Professional Documents
Culture Documents
Plumbing Fire Fighting Qty Takeoff Procedure and Process 1572254293 PDF
Plumbing Fire Fighting Qty Takeoff Procedure and Process 1572254293 PDF
PLUMBING
&
FIRE FIGHTING
QUANTITIY TAKE
OFF
PROCEDURE
/PROCESS
1
SAGUBAR SATHIKALI
2
SAGUBAR SATHIKALI
If any deviation in
Find out difference in
items qty,RFI to be
items qty.
raised.
3
SAGUBAR SATHIKALI
If any deviation
Find out
in items qty,RFI
difference in qty.
to be raised.
4
SAGUBAR SATHIKALI
5
SAGUBAR SATHIKALI
Application(in general)
Exposed location
All Hot Water Pipes
6
SAGUBAR SATHIKALI
Example
Pipe dia in
S.No Items Pipe qty in mtr Pipe Insulation qty in mtr
mm
25 mm thick
1 Hot Water Pipes 25 25 25
All Roof/Exposed
2 Cold Water Pipes 25 53 53
7
SAGUBAR SATHIKALI
Indentify the
Arrive the qty of Record the qty in hard
requirement of cladding
cladding(sq.m) over pipe copy and xls sheet as
on pipe insulation as per
insulation. floor/zone wise.
speciation.
Application In general
Cladding in Exposed area
Pipe insulation thick 25 mm
8
SAGUBAR SATHIKALI
15 20 50 70 50 0.22
11.0
20 25 50 75 50 0.24
11.8
25 32 50 82 50 0.26
12.9
Perimeter calculation
Perimeter = 3.14 * D
9
SAGUBAR SATHIKALI
10
SAGUBAR SATHIKALI
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Support Clamps in
dia in mm in mm side in mm ins in mm mtr spacing m Nos
15 20 50 70 50 25.0
2
20 25 50 75 60 30.0
2
25 32 32 70 35.0
2
32 40 40 50 2 25.0
11
SAGUBAR SATHIKALI
12
SAGUBAR SATHIKALI
Vapour
Perimeter in
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area Barrier-
m
dia in mm in mm side in mm ins in mm mtr (Sq.m) ltr(2sq/ltr/c
(3.14 x D)
oat)
13
SAGUBAR SATHIKALI
14
SAGUBAR SATHIKALI
Perimeter in Glue-
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area
m ltr(5sqm/ltr
dia in mm in mm side in mm ins in mm mtr (Sq.m)
(3.14 x D) )
15 20 50 70
200 0.22 44.0 8.8
25 50 75
20 200 0.24 47.1 9.4
25 32 50 82 200 0.26 51.5 10.3
note pip insulation thick 25 mm
15
SAGUBAR SATHIKALI
16
SAGUBAR SATHIKALI
17
SAGUBAR SATHIKALI
18
SAGUBAR SATHIKALI
Perimeter in
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area Oven cloth 30 yard
m
dia in mm in mm side in mm ins in mm mtr (Sq.m) roll(70 sq.m/roll)
(3.14 x D)
19
SAGUBAR SATHIKALI
20
SAGUBAR SATHIKALI
21
SAGUBAR SATHIKALI
22
SAGUBAR SATHIKALI
Toltal
Vibration Pad Inertia base Total Inertia
Pump qty in Vibration Pad
Item qty/Unit in qty/Unit in base qty/Unit
No qty/Unit in
no no in no
no
b c=a*b d e=a*d
4 20
Pump 5 1 5
23
SAGUBAR SATHIKALI
2.2 Drainage
If any deviation in
Find out difference in
items qty,RFI to be
qty.
raised.
2.2 Drainage
25
SAGUBAR SATHIKALI
2.2 Drainage
Compare the
Record the qty in hard
Finalize the takeoff qty
copy and xls sheet as
qty with BOQ
floor/zone wise.
qty(if avail)
26
SAGUBAR SATHIKALI
2.2 Drainage
Compare the
Record the qty in hard
Finalize the takeoff qty
copy and xls sheet as
qty with BOQ
floor/zone wise.
qty(if avail)
27
SAGUBAR SATHIKALI
28
SAGUBAR SATHIKALI
2.3 Drainage
List out pipes qty size Find the supports Arrive the supports
wise from the take distance by specification qty size wise from
off qty. and drawing. the support distance.
29
SAGUBAR SATHIKALI
a b c d=b/c
82 50 2 25.0
110 60 2 30.0
160 70 2 35.0
180 50 2 25.0
30
SAGUBAR SATHIKALI
If any deviation in
Find out difference in
items qty,RFI to be
items qty.
raised.
If any deviation
Find out
in items qty,RFI
difference in qty.
to be raised.
32
SAGUBAR SATHIKALI
33
SAGUBAR SATHIKALI
List out pipes qty size Find the supports Arrive the supports
wise from the take distance by specification qty size wise from
off qty. and drawing. the support distance.
34
SAGUBAR SATHIKALI
35
SAGUBAR SATHIKALI
36
SAGUBAR SATHIKALI
No of Cleant
Foam Req
Location/Rooms Length in m Wide in m Height in m No Of Rooms agent Req in
in nos
nos
a b c d e f=e g=e
LV Room 5 5 3.5 2 2
HV Room 5 5 3.5 1 1
Qtel Room 5 5 3.5 1 1
Fuel Tank Room 5 5 3.5 2 2
37
SAGUBAR SATHIKALI
Indentify the
Record the qty in hard
requirement of Arrive the qty of paint(ltrs)
copy and xls sheet as
painting on pipe as per over pipe
floor/zone wise.
speciation.
38
SAGUBAR SATHIKALI
Synthetic
Wash
Zinc chromate enamal glass ii
Pipe nominal Pipe outer dia Pipe qty in Perimeter m Surface Area primer(A+B)(1 Thinner(11s
primer(14sq.m 2 coat
dia in mm in mm mtr (3.14 x D) pipe(Sq.m) 1sq.m/ltr) q.m/ltr)
/ltr) in ltrs (14sq.m/ltr) in
in ltrs in ltrs
ltrs
39