4-T


#10-05 #10-04
130 sqm 120 sqm

Type B2 Type As2 Type C3


#10-03 #10-02 #10-01
81 sqm 66 sqm 116 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 40-41 3/28/12 10:20 PM


11 11
Floor Floor

PH PH
4BR 4BR
Type C4-T Type Bs4-T
3BR 3BR
#11-06 #11-07
2+1BR 141 sqm 108 sqm
2+1BR
2BR 2BR
Type D2 Type C3
1+1BR 1+1BR
#11-08 #11-09
167 sqm 116 sqm

Type B3 Type As2 Type C3


#11-03 #11-02 #11-01
83 sqm 66 sqm 116 sqm

Type C4-T Type Bs4-T


#11-05 #11-04
141 sqm 108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 42-43 3/28/12 10:20 PM


12 12
Floor Floor

PH PH
4BR 4BR
3BR 3BR
Type C4-T Type Bs5-T
2+1BR 2+1BR
#12-06 #12-07 Type D2 Type C3
2BR 131 sqm 129 sqm 2BR
1+1BR #12-08 #12-09 1+1BR
167 sqm 116 sqm

Type B2 Type As2 Type C3


#12-03 #12-02 #12-01
Type C4-T Type Bs5-T 81 sqm 66 sqm 116 sqm
#12-05 #12-04
131 sqm 129 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 44-45 3/28/12 10:20 PM


13 13
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
Type C4-T Type Bs5-T
2BR 2BR
#13-06 #13-07
1+1BR 140 sqm 117 sqm 1+1BR
Type D2 Type C3
#13-08 #13-09
167 sqm 116 sqm

Type B3 Type As2 Type C3


Type C4-T Type Bs5-T #13-03 #13-02 #13-01
#13-05 #13-04 83 sqm 66 sqm 116 sqm
140 sqm 117 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 46-47 3/28/12 10:20 PM


14 14
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR
Type Bs6 Type Bs7 Type D3 Type Bs6 1+1BR
#14-06 #14-07 #14-08 #14-09
94 sqm 83 sqm 144 sqm 97 sqm

Type Bs6 Type Bs7


#14-05 #14-04
94 sqm 83 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 48-49 3/28/12 10:20 PM


15 15
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type D2 Type C3 2BR
1+1BR #15-08 #15-09 1+1BR
Type B5-T Type Bs3 167 sqm 113 sqm
#15-06 #15-07
121 sqm 98 sqm

Type B5-T Type Bs3 Type B2 Type As2 Type C3


#15-05 #15-04 #15-03 #15-02 #15-01
121 sqm 98 sqm 81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 50-51 3/28/12 10:20 PM


16 16
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
Type B5-T Type Bs3 Type D2 Type C3
1+1BR 1+1BR
#16-06 #16-07 #16-08 #16-09
111 sqm 98 sqm 167 sqm 113 sqm

Type B5-T Type Bs3 Type B3 Type As2 Type C3


#16-05 #16-04 #16-03 #16-02 #16-01
111 sqm 98 sqm 83 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 52-53 3/28/12 10:20 PM


17 17
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type D2 Type C3 2BR
1+1BR #17-08 #17-09 1+1BR
167 sqm 113 sqm
Type D4-T
#17-06
193 sqm

Type D4-T Type B2 Type As2 Type C3


#17-05 #17-03 #17-02 #17-01
193 sqm
81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 54-55 3/28/12 10:20 PM


18 18
Floor Floor

PH PH
4BR
4BR 4BR
3BR
3BR 3BR
2+1BR
2+1BR 2+1BR
2BR
2BR 2BR
1+1BR Type D4-T Type D2 Type C3
1+1BR 1+1BR
#18-06 #18-08 #18-09
183 sqm 167 sqm 113 sqm

Type D4-T Type B3 Type As2 Type C3


#18-05 #18-03 #18-02 #18-01
183 sqm 83 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 56-57 3/28/12 10:20 PM


19 19
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type C5-T Type D2 Type C3 2BR
1+1BR #19-06 #19-08 #19-09 1+1BR
170 sqm 167 sqm 113 sqm

Type C5-T Type B2 Type As2 Type C3


#19-05 #19-03 #19-02 #19-01
170 sqm 81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 58-59 3/28/12 10:20 PM


20 20
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type C5-T 2BR
Type D2 Type C3
1+1BR #20-06 1+1BR
#20-08 #20-09
160 sqm 167 sqm 113 sqm

Type C5-T Type B3 Type As2 Type C3


#20-05 #20-03 #20-02 #20-01
160 sqm 83 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 60-61 3/28/12 10:20 PM


21 21
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR
Type D2 Type C3 2BR
1+1BR #21-08 #21-09 1+1BR
167 sqm 113 sqm
Type C6-T
#21-06
140 sqm

Type C6-T Type B2 Type As2 Type C3


#21-05 #21-03 #21-02 #21-01
140 sqm 81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 62-63 3/28/12 10:21 PM


22 22
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type Bs8-T Type D2 Type C3 2BR
1+1BR #22-06 #22-08 #22-09 1+1BR
130 sqm 167 sqm 113 sqm

Type Bs8-T Type B3 Type As2 Type C3


#22-05 #22-03 #22-02 #22-01
130 sqm 83 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 64-65 3/28/12 10:21 PM


23 23
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type B6-T Type D2 Type C3 2BR
#23-08 #23-09
1+1BR #23-06 167 sqm 113 sqm
1+1BR
119 sqm

Type B6-T Type B2 Type As2 Type C3


#23-05 #23-03 #23-02 #23-01
119 sqm 81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 66-67 3/28/12 10:21 PM


24 24
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type B7-T Type D2 Type C3 2BR
1+1BR #24-06 #24-08 #24-09 1+1BR
108 sqm 167 sqm 113 sqm

Type B7-T Type B3 Type As2 Type C3


#24-05 #24-03 #24-02 #24-01
83 sqm 66 sqm 113 sqm
108 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 68-69 3/28/12 10:21 PM


25 25
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
Type B7-T
1+1BR 1+1BR
#25-06 Type D2 Type C3
99 sqm
#25-08 #25-09
167 sqm 113 sqm

Type B7-T Type B2 Type As2 Type C3


#25-05 #25-03 #25-02 #25-01
99 sqm
81 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 70-71 3/28/12 10:21 PM


26 27
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR 1+1BR
Type C7-T Type As2 Type C3
Type D5-T Type As3 Type Bs6 #27-06 #27-08 #27-09
#26-07 #26-08 #26-09 173 sqm 66 sqm 113 sqm
170 sqm 59 sqm 96 sqm

Type Bs4-T
#26-05 Type C7-T Type As2 Type C3
125 sqm #27-05 #27-02 #27-01
171 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 72-73 3/28/12 10:21 PM


28 29
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
1+1BR Type C8-T Type As2 Type C3 1+1BR
Type C7-T Type As2 Type C3
#29-06 #29-08 #29-09
#28-06 #28-08 #28-09 143 sqm 66 sqm 113 sqm
163 sqm 66 sqm 113 sqm

Type C7-T Type As2 Type C3 Type C8-T Type As2 Type C3
#28-05 #28-02 #28-01 #29-05 #29-02 #29-01
161 sqm 66 sqm 113 sqm
141 sqm 66 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 74-75 3/28/12 10:21 PM


30 31
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR 2BR
Type D6-T Type C3
1+1BR Type Bs9-T Type As2 Type C3 1+1BR
#31-08 #31-09
#30-06 #30-08 #30-09 199 sqm 113 sqm
136 sqm 66 sqm 113 sqm

Type Bs9-T Type As2 Type C3


#30-05 #30-02 #30-01 Type D6-T Type C3
131 sqm 66 sqm 113 sqm #31-03 #31-01
191 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 76-77 3/28/12 10:21 PM


32 33
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type D6-T Type C3 Type C7-T Type C3 2BR
1+1BR #32-08 #32-09 #33-08 #33-09 1+1BR
189 sqm 113 sqm 176 sqm 113 sqm

Type D6-T Type C3 Type C7-T Type C3


#32-03 #32-01 #33-03 #33-01
163 sqm 113 sqm
181 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 78-79 3/28/12 10:21 PM


34 35
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR Type C7-T Type C3 Type C8-T Type C3 2BR
1+1BR #34-08 #34-09 #35-08 #35-09 1+1BR
166 sqm 113 sqm 159 sqm 113 sqm

Type C7-T Type C3 Type C8-T Type C3


#34-03 #34-01 #35-03 #35-01
149 sqm 113 sqm 146 sqm 113 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 80-81 3/28/12 10:21 PM


36 37
Floor Floor

PH PH
4BR 4BR
3BR 3BR
2+1BR 2+1BR
2BR
Type PH1 2BR
1+1BR #36-08 1+1BR
254 sqm Type PH2
#37-08
341 sqm

Type PH2
#37-03
291 sqm
Type PH1
#36-03
237 sqm

SkyHabitat_BLK7_FP_FA_1.1.indd 82-83 3/28/12 10:21 PM


38 Specifications
Floor 1. FOUNDATION Common Areas Common areas
Reinforced concrete piles and/or bored piles and/or LIFT LOBBIES AT BASEMENTS AND 1ST STOREY: LIFT LOBBIES AT BASEMENTS AND 1ST STOREY:
raft footing Natural stone and/or plaster and/or skim coat with Natural stone and/or plaster and/or skim coat with
PH paint finish matching skirting
4BR 2. SUPERSTRUCTURE
3BR Reinforced concrete structure and/or steel structure TYPICAL FLOOR LIFT LOBBIES: TYPICAL FLOOR LIFT LOBBIES / CORRIDOR:
Homogeneous and/or ceramic tiles and/or plaster and/ Homogeneous and/or ceramic tiles with matching skirting
2+1BR
3. WALL or skim coat with paint finish
2BR INTERNAL WALL: SKY BRIDGES / SKY TERRACES:
1+1BR Reinforced concrete and/or brick/block wall and/or Staircases, Basement Carpark and Corridors: Natural stone and/or homogeneous and/or ceramic
dry wall partition Plaster and/or skim coat with paint finish tiles and/or pebble wash and/or timber deck and/or
Type PH2 part planting
EXTERNAL WALL: Note:
#37-08
341 sqm Reinforced concrete and/or brick/block wall - Wall finishes up to false ceiling height and on exposed STAIRCASES – BASEMENT 2 TO HALF LANDING
surfaces only. BETWEEN 1ST AND 2ND STOREY:
4. ROOF - No tiles behind kitchen cabinets, bathroom cabinets, Homogeneous and/or ceramic tiles with nosing tiles
FLAT ROOF: mirrors, behind and below long baths, and above
Reinforced concrete roof with appropriate heat false ceiling STAIRCASES – HALF LANDING BETWEEN 1ST AND 2ND
insulation and waterproofing system STOREY TO ROOF:
7. Finishes: Floor Cement sand paving with nosing tiles
5. CEILING Residential Units
Residential Units Living/Dining, Open Kitchen and Passageway 8. Windows
LIVING/DINING, OPEN KITCHEN, BEDROOMS, STUDY, Aluminum framed windows with tinted, clear or frosted
PASSAGEWAY, STORE (ST), UTILITY, YARD, BALCONY I) TYPES As, B, Bs, C AND D: glass where appropriate.
AND OPEN TERRACE: Homogeneous and/or ceramic tiles with matching skirting
Plaster and/or skim coat and/or ceiling board with 9. Doors
paint finish II) TYPE PH: Residential Units
Natural Stone with matching skirting MAIN ENTRANCE AND SECONDARY ENTRANCE:
KITCHEN, BATHROOMS, POWDER ROOM AND WC: Fire-rated timber door and/or aluminium framed
Ceiling board with paint finish UTILITY AND YARD: glass door
Homogeneous and/or ceramic tiles with matching skirting
Common areas BEDROOMS, BATHROOMS AND POWDER ROOM:
LIFT LOBBIES: Study Hollow core timber door
Ceiling board with paint finish I) TYPE As AND Bs:
Homogeneous and/or ceramic tiles with matching skirting STORE (ST):
BASEMENT CARPARK AND STAIRCASES: Hollow core timber door or cabinet door
Plaster and/or skim coat with paint finish BATHROOMS, POWDER ROOM, KITCHEN AND WC:
Homogeneous and/or ceramic tiles KITCHEN:
SKY TERRACE: Timber framed glass door
Plaster and/or skim coat and/or ceiling board with Bedrooms
paint finish I) TYPE As: YARD:
Homogeneous and/or ceramic tiles with matching skirting Aluminium framed glass door or hollow core
6. FINISHES: WALL timber door
Residential Units II) TYPES B, Bs, C, D AND PH:
LIVING/DINING, BEDROOMS, STUDY, PASSAGEWAY, Timber parquet with matching skirting or laminated UTILITY:
STORE (ST), UTILITY AND YARD: flooring with matching skirting Aluminium framed bi-fold door
Plaster and/or skim coat with paint finish
STORE (ST): WC:
OPEN KITCHEN: Same finishing as area outside Store Aluminium framed bi-fold door
Plaster and/or skim coat with paint finish and/or
homogeneous and/or ceramic tiles BALCONY, UNCOVERED BALCONY AND BALCONY, UNCOVERED BALCONY AND
OPEN TERRACE: OPEN TERRACE:
KITCHEN AND WC: Homogeneous and/or ceramic tiles with matching skirting Aluminum framed glass door
Homogeneous and/or ceramic tiles
Type PH2
38TH STOREY OPEN TERRACE AND STAIRCASE TO 38TH STOREY OPEN TERRACE TO COMMON
#37-03 MASTER BATHROOM: 38TH STOREY OPEN TERRACE: CORRIDOR:
291 sqm
Homogeneous and/or ceramic tiles and/or natural stone Homogeneous and/or ceramic tiles with matching Fire-rated metal door
skirting and/or pebble wash and/or timber deck
BATHROOMS AND POWDER ROOM: PRIVATE ENCLOSED SPACE (PES):
Homogeneous and/or ceramic tiles PRIVATE ENCLOSED SPACE (PES): Metal grille low gate
Homogeneous and/or ceramic tiles with matching
PRIVATE ENCLOSED SPACE (PES), BALCONY, skirting and/or part turfing Note:
UNCOVERED BALCONY, OPEN TERRACE, PLANTER (PL) Selected locksets and ironmongery shall be provided to
AND STAIRCASE TO 38TH STOREY OPEN TERRACE: PLANTER (PL): all doors
Plaster and/or skim coat with spray textured paint finish Cement screed with waterproofing
and/or paint finish

SkyHabitat_BLK7_FP_FA_1.1.indd 84-85 3/28/12 10:21 PM


10. SANITARY FITTINGS Note: f) Barbecue / Party Lawn Note:
Residential Units - The brand type and colour of wares, fittings and accessories g) Children’s Play Area - The layout / location of wardrobes, kitchen cabinets, - Marble and granite are natural stone materials which
MASTER BATHROOM are subject to Architect’s selection and availability. h) Function Room fan coil units and all electrical points are subject to offer no absolute uniformity in their veins, colour,
I) TYPES As, B, Bs AND C (WITHOUT LONG BATH): - Storage shelves and/or drawers will be provided in all i) Karaoke Room Architect’s sole discretion and final design. tonality and pattern as these are natural characteristic
Solid surface vanity top complete with 1 wash basin and bathrooms and powder room except WC, but will vary j) Gymnasium - The choice of brand and model of fittings, equipment, arising from their varied mineral composition and
basin mixer, in design depending on unit type. k) Reading / Games Lounge installation and appliances supplied shall be at the sole impurities. Natural fissure lines, fossils and pigmentation
- 1 shower screen complete with shower mixer set, - 1 bib tap will be provided for washing machine. l) Screening Room discretion of the Vendor. can appear on the surfaces of polished marble and
- 1 water closet, m) Party Room - Regular maintenance by the Purchaser of the air- granite being a result of the formation process. While
- 1 paper roll holder, 11. ELECTRICAL INSTALLATION n) Steam Room conditioning systems, including the cleaning of the such material can be pre-selected before installation,
- 1 towel rail, Refer to Electrical Schedule for details o) Sky Bridge with water feature filters and condenser pipes is essential for efficient this non-conformity cannot be avoided. Granite tiles are
- 1 mirror p) Sky Bridge with landscape feature running and prolonging their operating life. pre-polished before laying and care has been taken
- For the web portal of the Housing Project, the Purchaser for their installation. However granite, being a much
12. TV / TELEPHONE q) Roof Top Lap Pool
II) TYPE C (WITH LONG BATH): will have to pay for annual fees, subscription fees or any harder material than marble cannot be re-polished after
Refer to Electrical Schedule for details
Solid surface vanity top complete with 1 wash basin and such fees to the service provider of the portal as may be installation. Hence, some differences may be felt at the
18. ADDITIONAL ITEMS
basin mixer, appointed by the Developer or Management joints. The tonality and pattern of the marble or granite
Note: (a) Kitchen
- 1 long bath complete with bath and shower mixer set, Corporation when it is formed. selected and installed shall be subject to availability.
- The developer shall endeavour to procure that a service I) TYPES As, B AND Bs:
- 1 shower screen complete with shower mixer set, - No soil materials or plants are provided to most planters. - Timber strips are natural materials containing veins and
provider for cable television or internet services (“Cable Kitchen cabinets complete with solid surface worktop,
- 1 water closet, Any provision shall be at the sole discretion of the Vendor tonality difference. Thus it is not possible to achieve
Services”) provides necessary cabling or connection from single bowl stainless steel kitchen sink and mixer tap,
- 1 paper roll holder, and maintenance by the Purchaser shall be required. total consistency of colour and grain in their selection
its network to the Housing Project so as to enable that electric hob (only for open kitchen) or gas hob, electric
- 1 towel rail, - Maintenance by the Purchaser of any planting at open and installation.
the Housing receives the Cable Services. In the event, hood and microwave oven (only for Types As and B) or
- 1 mirror terraces, including trimming, fertilizing and irrigating is - Glass is a manufactured material that is not 100% pure.
despite reasonable efforts being made by the developer, oven (only for Type Bs) Nickel sulphide impurities may cause spontaneous glass
essential for normal plant growth.
the developer is unable to procure any service provider - Regular maintenance of mechanical ventilation system breakage in certain pieces of tempered glass.
III) TYPES D AND PH: to provide the said cabling or connection, thereby II) TYPES C, D AND PH: to bathrooms /powder rooms/ WC / selected kitchen
Solid surface vanity top complete with 2 wash basins and resulting in there being no Cable services available in the Kitchen cabinets complete with solid surface worktop, by the Purchaser is essential for its efficient running and
basin mixers,
Housing project (including the Unit), the developer shall single bowl stainless steel kitchen sink and mixer tap, prolonging its operation and life span.
- 1 long bath complete with bath and shower mixer set,
not be liable to the purchaser for any inconvenience gas hob, electric hood and oven
- 1 shower screen complete with shower mixer set,
compensation damages costs fees expenses or losses
- 1 water closet,
whatsoever by virtue of the purchaser being unable to (b) Wardrobes:
- 1 paper roll holder,
obtain the Cable services in the Unit. Wardrobes provided to all bedrooms
- 1 towel rail,
- Purchaser is liable to pay for annual fee, subscription fee
- 1 mirror
or any such fees to the relevant service provider or any (c) Shoe Cabinets:
other relevant authorities for the service and/or 1 Shoe cabinet provided in each unit
OTHER BATHROOMS:
connection. The developer is not responsible to make
Solid surface vanity top complete with 1 wash basin and
the arrangements with the service provider for the (d) Security and access:
basin mixer,
service connection to the Individual apartments. - Audio Intercom System provided in each unit
- 1 shower screen complete with shower mixer set,
- Card Access System in all lift cars and pedestrian gates
- 1 water closet, Electrical Schedule
13. LIGHTNING PROTECTION - Automatic Car Barrier System
- 1 paper roll holder,
Lightning Protection System shall be provided
- 1 towel rail, Unit Type Light Power Fridge Cooker Cooker Oven Microwave Washing Dryer Tel Point TV Point Data Audio Bell Point
in accordance with Singapore Standards SS 555 (e) Air-Conditioning: Point Point Point Hood Hob Point Point Oven Machine Point Point Intercom
- 1 mirror
Parts 1-4: 2010 Single/multi-split air conditioning system Point Point Point
• Wall mounted fan coil unit for Living/Dining, Study
POWDER ROOM: As 8 13 1 1 1 - 1 1 - 4 2 3 1 1
14. PAINTING and all Bedrooms (Types As, B, Bs, C and D)
Solid surface vanity top complete with 1 wash basin and tap,
a) External Wall • Concealed ducted fan coil unit for Living/Dining and B 11 17 1 1 1 - 1 1 - 4 3 3 1 1
- 1 water closet,
- 1 paper roll holder, Spray textured paint finish and/or paint finish to wall mounted fan coil unit for all Bedrooms (Type PH) Bs 12 19 1 1 1 1 - 1 - 5 3 4 1 1
- 1 hand towel rail, designated area
(f) Hot Water Supply: C 17 22 1 1 1 1 - 1 1 5 4 4 1 1
- 1 mirror
b) Internal Wall Hot water supply to kitchen and all bathrooms except D 22 26 1 1 1 1 - 1 1 6 5 5 1 1
WC: Paint finish for WC, Powder room and Yard PH 25 26 1 1 1 1 - 1 1 6 5 5 1 1
- 1 water closet,
- 1 wash basin with tap, 15. WATER PROOFING (g) Gas Supply: Note:
- 1 shower set, Waterproofing shall be provided at bathroom, powder Town gas supply to kitchen where gas hob is provided 1. Isolator shall be provided accordingly to the no. of condensing units for each apartment.
- 1 paper roll holder room, kitchen, yard, WC, balcony, uncovered balcony, 2. Isolator shall be provided accordingly to the no. of water heaters for each apartment.
open terrace, PES, planter and reinforced concrete (h) Datapoint: 3. Visitor call panel shall be provided for basement and first storey lift lobbies.
OPEN KITCHEN: flat roof. Data outlet points complete with Category 6 or
- 1 sink with tap other appropriate cabling in Living/Dining, Study and
16. DRIVEWAYS AND CAR PARK all Bedrooms
KITCHEN: Basement car parks and driveways shall be of reinforced
- 1 sink with tap concrete finish with floor hardener and/or epoxy coating. (i) A/C Ledge:
- 1 water point for refrigerator (only for Types C, D and PH) Surface driveway /drop-off point shall be of stone finish Metal railing and/or RC parapet wall
and/or pavers.
YARD: (j) Private Enclosed Space (PES), Balcony, Uncovered
- 1 sink with tap 17. RECREATIONAL FACILITIES Balcony, Open Terrace, Planter (PL) and Yard:
a) 50m Lap Pool Metal Railing and/or RC parapet wall and/or brick wall
PRIVATE ENCLOSED SPACE (PES), BALCONY, b) Leisure Pool and/or perforated parapet wall DEVELOPER: Bishan Residential Development Pte Ltd (ROC:201024057E) Developer’s LICENCE NO.: C0853 LOCATION: Lot 16900T Mk 18 at Bishan Street 14/15 TENURE: 99 years wef
UNCOVERED BALCONY AND OPEN TERRACE: c) Children’s Pool 30 May 2011 BUILDING PLAN NO.: A1267-00002-2011-BP01 dated 8 December 2011 and A1267-00002-2011-BP02 dated 17 February 2012 EXPECTED DATE OF VACANT POSSESSION:
- 1 bib tap d) Tennis Court (k) Square planter at Open Terrace: 28 February 2016 EXPECTED DATE OF LEGAL COMPLETION: 28 February 2019
e) Reflection Garden Soil, Tree and Shrubs

SkyHabitat_BLK7_FP_FA_1.1.indd 86-87 3/28/12 10:21 PM


JOINTLY DEVELOPED BY

Enquiries +65 6826 6800 www.skyhabitat.com.sg

SkyHabitat_BLK7_FP_FA_1.1.indd 88 3/28/12 10:21 PM

You might also like