You are on page 1of 27
Pile No. P-17024/9 /2017-RC( EFMS:356945) Government of India Ministry of Rural Development Department of Rural Development Rural Connectivity (RC) Division Keishi Bhawan, New Delhi Dated: 20° December, 2018 To, Soe The Chief Additional Secretary (PWD) ae”. cveae Shimla-171002. Subject: - Clearance of Batch-I, 2018-19 under Pradhan Mantri Gram Sadak Yojana (World Bank RRP-II) reg:- Tam directed to refer to the project proposals sent by the Government of Himachal Pradesh under PMGSY (World Bank RRP-II) Batch-I 2018-19, considered in Empowered Committce Meeting held on 24.10.2018 2. On the basis of the recommendation of the Empowered Committee and substantial compliance by the State, the Ministry hereby accords clearance for the proposal with revised cost as per summary given below Item Stage-I | Stage-11 | Comp | Upg | LSBs Total WValue in Rs ae Fi ; in ak 843.72 ace 5874 | 84.84 6.08 88.66 | 25.40 (With GST) io. of Road 219 Roads & = b 2 09 rile 1 24 4 154 09 ESE . : a 1393.43 Km & in 1.295 or | 14135 27. 73m ILength inKm | 80.295 | 143 mT 1027.92 | 465.75, eA its [Average cost per aa lkm/m (Rs.tn | 73.15* | so0s- | wosir | szar | 3a? * With GST each) /m IHabitations [1000+ : 1 No, 500 -999 : 06 Nos, 250-499: 22 Nos ,16 Clusters of 250+ MoRD/State [ORD Share : Rs 731.38 Crore State Share: Rs. 112.34 Crore IShare OMMAS based road list along with the abstract is enclosed. 4 The above sanction is accorded subject to the following conditions Sample DPRs of New Technology roads be scrutinized including «least 1 for each IRC Accredited technology, should rate analysis at ~NRIDA before tendering. The state should enter into Memorandum of Understanding (MoU) between NRIDA, Technology Provider and SRRDA for the roads sanctioned using new materials /IRC Accredited materials as per new technology initiative guidel ‘Yours faithfully, Enclosures: OMMAS based road list with District wise abstract. Fo pe Ao a < en Do opy to: PS to Hon'Sle Minister (RD)/ PS to Hon'ble MoS RD/Se PPS t6 Secreary OD) SSAPA/PPS to ASRD)/PPS9}SRO. — Yo }21]/P +e (5) _ Bory also: Director (Technical), NRIDA with a request to ensure the compliance of the conditions in the clearance letter.’ — Yo8t2!]18 G6) 7) Da a Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract tate: Himachal Pradesh Sanction Year 2018-2019 Seo. Distr Woot Wore z 3 # 9 7 a 7 3 u Roads Total 28 2 2 Bridges Total ° “rand Total 8 Batch: 1 Collaboration : Word Bank ARPA) oad Length (hoe) rie Length oats 119.05 msi0 1 Hers 10.40 3955 v5.0 as 770 Fr) 108.765 393.430 10.250 239.000 Fr) 465.750 “Total Raed Length 1393430 oe ‘ora ts Length 65.750 re Mono cost | tate Cost Rs | Total Gost | Maint. Cost | Habs 1000s, 300+, 250s, <250, Total) sts) us) sles) | “Lae . ‘ 7 . ° Road Proposals esna an 786 1010.95 (154,16, 21,2) 1198027 iam) AT) .a5n8 @,41,28,27,8) 388 51 7905 Cotas) SST 6.2.2, 51,@) 94957 sao «1080.97, 376.30 6.27, 8, 61,18) 6575 731 100.50 ©,0,1,0,0 2388.40 165.39 218) @,3,0,0,5) wear 28a arin 16,34, 35,20) aan 357.96 324 12,11, 1a 875 war ©.2,1,0,3) 435402 ia Bee 2.9.3.2, 16) ons 291492 1580 58 (297,19, 18,66) 71004.58 10,747.35 1831.97) 9,876.13 (2, 99, 177, 226, 328) ‘Long Span Bridge Proposals 1083.18 wos 1353.56 000 99.98 ia TAs 7) : 06 an + or) 20522, «447.082,500.30 0.00 : TaAR780 140344784 37RAT, «ATG. —«2, 98, 177, 206, 528) ae DR Uriel RAL Paty Secretary ARG EIT Government of ina mit RTs Farsa/Mo Rural Development A war PEeKsh Bhawan, Now Dery Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter ‘Sanction Letter No :P-17024/9/2017-RC Sanction Da ‘State : Himachal Pradesh Sanction Year: 2018-2019 Batch oration : World Bank (RRP-I) Sr. | Core | Name of Road /Bridge | Category Road fie) 7 | Caring | Stage Cone. | CD Work | MoRD Cort Hetwork No, (Woy Tecology Bridge ts) Way Width (Nos) (RS Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 1 2 3 4 5 6 7 8 ° 10 Road Proposals District Bilaspur ‘Block: Bilaspur Sadar 1 L153 |L153-Kandrour to Bagari—_Upgarde 9.555 3.750, Complete 11 561.30 2 L159 —L1S9-Barmana to Salnoo —_Upgarde 3.000, 3.750, Complete 2 194.73 3 L054 LOS4-Brahampukhar to Upgarde 11,300 3.750 Complete 7 7. Shai 4 1056 L056-Deoth to Lagghat ——_Upgarde 8.000, 3.750 Complete 3 46.7 51.86 518.59 5 LOTT \LOTT-Swarghet to Jeori—_Upgarde 9.500, 3.750 Complete 8 54m h.86 Pattan Block Bilaspur Sadar Total 41.355 31 BAB 275.70 2,756.91 Block: Gehrwin 6 L103 /L103-Bachhretu to Naghiar—Upgarde CC BLOCK 5.000, 3.000 Complete 1 256.38, 8a) (84.87 7 LOY LO79-Karlata to Kherian Wew Cold Mi 5.000 3.750 Complete | 7 38133838) ‘Technology -BR/> Gbion Walt Page 1 of 24 © norated On: 20/12/2018 10:55 AM IM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter S| Cove) Wame of Rnd Bdge Catgory | New [Road (kms) /| Carrie | Stage Cont. | CO Work | MoRD Cont | State Cnt | Total Cont [Mat Cont | Habs (10006, H Network No. uy ‘Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, & tength a 1 2 3 4 5 ‘ 7 2 ° 10 "1 2 8 4 \ig 8 L093 —_LO93-Theh to Buhad Upgarde | CC BLOCK 14.100, 3.000, Complete | 6 72928255 SAT oa reer “
Goion oo ‘Wall as 9 tom \opecangontonliom — Upsude | CC BLOCK 18.000 3.000/ onpiete m0 ao z E Block Ghevn Tt 2.100 Rw man Bara z Al Block: Ghumarwin 10 UmR8 [at Benoa to Rawarroad Upgurde | CC LOCK 90005500) Complete 708.98 5750) etka EE Ti) Lose O82 Gta to Kah Uppene _coatoex 4100, 3.000) Compete mai ta) ak Ste Gin wal 12 LOM \OrO-attatoworsinghi —_Upenrde CC BLOCK 11970) 5300) Complete 5 wen wOs3 1 13) Ost OstHarog to Gra Upgrde “4000, 3.000 Complete 0 aan a 14 W063 063TraunratoDabla «Upped cCaLOCK 2000 —=3750 Complete «=CSSCOC«MGSSCw AS ir oon wat Block Ghumarwin Total 36.170 Cases sna? 2,681.56 District laspur Total 119.628 7 6ana tanao Tan District: Chamba Block Bharmour 15 Los2—/LOS-Karemuk to Dna 3500-3000 Saget ==CSSSCSC SCG SCS) SSC«N 0, ‘Mindra Road 16 TOL TOY-Knaramukh Nayagraon road 4,000, 3.500, Complete 40 2086.13 231.79) «2,317.92, 301.3300, 47 TO2—_TO2-Bharmour to Harsar 13.000, 3.500, Complete 1 7414 7490|—=—C*7HH.04| «87.3800, 6,6, 12) road Page 20124» Gonmated On: 2012-2018 10:5 A OH Se.| Core | Name of Road / Bridge Network No. 1 2 3 18 LOSS LOS5-Urai to Ghator Road Block Bharmour Total Block: Chamba 19 L031 | LOB1-Chaned Bhanota road 20 Loz —Lo24-Chamba Saru road 21) L046 LO46-Haripur to Nana road 20 L090-Drada to Seru oad 2 LOS LOPS-Sach Fetehpur oad 24 O27 —LOZT-Kehidi to Chtbanglow road 25 L068 —_LOGBLink road to Ghargram 26 L067 —_LO67-LInk road to Sanoutha Block Chamba Total Block- Mehla 27 L034 | L034Kiri to Lagga oad 2% WR LOS2-Sahu to ie road Page 3 ofie4 Category wu New Upaarde Upaarde New New New New New New Upaarde Upnarde Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Hew [Road (ms) 7 | Crag | Stage Cost. [CO Work | MoRD ost | State Coat | Total Cost Maint. Cost Techntoey Brag its) Way Wath (oo) "elas | felac) | elas) flac) ; reat 5 ‘ 7 2 ’ 10 1" 2 8 =| .73 Gbion Wall 4000 3.000, Sime Wl M058 a0. 0, 0,1,08), DEE aia ‘| 30085) 300.00) 3asas8 ava.r11@ ae : Bade eee AS “Gbion Wall 4.000/3.500/ Complete | 4 18.57 aie = BEE: 4000 3.750) Complete 3 ow MA OO Ee % E 100, 3.00, Stage Bol ta) ow)e.1,0,0.0 Fe bin Wal 2700) 3000) Saget) 365 Wess 0.00/@ 0,052.2) bin Wal 350) “3000 Saget WH 3541 —~—~000/0,0,1,0,1) 1900, 3.000, Suge 357—« G4 @,0,0,0,0 7300, 3000, tage aretha aio 3.000) Stage war) 3739 31.860 a was 200.6 385) 3500 Complete ASCO) Ta bin Wal 5.000) 3.500) Complete || ~~*2I7AT—~«AH| «R08 —«*.AT @,2,0,0,2) So Tecaany Generated On : 20/12/2018 10:55 AM ‘Mie Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr.| Core Name of Road /Bridge | Category ‘Stage Const. | CD Work | MoRD Cost | State Cost | Total Cost Maint. Cost | Habs (1000+, Network No. wu) (os) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 1 2 5 4 8 ° 10 1" 2 2 L023 L023-Chamba to Ghatrer_—Upgarde Complete 30 B15) 47.91, 479-06 road : 30 L038 LO3B-Rajera to Gooda road New Stage I o BIST 315.06 3 Loe New Stage | 7 1651 165.07 Lost New Stage 1 3526314. a We New Stage | @ mst 72.50 “| 7 New Stage ! 5 wast a2 35 L045 L045.Luna to Chhatrari road Upgarde Complete 4 41798644 36) LO LO42-Churh Garondi road (New Stage! 10 018 40178 37 Lo24—Lo24Chamba Luddu Bat New Stage 6 18418137 road Block Mehla Total 163,107.33, 345.27 3,452.60 Block: Saloon! 38 LOT “LO#7Salwan to Girjindoo ‘New ~ 9.500 3.000 Stage ° 56759, 63.07, 630.66, «81.98 ©,0,0,0, 0) road Block Saloon’ Total 9.500 ° 567.59 63.07, 630.66, ©——«81.98 (0, 0,0, 0,0) Block-Tissa 39 LOM LO#4Rakhalu Jassourgarh—Upgarde | Gbion Wall 7.000, 3.750, Complete | 12 283254 ——«325.36—— 4.30) 00,1, 1, 2) road
Nano Technology Pagest of 24 Generated Or»: 20/12/2018 10:55 AM Se. Core | Name of Road / Bridge Network No 1 2 3 40 L050 LOSOKalla Dug Dand road 4 TOL TOFTissatoSatyas road L040 LOAOKathwad Charda Juri road 43 L052 LOS2-Kainthly to Jandroh road Block Tissa Total District Chamba Total District: Hamirpur Block: Bhoranj 4 (088/038 Bast Bayona, Lawaniyan Manoh road 45 07 —(LO7OTal Balu road 41054 L054-UNht Phaphan Patta road 471032 L032-Bharari Bhour Suigwan road ‘Block Bhoranj Total Block: Bijhet 41037 L037 Salauni Kuthiana road Page 5 of 24+ Category (wu) 4 Upgarde Upgarde Upgarde New Upgarde Upsarde Upgarde Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Road (Kms) / | Carriage Stage Const. |CD Work | MoRD Cost State Cost | Total Cost Maint. Cost | Habs (1000+, Tedectony, Brg er) way vn (os) (stacs) SLs) MsLacs) (Lacs) 5004, 2500, 5 ‘Gbion Wall
Nano ce BLock
Goon 7 8 9 10 1" 2 8 7.000 3.500 Complete 19 m2 RST 39.500, 3.500 Complete | 81 142.10) 160.23) 1,602.33 9500, 3.500, Complete | 10 7.60 3.000 Stage! 2 60.690 144 223.910 364 5.000 3.000 Complete 0 D739, B27 52.66——«32.85 ,1,1,5,7) 5.000 3.000 Complete 0 258784328430, 896 3.500 3.000 Complete 0 157159515952) —=«20.74 5.500 3.750 Complete 0 m7, 46, 090 19.000 ° 910.00 f01.1t)t0rt.td 131.45, 7.500, 3.500 Complete | 6 40496, 45.00, 449.96. «58.49, 0,0,1,2,3) Generated On : 20/*2/2018 10:55 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Se. Core | Name of Road / Bridge | Category | __New Road (Kms) / | Carrlage | Stage Const. | CD Work | MORD Cast | State Cost | Total Cost | Maint. Cost | Habs (1000+, Network No. (WU) Technology Bridge (htrs) Way Wiath, (Mos) (Rs Lacs) (Rs Lacs) (Recs) (Rs Lacs) 500s, 250%, Length +280, Total) 1 2 3 4 6 7 8 ° 10 " 2 B #1025 L025-Bhota to Samtana ——_Upgarde K 11.000 3.000 Complete 12 566.16 6291 9.07 our ion 50 LOR LO27- shar Kase road K 9.500 3.000 Complete 12 AMS, 5250 55.02 51 L093 L093-Bani to Matkar Khajlan” Upgarde ck 6715 3.500, Complete 7 32658 36.2962 road ‘Block Bijhrt Total 3aris 37 «4,770.22,—*196.70 1,966.92 Block- Hamirpur 52 L046 |LO46-Sasan to Baleta Khurd | Upgarde | CC BLOCK 8.000 3.750) Complete 3 39856 44.28 53 L053._—L053-Link oad to Majhog —Upgarde 2,000 3.000, Complete 0. 104491161 Khas 55.09 2000-3500 Complete 2 4000-3750 Complete 0 3000-3750) Complete 0 cc atock 4000-3730) Complete | 3 38 ia3-Nanpul Bharmoti nk | Upgarde | CC BLOCK 3300 Complete 5 road ” LoytPatta lar to Wohla | Upgarde CC BLOCK 4650-5500 Complete 6 1438-37370 ‘Block Nadeun Total 21.150 16 waa 424432 ‘Block- Teun Devi © 104 |LO4OLink ond to vilge Upside Goion Walt 7.000, 3730, Compinte 0 Eo) aout RABHI Page 6 of 24 * Generated On : 20/12/2018 47:55 AM fies rei L034 LOB4Khiro0 te Bharoon 069 L069-Padra to Chamarkart (wu) Upgarde Upgarde Upgarde Upgarde New Tetenlony tg er) | Way Wt cc BLOCK, ‘cc BLOCK
Gbion ‘wall 9.250 3.000 4.500 5.050 113.665 7 3.750 3.500 3.750 3.750 3.000 3.750 3.500 Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Complete Complete Complete Complete Complete Complete Complete Complete Complete Generated On : 20/12/2018 10:75 AM 0 143.80) 182.87) 353.24 1,392.36 5,588.51 (Rs Lacs) " 51.63 15.98 7.32 28.14 Road (Kms) / | Carriage | Stage Const. CD Work | MoRD Cost | State Cost | Total Cost | Maint. Cost | Habs (fs Lacs) (Lacs) 2 516.30 159.78 203.19 281.38 Se.| Core | Name of Road / Bridge Category Network No, co) 1 2 3 4 70 L085 L085-Gopalpur to Upper _Upgarde rate! 71 LOST LB31-Gughar to Nachhir 72 090—L090-Chamotuto Chamarkar Block Bhawarna Total Block: Dehra Gopipur 73 Lost LO41-Khundtian to Charambu road 7a Loa LO2H-Surani to Bagg road 75 L061 —_LO6Y-Kutiara to Trimbla 2 road 76 L102—“L1O2-Haripur to Bhatti —|_Upgarde PPhakorin road 77 U0 —“LiO@-Har Kundls Har to Upgarde Kariara road 7 L18_L118-Darkata Bhatt road 79 086 L086-Balairu to Rohara road Upgarde Page 8 of 24 New Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Road (Kis) / | Carriage Stage Const. | CD Work | MoRD Cost | State Cost | Total Cost Maint. Cost | Habs (1000+, “Technology Bridge (htrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (RS Lacs) (Rs Lacs) 500+, 250+, ‘Length 250, Total) 5 6 7 8 ° 10 1" 2 8 “4 Cold ix 2.400, 3.750, Complete 7 12423, 13:80, 138.03, ——*17.94| (1,0,0,0,1) 2900 3.750, Complete 7 151.03, 16.78 «167.81, 21.82, @,2,1,0,3) 2.800, 3.500 Complete 4 13888, «15.48,~=~=«SA31)——~—«20.06) ©, 0,1,1,2) 16.100 30 785.80 87.30 © B73.10 113.51 (1,3,6,2, Gbion Walt 3.500 Complete 1 1146 114.62
Nano Technology Cold mix 3.500 Complete 1 728 7a 2300 3.500, Complete 1 73.03 80767, «16.77 ©, 0 ‘Gbion Wall 2.800, 3.750, Complete 5 11608" ——*12.90/——«128.98|—~—C«6.86 0
Nano Technology 6.000, 3.500, Complete 9 mo. 6400, —3.750, Complete 9 25593, (8442837) 36.97 1,1, 1,3) 3.500 Complete 18 42.25, 4409 446.94 58.10 (0,0,0,2,2) Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr.| Core | Name of Road / Bridge | Category Network No. wu) 1 2 3 4 80 L085 —L085-Balatruto Adhwani—_Upgarde oad ‘Bt L100 L100-Dhawala to Rajol —|—Upgarde Palani road 82 (O78 LO7B-Bharoli Khabi Dosarka_ Upgarde to Pakhehe road 8 L024 Lo2t-Lagruto Tali road New 4 LOR LOTR Dhatehar to Dodru —=New ~——-Gion Wall 2700, 3.000, Complete 14 road 85 L135.—-L135-Marhana Dhakhar road |New Gbion Wall 1.500 3.000, Complete 6 Block Dehra Gopipur Total 53.300 100 Block: Fatehpur 86 LOM —(LO3-Jawala Mukhi Dehra _Upgarde 2.000 3.750 Complete 5 awalt Raja ka Talab road to arnota Khas Technology Block Fatehpur Total 2.000 5 Block- Kangra 87 L024 | L024-Ghanyara to Sokni da Upgarde Gbion Wall 4.250, 3.500, Complete 4 Kot
Nano Technology 88 L089 LO89-Bhariathar to Sanani——-New ion Wall 2475 3.000 Complete 8 8 WT LO74-BaniDiHati toObra—— New bin Wall 5.250, 3.500 Complete 5 Block Kangra Total ‘3975 7 © Page 9 of 24 Generated On : 20/12/2018 10:55 AM ‘MM at mer, Resist Bhawan, New Des Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. | Core | Name of Road / Bridge Category Road (Kms) / | Carriage | Stage Const. |CD Work | MoRD Cost | State Cost | Total Cost Maint. Cost | Habs (1000+, Network No. WO)” Technology Bridge ts) Woy Wich (Mos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500, 250+, Length 250, Total) 1 2 3 4 3 6 7 8 ° 10 1" 2 8 “4 Block- Lamba Gaon 90 L038 LO3B-SancatoSamiletar—-‘Upgarde Cold Mix 1500-3500, Complete 2 wat 835, 6.46, «10.850, 0,1,0,1) Technology BY 91 L056 L056-Tikrt to Kamand Upsarde 4000 —~'3.750, Complete 2 16707 —*18.56~—~=«4185.63,=—==«24.13 ©, 0,2,0,2) “Technology Block Lamba Gaon Total 5.500 4 2aLt8——«26.91——«269.09, 34.98 0,0,3,0,3) Block: Nagrota Bagwan 92 L093 |LO®3-Ihapreh to Gujrehra— Upgarde Cold Mix 2.000 3.500, Complete 6 9902, 11.00, —*190.02,-——«1430 @,0,1,0, 1) 93 L100 L100-Gumer to Kanol New 7.000 3.500 Complete 4 34a BG Block Nagrota Bagwan Total 9.000 10 45.56 458.65 Block: Nagrota Surian ‘94 L081 |L08t-Dhamin to Bahi road —Upgarde | Gbion Wall 7.000 3.500, Complete 25 a6, (3207, —«20.67 95 1050 L0SO-Nagrota Suran to —Upgarde Cold Mix 3:10 «3.780 Complete | 6 109.67, 2.19). Nandpur road Technology Block Nagrota Surian Total 10.160 at 398.27 44.26 442.53 Block: Nurpur 96 L025 (LOS Mal Kwal to Kuther —Upgarde Cold Mix 6.700, 3.750 Complete | 13 W090, 35.66) —«2356.56, === 46.35, 1,2,3,6) road Technology ‘R/> Goion Wall Page 10 of24 Generated On : 20/12/2018 10:55 AM MG ae Fi ari Rear Rael Rural Development ‘git se, 36 PesfKish Bhawan, New Deli Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Se.| Core Name of Road / Bridge Category Carriage | Stage Const, | CD Work | MoRD Cost | State Cost | Total Cost | Maint. Cost | Habs (1000+, Network No. wu) Way Width (Nos) Bs Lacs) (Rs Lacs) (RS Lacs) (RS Lacs) 500+, 250+, “250, Total) 1 2 3 4 7 8 ° 10 " 2 13 14 97 L081 _LO®T-Rehan to Kandore oad Upgarde 3.500 Complete 3 19.02, 16.56 165.58, 21.53 (1,0,0,0,1) 8 LO Upgarde 3.500 Complete 4 32.92 oa 98 * WH Upsarde 3.500 Complete 5 2691 269.06 100 L033 —‘L033-Malkwal to Meharaka Upgorde 3.750 Complete 4 2.48 2 O,1,2 road 101 LOS} —-LOB3-Rehan to Chhatter —_Upgorde 3.500 Complete 6 263.30) 38.03 @,2,2,1,5) road 102 L097 LOW7-Rajaka Bag to Tareta- Upgarde 3.750 Complete 3 wat ABT, —~—«3833@,3,1,0,4) road 103 L077 —LOT7-Bansan da More to Upgarde Nano 2.100 3.500 Complete 5 103250 11.a7 1491 « Bassa road 104, L086 -LOB6-Chhatter to Gharoli _Upgarde 2.500, 3.500) Complete | 1 0441338 17.40 ©, road Block Nurpur Total 38.300 444,750.07, 194.46 1,944.53 Block: Pragpur 405 L075 | LO7S-Shantala to Ler road _Upgarde 2300 3.500 Complete | 6 10824 f203,—~—«2027,S«15.63 @,0,1,0, 1) 2200, 3.750, Complete 3 100.06 1.12 14.45, 0,0, 106 L058 —LO58-Pragpur to Dangria—Upgarde road 1 of 24 *

You might also like