Health and Satety
Executive
24 This guidance sets out expectations for managing isolations activities, le that
you:
set a policy and standards for isolation activities, to reduce tisk to ALARP;
set procedures/processes, with worker participation, to achieve secure
iEolations in normal operating conditions and in other foreseeable conditions;
|m_assess any proposed deviations from company procedutes, authorise these at
an appropriate level and record/monitor them;
monitor and periodically audit your Isolations procedures and use that
information in the review of your isolations policy (a checkiist for reviewing the
adequacy of the overall arrangements is given at Appendix 3); and
have, for multi-site operations, an element of corporate oversight* in standard.
setting and assurance (for example, central reporting of objective information on,
the performance of isolations systems).
25 The potential for human failure during isolations, and its importance, is
discussed in paragraphs 42-48. ILis important that you both understand and act,
upon this knowledge. Critical aspects of people's role within isolations systems
include:
1m setting roles and responsbblties for key personnel
|B training, competence and authorisation; and
the management activities of monitoring, audit and review and then taking
action.
Design
Principles
26 Good design maximises inherent safety and is fundamental to achieving safe
and effective solation without placing unnecessary constraints on plant operation
Some intrusive maintenance or internal inspection tasks will avays require plant
shutdown. VWhere isolation to enable intrusive activities is appropriate, Suitable
'solation attangements on the plant should be cleaily specified at the design stage
27 The opportunity to achieve an inherently safer design is greatest for new plant
‘and equiptment. Wherever reasonably practicable, the saine approach should
be followed for plant modifications (see paragraphs 137-140}
28 The potential for human failure, including ertox, should be addressed and,
Wherever possible, minimised in the design.
29 Atan eatly point in the design process the clint should specty the intentions
for normal and alternative mode(s} of operation, sparing of equipment, and the
equipment maintenance strategy. Where possible, this should anticipate the
intended lifecycle of the plant, including foreseeable inexitications (for example
addition of equipment). This phiiosophy should bo documented and wil determine
the plant's outline isolation requirements. Any proposed deviation from the
agreed design basis once the plant fs operational should be justified through risk
assessment before alternative isolation arrangements are used.
The sa lscaton of plant and equipment Page Sot 8