You are on page 1of 2

GOVT. ENGG.

COLLEGE, S-28, GANDHINAGAR


INSTRUMENTATION & CONTROL
B.E. 7TH
Term: ODD 2018
Subject: Distributed Control System & SCADA (2171709)

List of Experiments

1 Understanding of DCS-Flow-sheet symbols.


2 Study hardware and software platforms for DCS using VLAB.
3 Explore SCADA software (Wonderware) & different types of animations used in it.
4 Development of GUI using different type of scripting for (a) basic and (b) advance programs on
SCADA software.
5 Simulate analog and digital function blocks using VLAB.
6 Logic implementation for traffic Control Application using VLAB.
7 Tune PID controller for heat exchanger using DCS using VLAB
8 Study of various DCS display options.
9 DCS cost estimation procedure.
10 Explore Field bus, Modbus, Profibus & FIP bus network interface / protocols.

Design based Problems (DP)/Open Ended Problem:


 For water heating process (level control by manipulating inlet flow, temperature control by varying current,
water meter and energy meters are provided), design a system if all field devices are discrete devices
(discrete control), continuous devices (continuous control) and hybrid control (few devices analog and few
are discrete devices). The design must include listing of instrumentation devices, allocation table of I/O
channels to process parameters, allocation of memory locations for special requirements, control flow chart
and any other necessary drawing/ diagram.

In-charge Faculty H.O.D. (IC)

1 out of 2 | P a g e
GOVT. ENGG. COLLEGE, S-28, GANDHINAGAR
INSTRUMENTATION & CONTROL

Term: ODD 2018

Exp.: 3
(a) Development of basic programs on SCADA software
(1) Develop basic gates – AND, OR, NOT (use of expression & script)
(2) Develop gates – NAND, NOR, EX-OR
(3) 3 i/p switches & 3 o/p LEDs. (Any 1 i/p then 1st LED is on, any 2 i/p then 2nd LED is on, all 3 i/p
then 3rd LED is on)
(4) Use of Analog slider & meter. Generate alarm if input is beyond some limit. 5) Convert
temperature from C to F. Also display each value. (Use of #)

(b) Development of advance program on SCADA software.


(1) Tank process (Filling & Emptying out tank with inlet & outlet valve)
(2) Two Tank process connected in cascade with different capacities (inlet, middle & outlet valve)
(3) Bottle filling process on conveyor
(4) Mixer process operation
(5) Process with Alarm & Trend

2 out of 2 | P a g e

You might also like