You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

CL BEARING / ABUTMENT A CL PIER 1 CL PIER 2 CL PIER 3 CL BEARING / ABUTMENT B


L
C
50000 L
C

65000 65000 48000 L


C

SPAN - 1 (L1) SPAN - 2 (L2) SPAN - 3 (L3) SPAN - 4 (L4)

C C
Y-AXIS DEFLECTION

X-AXIS SPAN
FILENAME :\\CORP.PBWAN.NET\AE\PROJECTS\37463520-ETIHAD RAIL - STAGE 2BC\05-DWGS\1-WIP\1-WIP T&I\3-WIP BRIDGES\2-WIP PLOT SHEETS\03-DCP3-DETAILED DESIGN\STAGE 2C\4-JBL ZONE-0 (0+000 TO 3+0000)\UB 1+971\SUPERSTRUCTURE\C0306-JBL-ECB-DG-31290-AC.DWG

184.80
102.0

108.5

115.0

121.5

128.0

134.5

141.0

147.5

154.0

160.5

167.0

173.5

180.0

189.6

194.4

199.2

204.0

208.8

213.6

218.4

223.2

228.0
D SPAN D

56.5

63.0

69.5

76.0

82.5

89.0

95.5
0.00

5.00

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0
(L)

TOTAL
11.0

18.0

20.0

19.0

16.0

10.0

10.0

19.0

25.0

28.0

25.0

19.0

10.0

10.0

20.0

25.0

26.0

24.0

17.0

13.0

18.0

20.0

18.0

15.0

11.0
5.0

4.0

2.0

0.0

5.0

5.0

0.0

4.0

9.0

4.0

0.0

3.0

7.0

5.0

0.0
0.0

DEFLECTION
(mm)

AC
SHORT TERM DEFLECTION
Scale H 1:300 V 1:600

E E

F F

CL BEARING / ABUTMENT A CL PIER 1 CL PIER 2 CL PIER 3 CL BEARING / ABUTMENT B


L
C
50000 L
C

65000 65000 48000 L


C

SPAN - 1 (L1) SPAN - 2 (L2) SPAN - 3 (L3) SPAN - 4 (L4)

G G
Y-AXIS DEFLECTION

X-AXIS SPAN

H H

184.80
102.0

108.5

115.0

121.5

128.0

134.5

141.0

147.5

154.0

160.5

167.0

173.5

180.0

189.6

194.4

199.2

204.0

208.8

213.6

218.4

223.2

228.0
SPAN
56.5

63.0

69.5

76.0

82.5

89.0

95.5
0.55

5.00

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

(L)

TOTAL
13.0

15.0

13.0

10.0

11.0

16.0

18.0

16.0

12.0

11.0

14.0

15.0

13.0

10.0

15.0

18.0

17.0

14.0

10.0
5.0

9.0

8.0

5.0

2.0

0.0

4.0

9.0

6.0

2.0

0.0

1.0

4.0

8.0

5.0

3.0

0.0

1.0

5.0

0.0
0.0

DEFLECTION

3.0
(mm)

AC
LONG TERM DEFLECTION
J Scale H 1:300 V 1:600 J

NOTES :-
1. ALLDIMENSIONSAREINMILLIMETERSUNLESSOTHERWISENOTED.
2. THISDRAWINGISTOBEREADINCONJUNCTIONWITHALLRELEVANTDRAWINGS
K ISSUEDBYTHEENGINEER. K
TIMESTAMP : 11/10/2020 12:26:28 PM

3. PRECAMBERSHALLALLOWFORLONGTERMDEFLECTIONANDFORMWORK
DEFORMATIONETC.IFANYPRECHAMBERDETAILSSHALLBESUBMITTEDTOTHE
ENGINEERINCHARGEFORAPPROVALTOEXECUTION.
4. UPWARDDEFLECTIONISPOSITIVE.
5. SHORTTERMDEFLECTIONINCLUDESDEFLECTIONDUETOOWNWEIGHTOF
SUPERSTRUCTURE,PRESTRESSINGANDSHORTTERMCREEPANDSHRINKAGE.
6. LONGTERMDEFLECTIONINCLUDESDEFLECTIONDUETOOWNWEIGHTOF
SUPERSTRUCTURE,SUPERIMPOSEDDEADLOAD, PRESTRESSINGAND LONG
TERMCREEPANDSHRINKAGE.
7. THEDEFLECTIONPROVIDEDAREATTHECENTERLINEOFTHEBRIDGE.
L L

LEGEND NOTES KEY PLAN SHARJAH CONTRACTOR'S JOINT VENTURE : SUB-CONSULTANT : PROJECT DRAWING TITLE
CL
TYP
:
:
CENTER LINE
TYPICAL
1. DO NOT SCALE FROM THE DRAWINGS.
REV DATE DESCRIPTION Drwn Chkd Appr
ETIHAD RAIL NETWORK ETIHAD RAIL STAGE 2 PROJECT C0306-PACKAGE 2C ZONE 6
JEBEL ALI BRANCH
2. ALL DIMENSIONS ARE IN MILLIMETERS & C AA 20/05/2020 ISSUED FOR REVIEW SC RC DI
USER NAME : Farooque, Faizan

CJ : CONSTRUCTION JOINT LEVELS ARE IN METER UNLESS NOTED DM CLIENT UNDER BRIDGE AT CH: 1+971
EJ : DECK EXPANSION GAP OTHERWISE. ALL DIMENSIONS TO BE JB
L GIRDER DEFLECTION DIAGRAM
VERIFIED ON SITE & APPROVED BY THE ENGINEER. AB 24/08/2020 REVISED PER REVIEW SC RC DI
SHEET No SCALE ORIGINAL SIZE
AC 08/11/2020 REVISED PER REVIEW FF RC DI 01 OF 01 AS SHOWN A1
B
DM PMC ENGINEER PROJECT STAGE DOCUMENT STATUS
DUBAI P.O.Box. 7497 Dubai, U.A.E DCP3 : PRE-FINAL DESIGN DRAFT
M Tel: +971 4 350 5000 Fax: +971 4 350 5001 DRAWING No REVISION M
ABU DHABI www.wsp.com
AL AIN C0306-JBL-ECB-DG-31290 AC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like