MEWP Exam for Authorization

Date: _________________ Rating: ______________

Name of Inspector & Signature: ________________________________

Question # 01 What is the reference standard for examination of MEWP?

Answer: ___________________________________________________

Question # 02 Give at least 5 functions in the operation of MEWP?

Answer: _________________________________________________

__________________________________________________________
__________________________________________________________
________________________________________________________

Question # 03 Give at least 10 major parts of MEWP?

Answer: a. _________________________b. ______________________

c. ________________________________d. _____________________

e. _________________________________f.
______________________

g. ________________________________h. _____________________

i. ________________________________j. _____________________

Question # 04 Give at least 10 types of limit switches of MEWP?

Answer: a. _________________________b. ______________________


Betalink Instrumentation & Calibration Service LLC

c. ________________________________d. _____________________

e. _________________________________f.
______________________

g. ________________________________h. _____________________

i. ________________________________j. _____________________

Question # 05 What is the interval period for the thorough examination of


MEWP?

Answer: __________________________________________________

__________________________________________________________

Question # 06 Give 5 rejection criteria of MEWP?

Answer: a. ________________________________________________

b. ________________________________________________________

c. _______________________________________________________

d. _______________________________________________________

e. _______________________________________________________

Question # 07 What is the minimum capacity of MEWP?

Answer:___________________________________________________
_________________________________________________________

Question # 08 In engine driven MEWP, What will be the 3 kind of oil they were
using?

Answer: _________________________________________________
Betalink Instrumentation & Calibration Service LLC

__________________________________________________________
________________________________________________________

Question # 09 Prior to examine / inspection of MEWP, Give at least 5


documents required?

Answer: __________________________________________________
________________________________________________________
_________________________________________________________
Question # 10 Who will be the authorized operator to operate the MEWP?

Answer:___________________________________________________
__________________________________________________________
__________________________________________________________

Checked By: ____________________________