CiCS manages the risks to the ICT infrastructure that supports most of the vital functions of the University.  Our internal risk management information will have a more 
complex structure than the register layout suggested.  Each system or service supports various types of vital activity in the University and is at risk from many causes, 
each with its own preventive measures.  Systems are also heavily interdependent.  The recommended Risk Register layout has too few dimensions to express this 
complexity and can only provide a simple summary.   

Loss or degradation of any ITC system would clearly be categorised as an infrastructure risk, but this could be misleading as learning, financial processes, research etc 
could all be affected equally.  Instead we have given more than one category, as a number, against most risks.  To give them in order of risk exposure would be almost 
meaningless and this has not been attempted. 

We have not listed planned actions against most risks.  Many major actions were identified earlier and are now complete.  They are shown as controls in the register. 
These are either major investments in equipment and facilities, or ongoing processes within CiCS.   Further actions are likely to be identified as the new assessment 
process develops. 

CiCS has a Business Continuity Plan and a great deal of other information to be used when various types of incidents occur.  This has not been mentioned in the Register 
as it applies to every risk. 

We have not listed opportunities alongside the risks.  They are a very different type of issue in this area. 

Categories ​
 ­ Most CiCS items relate to 1, 4, 6 and 7 

1. Estates, ​
Infrastructure, IT, Business Continuity 
2. External relationships and partners 
3. Financial 
4. Learning, Teaching, Student experience 
5. Organisational development and strategy 
6. Research and innovation 
7. Service quality 
8. Staffing and Human Resources 
   
Residu
Inherent  al  Due date and 
Category  Description  L  I  Controls in place   L  I  Further Actions  person  Other 
Risks related to resourcing  
1, 4, 6, 7  Under­funding and  L  M  Constant attention to  M  M  .     
obsolescence of IT  changing needs and funding 
resources.  issues, including 
Lack of investment leads to  continuation of capital 
reliability and security  budget. 
issues, plus accumulation of  Prioritise spending and 
long term maintenance  effort clearly. 
backlog which reduces  Current funding issues 
flexibility, reduces product  affect this risk. 
quality, increases upgrade 
times and generates 
unpredictability. 
Departments may then take 
things into their own hands, 
creating a chaotic set of 
facilities. 
1,7  Loss of key personnel.  M  M  Identify key personnel  M  L       
Many systems are  Share expertise and train 
understood by only one  others in key skills. 
person, who could leave,  Document key systems 
become ill, have an  carefully. 
accident etc. 
Maintain staff retention 
Some systems could then  through health and morale 
be difficult to maintain,  in the workplace, deal with 
with extended down­time,  grievances properly. 
or projects could be 
Standardise systems and 
delayed. 
processes to reduce 
reliance on individuals. 
Outsource specialist skills to 
competent third parties. 
Use SRDS etc effectively. 
Risks involving loss of use of software 
1  Major supplier goes out of  M  H  Use purchasing agreements  M  M       
business or taken over by a  that include alternate 
rival.  suppliers. 
Leads to inability to  Use of major suppliers – 
maintain specific items,  more likely to be taken over 
unreliability or high cost of  if they fail. 
replacing everything  Awareness of alternative 
supplied .  approaches. 
Avoid obvious 
dependencies. 
1, 4  Software licensing changes.  M  M  Awareness of forthcoming  L  M       
Software supplier could  changes and alternatives. 
withdraw licenses for vital  Membership of consortia. 
items, significantly change  Negotiate good deals. 
the price, go out of 
Check contracts. 
business, sell rights etc. 
Good relations with 
Affects costs and ability to 
suppliers. 
provide items widely.  Risk 
prosecution if unaware.  Pay annual costs when due. 
1,4,6,7,  Failure of applications  M  M  Keep software maintenance  M  L       
software, eg triggered by  contracts up­to­date. 
incompatibility due to  Application of patches and 
changes in related systems  implementation of new 
or by increased demands.  versions as they are 
This could lead to  provided for central 
unavailability of particular  systems. 
services and possible extra  Commitment to 
costs.  maintenance windows ­ so 
  software & hardware for 
key business systems can 
be kept supportable 
Appropriate testing of 
software and its effective 
and robust configuration, 
version and change 
management. 
Good documentation of 
procedures and 
dependencies. 
Risk arising from external constraints 
1  Changes to systems  M  M  Constant attention to and  M  L       
required by legislation, or  understanding of legislation 
new requirements from  and good liaison with 
funding bodies  Possible  funding bodies. 
requirement to stop using  Information Security Officer 
existing processes if not  in place. 
planned ahead. 
PCI/DSS compliance being 
addressed. 
1, 2  Outsourced services  M  M  Careful checking of  L  L       
(including Google Apps for  third­party services and 
Education, Blackboard  systems 
Learn, Talis, Planon, and  Use only major players. 
StarRez) 
Correct contractual 
Potential for loss of services  agreements. 
and service quality, 
Effective Supplier 
reputation and security 
Relationship Management. 
risks, legal issues (data 
protection, export laws).  Constant monitoring and 
robust exit plans in place. 
Risks related to internal communication and understanding of needs 
7  Unrealistic expectations of  M  M  Range of communication  L  L       
CiCS services.  channels to inform users of 
Failure to manage  services and changes. 
expectations and  Customer Services and 
understanding of services  Communication team 
could lead to bad feeling,  established 
complaints, unrealistic  Liaison  channels 
demands and pressure –  established and continue to 
lowering service quality. 
develop, especially at 
faculty level. 
Develop effective 
mechanisms for 
prioritisation involving all 
relevant stakeholders. 
7,6,1  Failure to provide services  M  M  As for ‘Unrealistic  L  L       
that are needed.  expectations’ above. 
If CiCS does not provide IT   
services that departments  Working in an agile way to 
need (or want) they will  more quickly provide 
find their own solutions.  solutions 
This would lead to 
Introducing a business 
duplication of effort, extra 
partnership model for 
overall cost, poorer quality 
better understanding 
and reliability and reduced 
Faculty IT requirements 
cooperation. 
 
 
Risks arising from malicious activity 
1,7  Internal fraud or sabotage.  L  VH  Attention to health and  L  M  Information Security     
Disgruntled (or simply  morale of staff.  awareness raising 
untrained) staff could do  Charter for system  programme across the 
enormous damage to IT  Administrators is regularly  University includes 
systems and data or bring  issued to all relevant staff.  guidance on security and 
the University into  statement of personal 
Access rights are allocated 
disrepute   responsibilities. 
carefully for key systems. 
Training on security 
procedures. 
Information Security 
Manager in place. 
1,4,6,7,  Unauthorised access to  H  M  A Code of Conduct for all  M  L  Information Security     
computers and data.  computer users, including  awareness raising 
programme across the 
May be malicious, hacking  security advice, is published  University includes 
etc.  Could lead to serious  and promoted.  guidance on security and 
breach of University  Appropriate detection  statement of personal 
security or create a route to  systems in place.  responsibilities. 
‘hack’ other sites. 
Monitor attempts to gain 
unauthorised access. 
Allocated rights carefully 
for sensitive systems. 
Manage expired accounts 
properly. 
1, 4, 6, 7  Virus or other malware  VH  VH  Use high­quality  H  M       
attack, or software  virus/malware detection 
vulnerabilities.  systems at the centre and 
Malicious software can  encourage or enforce use 
damage any IT system, or  on all users’ computers. 
prevent normal service by  Scan all incoming email 
sheer volume of extra  using state­of­the­art tools. 
traffic.  Apply all patches to keep 
The problem could spread  key software 
through many computers  (virus­scanning software, 
including to other sites and  operating systems and 
take days to clear.  major applications) up to 
  date on all computers, 
central and personal. 
Denial of Service Attacks to 
University or outsourced  Automatically block 
systems.  infected machines from 
using the network. 
Restrict the services that 
can be fully accessed by 
users. 
Encourage use of 
‘managed’ computers and 
CiCS hosting environment.. 
Issue clear advice to users. 
Risks leading to loss of data, or loss of access to data 
1  Failure of data backup  M  H  Maintenance contract on  M  M  Backup strategy is under     
systems.  backup systems.  review. 
This would destroy the  Follow protocols correctly.   
security of data making it  Store data safely and in  Work with users to have 
vulnerable to many other  more than two places.  a realistic backup 
risks.  Loss of current data  strategy. 
Duplication of main storage 
with no recent backup 
systems means separate 
would be a major and very 
backup is becoming less 
disruptive incident. 
critical. 
1  Loss of data from major  H  VH  Reliable backup systems  L  M       
systems or their failure.  and procedures in place. 
Major services would  Data is mirrored between 
become unavailable for a  two computer centres. A 
period, eg Financial or HR  third copy is mirrored to a 
systems, student  third location ­ with 
management etc.  optionally a different 
Most likely cause would be  retention time.  
equipment failure.  Virtual servers allow 
functions to be moved 
seamlessly to other 
equipment. 
Some systems duplicated 
across two machine rooms 
with some possibility of 
failover. 
Central systems accessible 
from off­site for ease of 
maintenance out of office 
hours. 
Risks related to loss of electronic connectivity 
1  Loss of internet connection  H  VH  Duplication of main  H  VH  Recent losses of our     
to the University.  connection.  internet connection 
Loss of the Joint Academic  We have 2 independent  through either DDOS 
Network connection could  connections to the JANET  attacks on Janet or 
be due to faults, damage,  network providing our  physical damage have 
commercial decisions or  internet connection, but  led us to open 
other external issues that  both have these have  discussions with Janet 
may not be under control of  recently failed at the same  about a third 
the national academic  time  connection. 
community.  No     
computer­based   
Temporary web pages 
communication off­site, 
available so that the 
including email, would be 
University does not vanish 
possible. 
from the web. 
Attention to cable routes 
during excavations. 
Appropriate maintenance 
on all relevant equipment. 
 
1,7  Loss of telephone  M  H  Use reliable provider, with  L  L       
connection.   This would  secondary one for 
disrupt all normal voice  emergencies. 
communication, and would  Additional connections so 
be a major problem in an  not reliant on one point of 
emergency such as a fire.  connection. 
Attention to cable routes 
during excavations. 
Universal access to mobile 
phone system. 
 
1  Damage or failure to  H  H  Major links across campus  H  L  Recent losses of our     
network infrastructure.  are duplicated.  internet connection 
through either DDOS 
attacks on Janet or 
physical damage have 
Any component could be  Vital services can operate  led us to open 
damaged accidentally or  from one of the two  discussions with Janet 
maliciously, or simply fail.  computer rooms.  about a third 
All electronic  Network breaks are  connection. 
communication including  detected automatically.  Introducing better 
telephones could be lost,  Spares for vital components  liaison with EFM. 
most likely to specific areas.  are kept on site.   
Network equipment is 
housed in locked rooms and 
cupboards across the 
campus. 
Staff are very experienced 
in repairing routine failures. 
 
Risks causing equipment to become unavailable 
1  Mains power failure to vital  H  VH  Central equipment is  H  M  New UPS and power     
equipment.  duplicated between two  tree implemented in CC 
Power­down of key  computer rooms.  DC ­ transition to new 
equipment would disable  Backup power systems In  service 90% complete. 
electronic communication  place for both computer   
and central IT services.  rooms, battery and  Working on Shared Data 
  generator based for short­  Centre project with JISC 
and long­term power.  and northern 
Warning systems and  universities 
contingency procedures in 
place. 
Regular testing of power 
backup systems. 
CiCS has significant 
experience of this type of 
event. 
 
1  Airconditioning failure in  M  H  Redundancy built in to  M  L  Airconditioning systems     
one of the two computer  current airconditioning  are being reviewed and 
rooms.  systems.  should soon be replaced 
Leads to overheating of  Vital services can operate  to improve efficiency 
computer room and likely  from just one computer  and reliability. 
need to shut down at least  room, with effort and   
some equipment.  Result is  disruption in some cases.  Working on Shared Data 
loss or degradation of some  .  Centre project with JISC 
services.  and northern 
Emergency airconditioning 
can be arranged at short  universities 
notice. 
Maintenance contract and 
attention to airconditioning 
maintenance (?) 
1  Flood in a computer room.  L  H  Mains wiring and sockets  L  M  Working on Shared Data     
These are low­lying areas  moved to above underfloor  Centre project with JISC 
with many cable ducts  ‘ground’ level.  New  and northern 
entering below ground  overhead power rails  universities 
level, with a potential to  installed. 
carry water into the  Sump and water detection 
buildings.  Flooding would  system in place with pump. 
disrupt power and other 
Most ducts are watertight. 
cabling leading to loss of 
services.  There are  Vital services can be run 
associated dangers to staff  from one computer room. 
from electricity or   
electrolytic generation of   
flammable gas. 
1  Theft of vital equipment, or  L  H  Computer rooms are  L  M       
associated damage.  physically secure, with 
Targeted theft of IT  careful security procedures. 
equipment has occurred at  Vital services can operate 
other Universities in the  from just one computer 
past.  room, with effort and 
disruption in some cases. 
Vital services would be  Data is replicated to other 
disrupted until  locations  
replacements installed.  Alarms and CCTV in place. 
Confidential data could be   
taken. 
Risk to personal safety in a 
violent theft. 
1  Gas leak into computer  L  H  Gas detection in place.  L  L  Working on Shared Data     
room – eg carried  Most ducts are sealed.  Centre project with JISC 
underground via cable  and northern 
Vital services can operate 
ducts.    universities 
from just one computer 
Risk of explosion, need to  room, with effort and 
evacuate building.  Possible  disruption in some cases. 
need to switch off vital 
equipment.  
Risks involving damage to or major failure of equipment 
1  Major hardware failure.  M  VH  Vital services can be run  M  M       
Can be caused by a range of  from one of the two 
events, both accidental and  computer rooms. 
malicious.  Central equipment is on 
Depending on which  rapid­response 
hardware fails, vital services  maintenance contracts and 
could be disrupted or  many spares are held 
communications lost.  on­site 
1  Escape of high­pressure  L  H  Vital services can be  L  M  Working on Shared Data     
water or steam from main  operated from one of the  Centre project with JISC 
CHP pipes.  These feed  two computer rooms.  and northern 
many buildings, including  Redundancy is built in to  universities 
the Computing Centre.  the major network links. 
Pipes tend to be in the 
CHP systems 
same spaces as Network 
well­maintained (?) 
equipment.  Pressure is said 
to be such that structures 
could be damaged. 
Communications could be 
disrupted including to 
Security control centre. 
1  Fire in a computer room or  L  VH  Fire detection systems in  L  M  Working on Shared Data     
other vital space.  place.  Centre project with JISC 
This could damage vital  Fire suppressant systems in  and northern 
equipment and stop  computer rooms.  universities 
computer­ or  Vital services can be run 
communication services.  from either of two 
computer rooms. 
1  Lightning strike.  L  H  Lightning conductors in  L  M       
Antennae are most  place on computer 
vulnerable, but current  buildings. 
surges could destroy any  Data connections are now 
local equipment, leading to  fibre, so surges not 
loss of any computer or  conducted to other 
communication services.  buildings. 
Vital services can be run 
from either of two 
computer rooms. 
1  Failure of telephone  M  M  Telephone system is split  M  L       
exchange system.  across two computer rooms 
This is essentially another  and can function from 
very reliable computer  either alone. 
server.  Failure would result  Maintenance contract is in 
in loss of all voice  place and attention given to 
communication across the  quality of installation. 
campus and externally.  Mobile phones in almost 
universal use. 
Risks relating to unavailability of physical estate 
1  Serious damage or loss of  L  VH  Vital services can operate  L  M  Working on Shared Data     
use of a Data Centre  from just one computer  Centre project with JISC 
room, with effort and  and northern universitie 
disruption in some cases. 
Good maintenance of 
computer rooms. 
Good security, fire 
detection, burglar alarms 
etc. in place 
Vesda fire prevention 
system in place. 
Third Data Centre  is in 
place. 
1  Loss of use of a building or  M  M  Most vital systems are  M  M       
part building.  designed to be used by staff 
CiCS could be called on to  working from home and 
provide facilities for  web access is a standard 
displaced staff, possibly by  condition for most software 
releasing one or more  procurement. 
student computer rooms.  Student computer rooms 
This would take CiCS staff  have telephone points – 
resource for other tasks and  one has a large number of 
degrade the service to  them for use as an 
students.  emergency 
communications room. 
 
1,4  Loss of significant amounts  L  H  There are back up locations  L  M       
of teaching space, for  in place, both external and 
example if a building closed  in non teaching space at the 
at short notice.  University although this can 
There is enormous pressure  incur signficant expense.. 
on the University teaching  The timetabling team have 
estate and the student  been familiarised with the 
experience could be  entire University estate and 
seriously negatively  can work closely with EFM 
impacted by loss of  colleagues to organise a 
teaching space.   solution quickly. 
Non­ICT Units  ­  University Print Service 
1,4  Print Service unable to  L  H  A business continuity plan is  L  M       
function for a short period  in place, which includes 
due to loss or unavailability  identification of external 
of premises, power,  suppliers. 
equipment, communication 
links or key staff.  This could 
delay the availability of vital 
materials such as exam 
papers or degree 
certificates. 
Non­ICT Units  ­  Performance Spaces 
1,2,4,7  Octagon centre unable to  L  H  A contingency plan is in  L  M       
provide space for major or  place, which includes access 
minor events, internal or  to emergency staffing, 
external, due to damage or  generator etc.  Alternative 
issues affecting the  venues are identified but 
building, unavailability of  availability depends on 
staff, electrical failure.  This  their own schedules. 
could prevent important 
events such as exams and 
degree ceremonies, or 
external income­generating 
events.  And have a major 
impact on the student 
experience and the 
reputation of the 
University. 
1, 2, 4  Drama studio unavailable  L  M  A contingency plan is in  L  M       
for use by external groups  place, which includes 
or internal teaching  recognition that alternative 
departments due to fire or  spaces would be unlikely to 
other damage, loss of  be available.   
power or unavailability of  Internal (teaching) bookings 
staff.   This could hinder  are discussed and clarified 
teaching plans, prevent  as soon as possible. 
income­generating activity 
and damage our reputation. 
Inability to confirm 
bookings to external 
groups, due to lack of 
clarity of internal bookings, 
could lead to loss of 
revenue and reputation. 
 