Professional Documents
Culture Documents
June 2020
One Moving Part – On Location Grid Quality Generation
Flap
Monopile Base
Co-Location with no compromise in energy capture efficiency:
1MW, fixed location, variable depth, COTS materials/components,
wind turbine like power production and grid connection
195m
20x20m Flap
Farm
▪ Combining wave and wind resources: