You are on page 1of 1

ZPMC QC-Mechanical trining

day1 day2 day3 day4 day5 day6 day7


Chapter 1: SAFETY
1.1.Introduction
1.2.warning and symbols
1.3.general rules of conduct and safety regulations
1.4.safety rules for operation
1.5. safety rules for maintenance and repair
Chapter 2:STS-CRANE SYSTEMS
2.1.outline of the crane
2.2.crane specifications
2.3. major component
2.3.1.gantry system
2.3.2.hoist system
2.3.3.boom hoist system
2.3.4.trolley system
2.3.5.catainary trolley system
2.3.6. miscellaneous system
2.3.6.safety and protection system
Chapter 3:wire rope
3.1wire rope construction.
3.2.wire rope handling.
3.3.causes of wire rope failure.
3.4.type of wire rope fracture.
3.5.wire rope measuring .
3.6.when wire rope must be replaced .
3.7.wire rope inspection.
3.7.1.hoist wire rope inspection.
3.7.2.trolley wire rope inspection.
3.7.3.boom hoist wire rope inspection.
3.8.wire rope rereeving .
3.8.1.hoist wire rope re-reeving.
3.8.2.trolley wire rope re-reeving.
3.8.3.boom hoist wire rope re-reeving.
3.8.4.catanary wire rope re-re-reeving.
3.8.5.mechanary house service crane wire rope re-reeving.
Chapter4: emergency operation
4.1.hoist emergency operation
4.2.trolley emergency operation
4.3.boom hoist emergency operation
Chapter 5: hydraulic system
5.2.hydraulic parts
5.3.gantry wheel brake
5.4.boom hoist emergency brake
5.5.multi-function hydraulic system
Chapter 6:maintenance
6.1.inspection
6.2.greasing
6.3.troupleshooting
Site training

You might also like