Timingofofsupply
supply--
Shafts 11week
week
Timing
Pumpsnotnotcritical
critical
Wear Rings 11week
week
Pumps
Bushings 11week
week
Gaskets 11week
week
Impellers 11week
week
Timingofofsupply
Timing supply Shafts 36Hours
36 Hours
Pumpscriticals
Pumps criticals 36Hours
Hours
Wear Rings 36
++44emergency
emergency
36Hours
Hours
Bushings 36
Workshop Repsol YPF Refineria La Plata / Pump Life Cycle Cost 4
Gaskets 36Hours
36 Hours October 2006 / 2
Pump Division
PROPANE
ASPHALTS
DEASPHALTER
GASOLINE - NAPHTHA - MIDDLE DISTILLATES
INDUSTRIAL
VISBREAKER FUEL OIL
FUELS
ASPHALT
REFINERY
GASOLINE - NAPHTHA - MIDDLE DISTILLATES
DELAYED FUEL OIL
COKER
RETURN
Pump Division
Topping
TYPICAL TOPPING UNIT
INIBITORE DI CORROSIONE
RIFLUSSO DI TESTA
BENZINA LEGGERA
STRIPPER
VAPORE
FORNO
NAFTA
380 °C
P
U
M
P
STRIPPER VAPORE
-
A
R
O KEROSENE
U
200 °C N
D
RECUPERI DI STRIPPER
VAPORE
CALORE
GASOLIO
GREZZO
RESIDUO PRIMARIO
RETURN
Pump Division
Turned parts
Reduce many different kind of materials used, sometimes
we see over 40 different materials used (ASTM, DIN, etc)
Select 3 materials suitable to do all services and standarize.
Intelligent HL
GAUK
WUC
2
1
1
HAS 26
Stock 8BHU
VARIE
1
40
TOTAL Q.TY 393
b PARTS TO HAVE IN STOCK IMPELLER FLOWSERVE
SHAFT FLOWSERVE
CASING RING FLOWSERVE
IMPELLER RING FLOWSERVE
BUSHING FLOWSERVE
SHAFT SLEEVE FLOWSERVE
DIAPHRAM FLOWSERVE
GASKETS FLOWSERVE
36- HOURS
Pump Division
IMPELLERS
DIAPHRAMS
CASING
1- WEEK
Pump Division
CLIENTE AGIP
lCUSTOMER DATA REGIONE SICILIA
LOCALITA' PRIOLO
SETTORE RAFFINERIA
lPRODUCTION
CAPACITA' 15 MILIONI DI TONNELLATE ANNO
UNITA' TOPPING
lTYPE OF PROCESS ITEM P101A
Q.TA' 1
lTYPE OF SERVICE MACCHINA POMPA
SERVIZIO FONDO COLONNA
lOPERATING CONDITIONS CONDIZIONI FUNZIONAMENTO
Q / H / NPSHA/TEMP/
MOTRICE MOT.EL.
GIUNTO FLESSIBILE
lDRIVER DATA
COSTRUTTORE WORTHINGTON
lMECHANICAL SEAL DATA TIPO 2HNN112
MATRICOLA 19003
lITEM LISTA PEZZI 1002000000
ARTICOLO 4023102960 4022305950
lPUMP DESCRIZIONE ALBERO BUSSOLA
Q.TA' TOTALE 14 10
CODICE ASTM A434_4140 B584_C938
lSERIAL NUMBER CS DISEGNO BM45235 BM45235
GREZZO 8011220800 8317011330
lBILL OF MATERIAL UNITA' MM MM
MISURA 678 15
lCOMPONENT DISEGNO CM04399100 AM05118400
FORMULA D D-d
lARTICLE DIMENSIONE 080^2*Pi/4 70^2-35^2
PESO 3,92 2,25
DIM.Max 80 70
lCONSTRUCTION DRAWING DIM MIN 0 35
CODICE MATERIALE 8235 8701
lMATERIAL FORMA TONDO CANNELLA
Advantages
Reduced inventory levels and inventory capital value is
reduced due to raw material stocking instead of complete
finished machining value.
When pump is taken out of service for overhaul, parts arrive
for the critical pumps when pump is open and inspected.
This reduces the time of being out of service, sometimes by
50%
For emergency repairs, still genuine parts according original
design data are used, and heat treated, which is most of
times not done when turned parts have to be made locally
under emergency.
One phone call starts the entire supply chain for parts
delivery (automatic)
Pump Division
Standardization
What is RV-X- ?
It is Flowserve API-610 10th
edition power frame upgrade
back pull out assembly.
- Impeller ring
- Impeller locknut
- Seal
- Coupling guard
Pump Division
Increase Reliability.
Quick delivery.
- Parts and materials of construction are standardized.
S6 (Carbon Steel)
C6 (Chrome Steel)
A8 (Stainless Steel)
RV-X- Frame Selection
Pump Division
(3) Standard Assembly Frame sizes : (3) Standard seal chambers per Table 6 :
- A Frame : 8.5 through 10.0 - A Frame : seal chamber size #4 - 49.5
impellers mm
- B Frame : 10.5 through 17.0 - B Frame : seal chamber size #6 - 69.5
impellers mm
- C Frame : 18.0 through 21.0 - C Frame : seal chamber size #8 - 86.0
impellers mm
RV-X- Frame A Pump Division
Stiffness Index
L