Professional Documents
Culture Documents
DEPARTMENT OF ENERGY
Energy Center, Rizal Drive Cor. 34th Street, BGC, Taguig City
MESSAGE
The Department of Energy’s Citizen’s Charter is created primarily with the various stakeholders’ interest in mind to
usher them in the rudiments of the agency’s services and easily guide them through the challenges and complexities
in the energy sector. The Charter is specifically designed to provide a clear procedural flow in obtaining a particular
service within definite timeframes.
The Charter elevates the DOE key frontline services to higher level of transparency as it adheres to President
Rodrigo Roa Duterte’s beacon call to alleviate the lives of the common folks, to eliminate bureaucratic red tape and
long queues, and rid the government of any form of corruption.
Feedback system and grievance mechanism were also made integral part of the Charter to allow the transacting
public to bring up their concerns or complaints involving key processes and personnel and to echo their suggestions
and recommendations on how to better improve our services to you, our stakeholders.
We recognize that good governance is essential for sustainable development, both economical and social. Thus, in
our Charter, we have highlighted these three key aspects of transparency, accountability and responsiveness, being
the major reform agenda of the Duterte administration.
*
O R G A N I Z A T I O N A L C H A R T Donato D. Marcos INFRACOM
Jesus Cristino P. Posadas
*
Benito L. Ranque ICC
*
NDC
Office of the Assistant Secretary
Redentor E. Delola PEZA
*
Gerardo D. Erguiza, Jr.
Caron Aicitel E. Lascano
Leonido C. Pulido, III *
NBB
Roberto B. Uy
ENERGY POLICY AND PLANNING ENERGY RESOURCE DEVELOPMENT ENERGY UTILIZATION MANAGEMENT OIL INDUSTRY MANAGEMENT ELECTRIC POWER INDUSTRY RENEWABLE ENERGY MANAGEMENT
BUREAU BUREAU BUREAU BUREAU MANAGEMENT BUREAU BUREAU
J. T. Tamang C.G. Dela Fuente, III P. T. Aquino, CESO III R.E. Abad M. C. Marasigan, CESO III M. C. Capongcol
OIC-Director IV OIC-Director IV OIC-Director IV OIC-Director IV OIC-Director IV OIC-Director IV
PLANNING DIVISION POLICY FORMULATION & PETROLEUM RESOURCES COAL & NUCLEAR ENERGY EFFICIENCY & ALTERNATIVE FUELS & OIL INDUSTRY STANDARDS OIL INDUSTRY POWER PLANNING & POWER MARKET SOLAR & WIND ENERGY GEOTHERMAL ENERGY
RESEARCH DIVISION DEVELOPMENT DIVISION MINERALS DIVISION CONSERVATION DIVISION ENERGY TECHNOLOGY & MONITORING DIVISION COMPETITION & DEVELOPMENT DIVISION DEVELOPMENT DIVISION MANAGEMENT DIVISION MANAGEMENT DIVISION
DIVISION MONITORING DIVISION
M.O. Sinocruz D.V. Vivar G. H. Ansay N. C. Jariel Jr. A. P. Habitan L. M. A. Capricho A. D. T. Lim H. V. Ludovice T. B. Ejercito L. G. Baltazar F. S. Sibayan A. D. Fronda
Chief SRS Chief SRS Chief SRS Chief SRS (OIC) Chief SRS Chief SRS OIC-Chief SRS (OIC) Chief SRS Chief SRS Chief SRS
ENERGY COOPERATION & NATURAL GAS RETAIL MARKET RURAL ELECTRIFICATION BIOMASS ENERGY HYDROPOWER & OCEAN
COORDINATION DIVISION MANAGEMENT DIVISION MONITORING & SPECIAL ADM. & MGT. DIVISION MANAGEMENT DIVISION ENERGY MANAGEMENT
CONCERNS DIVISION DIVISION
L. C. Fernandez M. L. L. Saguin A. H. Rayos M.L.L. Olap R. B. De Guzman A. F. Ulgado
Chief SRS Chief SRS (OIC) Chief SRS Chief SRS
(OIC)
NATIONAL RENEWABLE
ENERGY BOARD
TECHNICAL SECRETARIAT
& MANAGEMENT DIVISION
INFORMATION TECHNOLOGY & LEGAL SERVICES FINANCIAL SERVICES ADMINISTRATIVE SERVICES ENERGY RESEARCH TESTING & G. G. Escobar, Jr.
MANAGEMENT SERVICES LABORATORY SERVICES Chief SRS
H. A. Ariola, CESO IV A. T. Tenazas, CESO IV A. A. S. Soluta A. V. Manga, CESO IV A. M. De Guzman CESO IV
Director III Director III Director III Director III Director III
INFORMATION INFORMATION DOWNSTREAM GENERAL LEGAL SERVICES BUDGET DIVISION ACCOUNTING DIVISION HUMAN RESOURCE GENERAL SERVICES GEOSCIENTIFIC RESEARCH & LIGHTING & APPLIANCE
TECHNOLOGY DIVISION SERVICES DIVISION CONVENTIONAL ENERGY SERVICES DIVISION MANAGEMENT DIVISION DIVISION FUEL TESTING LAB. DIVISION TESTING DIVISION
LEGAL SERVICES DIVISION
J. P. Ritual R. S. Añano G.B. Corpuz J.G. Padolina E. B. Morales M.G. Penaranda M.C.P. Baldos D. L. Lontok V. S. Llamo I. C. Soriano
ITO III ITO III Atty V Atty V Chief AO (OIC) (OIC) Chief SRS Chief SRS
Chief AO
INFORMATION & DATA POWER LEGAL SERVICES RENEWABLE ENERGY LEGAL CONVENTIONAL ENERGY RENEWABLE ENERGY TREASURY DIVISION PROCUREMENT
MANAGEMENT DIVISION DIVISION SERVICES DIVISION RESOURCES DIVISION RESOURCES COMPLIANCE MANAGEMENT DIVISION
DIVISION
D. N. Javier M. F. F. Roa D.D. Villanueva T. M. Cerdeña L. P. Esmale F. G. Domingo
Chief SRS Atty V Chief TAS M. T. Posada Chief AO
Atty V (OIC)
Chief TAS
ENERGY RESOURCE ENERGY INDUSTRY ENERGY RESOURCE ENERGY INDUSTRY ENERGY RESOURCE ENERGY INDUSTRY
DEV’T & UTILIZATION MANAGEMENT DEV’T & UTILIZATION MANAGEMENT DEV’T & UTILIZATION MANAGEMENT LEGEND:
DIVISION DIVISION DIVISION DIVISION DIVISION DIVISION # - UNDER DOE SUPERVISION
R. V. Liganor R. B. Callangan, Jr. L. Arciaga O. U. Belarmino E. P. Obelidhon T. R. Alingalan * - SECRETARY SITS AS MEMBER
Chief SRS Chief SRS Chief SRS (OIC) OIC-Chief SRS OIC-Chief SRS ** - CES ELIGIBLE
PERFORMANCE PLEDGE
We, at the Department of Energy, commit to :
CORE VALUES
In support of the DOE PERFORMANCE PLEDGE, we adhere to these CORE VALUES:
As we strive to continually improve our services, we value your feedback on the quality of service we
have given you.
The following are the channels of access for your feedback, complaints, and suggestions:
or fill out the Customer’s Feedback Form or Complaint/Suggestion Form available from the DOE website :
www.doe.gov.ph or from the CWPS.
Send the form through fax, e-mail or through the above address.
DURATION DURATION
(WORKING DAYS) PROCESS (WORKING DAYS)
PROCESS
FROM TO FROM TO
Application for Petroleum Service Contract under the Application for Coal Operating Contract (COC) under
170 45 148 30
Philippine Energy Contracting Round (PECR) the Philippine Energy Contracting Round (PECR)
Application for Petroleum Subcontract Registration New 3 Application for Registration of Coal Sub-Contract New 3
Confirmation of Performance Bond Posting New 3
Confirmation of Performance Bond Posting New 3
Request for copy of service contract New 3.5
Request for Copy of Coal Operating Contract New 3.5
Tax-Exemption Certificate (TEC) Application under
5 4
P.D. 87 Application for Tax-Exemption Certificate under PD 972 5 4
Request for Oil & Gas Seepage Investigation New 15 Application for Coal Reconnaissance Permit 4.5 3
Application for Gratuitous Permit New 12 Application for Small Scale Coal Mining Permit 10 14
Request for Visa Endorsement New 2.5
Application for Safety Engineer’s and/or Safety
3 2
Inspector’s Permit
DURATION DURATION
(WORKING DAYS) PROCESS (WORKING DAYS)
PROCESS
FROM TO FROM TO
ENGAGEMENT OF GENERATION COMPANIES IN
PROPOSED REGISTRATION PROCESS OF RENEWABLE ENERGY REGULATIONS NO. 1-94 PROGRAM
ENERGY DEVELOPER (STAGE 1) 68 48
(THROUGH THE ESTABLISHMENT OF TRUST
ACCOUNTS)
PROPOSED REGISTRATION PROCESS OF RENEWABLE
180 45
ENERGY DEVELOPER (STAGE) CERTIFICATE OF ENDORSEMENT (COE)
68 + 4.5 24
TO THE ENERGY REGULATORY COMMISSION (ERC)
PROPOSED REGISTRATION PROCESS OF RENEWABLE
ENERGY DEVELOPER (STAGE 3) GRANTING OF FINANCIAL BENEFITS TO HOST 45 DAYS
COMMUNITIES UNDER ER 1-94, AS AMENDED 76 per Project
APPLICATIONS FOR ACCREDITATION OF A BIOFUEL PROCESS FLOW IN ACCESSING DLF AND RWMHEEF Proposal
15 15
MANUFACTURER
GRANTING OF FINANCIAL BENEFITS TO HOST
COMMUNITIES UNDER ELECTRIFICATION FUND OF ER 64 57 DAYS
1-94, AS AMENDED
ENERGY UTILIZATION AND MANAGEMENT BUREAU (EUMB) AVAILMENT OF SUBSIDY UNDER THE NATIONWIDE
44 Days per Project
INTENSIFICATION OF HOUSEHOLD ELECTRIFICATION 51
Proposal
(NIHE) PROGRAM
DURATION
QUALIFIED THIRD PARTY APPLICATIONS FOR
(WORKING DAYS) ENDORSEMENT TO ERC
New 57.5
PROCESS
APPLICATIONS FOR PV MAINSTREAMING PROGRAM
FROM TO UNDER ELECTRIFICATION FUND OF ER1-94, AS New 64
AMENDED
APPLICATIONS FOR CERTIFICATE OF AUTHORITY TO
IMPORT (CAI) 4 2.5 1ST ENDORSEMENT TO THE SECURITIES AND
New 2.5
(Natural Gas Vehicle Program for Public Transport) EXCHANGE COMMISSION (SEC)
ENERGY AUDIT SERVICES: PRELIMINARY AUDIT 7 5 CLEARANCE TO UNDERTAKE SYSTEM IMPACT STUDY
(SIS) ENDORSEMENT TO THE NATIONAL GRID New 4.5 (RE)
ENERGY AUDIT SERVICES: DETAILED AUDIT 27 18 CORPORATION OF THE PHILIPPINES (NGCP)
APPLICATIONS FOR ENERGY SERVICE COMPANY
16 13 ENDORSEMENT OF CERTIFICATE OF NON-OVERLAP
(ESCO) ACCREDITATION
(CNO) & CERTIFICATION PRECONDITION (CP) TO THE
New 2.5
TECHNOLOGY TRANSFER FOR ENERGY NATIONAL COMMISSION ON INDIGENOUS PEOPLES
MANAGEMENT (TTEM) PROJECT SELECTION AND 6 6 (NCIP)
APPROVAL
CERTIFICATION TO THE PHILIPPINE NATIONAL POLICE
SEC 1ST ENDORSEMENT FOR ISSUANCE OF DOE 2ND (PNP) AS A REQUIREMENT FOR THE ISSUANCE OF
New 6
ENDORSEMENT THE LICENSE TO POSSESS EXPLOSIVES/EXPLOSIVE New 2.5
INGREDIENTS/CONTROLLED CHEMICALS AS
PURCHASER
APPLICATION FOR DIRECT CONNECTION New 65
OIL INDUSTRY MANAGEMENT BUREAU (OIMB)
ENERGY POLICY AND PLANNING BUREAU (EPPB)
DURATION
DURATION
PROCESS (WORKING DAYS) (WORKING DAYS)
PROCESS
FROM TO
FROM TO
PROVISION OF OIL INDUSTRY DATA / STATISTICS / INFORMATION
TO VARIOUS CLIENTS 4 2 PROVISION OF PHILIPPINE ENERGY PLAN (PEP) DATA
/ KEY ENERGY STATISTICS AND OTHER ENERGY-
4 4
RELATED INDICATORS / INFORMATION TO VARIOUS
ENDORSEMENT TO SECURITIES AND EXCHANGE COMMISSION PUBLIC CLIENTS
4 3
(SEC)
TO ENGAGE IN ANY ACTIVITY IN THE DOWNSTREAM OIL
6.5 4
INDUSTRY INFORMATION TECHNOLOGY AND MANAGEMENT SERVICES (ITMS)
DOE ENDORSEMENT FOR BOI REGISTRATION 5 4
DOE ENDORSEMENT FOR BOI INCENTIVES AVAILMENT 9 8 DURATION
(WORKING DAYS)
IMPORTATION/EXPORTATION OF PETROLEUM PRODUCTS, PROCESS
LUBES, GREASES, OTHER PETROLEUM-BASED PRODUCTS AND 3.5 4
BIOETHANOL
FROM TO
CERTIFICATE OF ACCREDITATION AS AN OIL INDUSTRY
7 4 TECHNICAL EVALUATION OF SMALL-SCALE COAL
PARTICIPANT UNDER THE FUEL BIOETHANOL PROGRAM 8 3
MINING (SSCM) APPLICATION AREA
TO PURCHASE LOCAL BIOETHANOL New 6
CONDUCT / TECHNICAL EVALUATION / APPROVAL OF
29 23
REGISTRATION OF FUEL ADDITIVE – Certificate of Additive COAL BLOCK BOUNDARY SURVEY
19 14
Registration (CFAR)
PROVISION OF GEOMATICS INFORMATION AND
3 3
PROVISIONAL REGISTRATION OF FUEL ADDITIVE – Certificate of SERVICES
9 10
Additive Registration (CFAR)
PROVISION OF CARTOGRAPHIC, INFOGRAPHIC AND
3 3
SECURING STANDARDS COMPLIANCE CERTIFICATE OTHER MAPS
9 5
REFINER/IMPORTER/BULK SUPPLIER/FACILITY
PROVISION OF ENERGY DATA & INFORMATION THRU
3 0.5
SECURING STANDARDS COMPLIANCE CERTIFICATE ENERGY DATA CENTER (RESEARCHERS)
9 5
REFILLER/MARKETER/DEALER/RETAILER/HAULER/FACILITY
PROVISION OF ENERGY DATA & INFORMATION THRU
SECURING CERTIFICATE OF COMPLAINCE 18 5 ENERGY DATA CENTER (SERVICE 3 1
CONTRACTORS/INVESTORS)
AVAILMENT OF GASOLINE STATION LENDING AND FINANCIAL
50 45
ASSISTANCE PROGRAM (GSLFAP) PROVISION OF ENERGY DATA & INFORMATION THRU
3 0.5
THE DOE LIBRARY
APPLICATIONS FOR PERMIT FOR THE CONSTRUCTION,
OPERATION & MAINTENANCE, EXPANSION, EXTENSION, 50
75 UPLOADING / POSTING OF ENERGY INFORMATION
MODIFICATION OF NATURAL GAS TRANSMISSION & 4.5 1.5
THRU THE DOE WEBSITE / PORTAL
DISTRIBUTION PIPELINE PROJECTS
APPLICATIONS FOR PERMIT FOR THE CONSTRUCTION, UPLOADING / POSTING OF PRESS RELEASES THRU
1.5 0.75
OPERATION & MAINTENANCE, EXTENSION, EXPANSION, & 50 THE DOE WEBSITE / PORTAL
75
MODIFICATION OF NATURAL GAS DISTRIBUTION-RELATED
FACILITIES
APPLICATIONS FOR PERMIT TO SUPPLY NATURAL GAS 60 45
ENERGY RESEARCH AND TESTING LABORATORY SERVICES (ERTLS) LEGAL SERVICES (LS)
DURATION DURATION
(WORKING DAYS) PROCESS (WORKING DAYS)
PROCESS
FROM TO FROM TO
REGISTRATION OF SUBCONTRACTS/AGREEMENTS
New 2
FOR COAL AND PETROLEUM OPERATIONS
DURATION
PROCESS (WORKING DAYS)
FROM TO
ACCREDITATION OF INSURANCE / BONDING
3 2
COMPANIES
DURATION
PROCESS (WORKING DAYS)
FROM TO
DURATION
PROCESS (WORKING DAYS)
FROM TO
DURATION
(WORKING DAYS)
PROCESS
FROM TO
REC/ REC Secretariat Preparation of REC Endorsement to the Secretary for the award 2 days
of contract to the compliant/winning applicant
Office of the President (OP) If approved, Issuance of Notice for Contract Signing to the 15 days
DOE Secretary
REC / REC Secretariat Notify winning applicant of the Notice for Contract Signing 1 day
& Payment of Processing Fee
2. Opening of Proposals and checking for 0.5 day DOE Review and Evaluation Committee
completeness of applications (REC) Secretariat
6. If approved, issuance of Notice for Contract 15 days Office of the President (OP)
Signing to the Energy Secretary
B.1 Proposed work program (discussion of the exploration strategies and methodologies to be employed c. Prospect/Lead evaluation
in delineating petroleum resources with subsequent manpower complement should be in detailed
narrative format including the Schedule of Activities in a Gantt Chart) and minimum expenditure for each The following shall be evaluated for each prospect:
proposed activity with respect to the area or areas specified in the proposal.
• depositional environment/reservoir type(s);
Work program and minimum expenditure with respect to the proposal: • trap and seal; and
• hydrocarbon type, source, migration and trap fill.
Plan for exploration and work commitment
The following documentation is required for each prospect:
A description of the exploration strategy for the Contract Area applied for. This shall include:
▪ seismic data acquisition as appropriate; • overview map with coordinates and prospect;
▪ exploration and appraisal wells; and • seismic and geological cross-section(s);
▪ other geological and geophysical studies. • seismic line showing well ties, where relevant reservoir horizon time-
and-depth maps presented at identical scales; and
A proposed minimum exploration commitment including: • seismic attribute maps.
The analysis must focus on aspects that are considered critical in the evaluation of the
prospectivity of the Contract Area applied for.
APPLICATION FOR PETROLEUM SERVICE CONTRACT
UNDER THE PHILIPPINE ENERGY CONTRACTING ROUND
b. Project Economics D.2 For newly-organized corporations existing for less than two (2) years at the time of filing of application:
Development scenarios and production profiles shall be calculated for the different outcomes in
the resource distribution. Key economic parameters are calculated either by stochastic (Monte a. Original Copy of the Audited Financial Statements (FS) or unaudited FS duly signed by the responsible official such as the President
and/or Chief Finance Officer;
Carlo simulation) or deterministic P10, P90 and expected/most likely) methods. Key economic
b. Original Copy of the Bank Certification to substantiate the cash balance as of the latest unaudited FS; and,
parameters shall be calculated for the project. c. Original Copy of the Projected Cash Flow Statement for three (3) years covering fund sources and uses for the particular offered
area, other applied PECR areas, renewable energy service contract applications, existing service/operating contracts with DOE and
C. Technical Documentation other existing business, if applicable.
D.3 For Parent Company that guarantees for corporations with insufficient working capital:
C.1 Upstream Petroleum Projects
Parent Company’s fund guarantee shall be limited to the corresponding participating interest and shall submit the following:
The applicant shall submit an overview of all its Upstream Petroleum-related Projects.
a. Original Copy of the Parent Company's financial documents per D.1.a and D.1.b; and
b. Original Copy of duly notarized Letter of Undertaking / Support from the Parent Company to fund the Work Program.
C.2 Technical Personnel
D.4 Minimum working capital (Liquid Assets less Current Liabilities) is 100% of the financial commitment for the first contract year of the
Relevant Experience proposed work program and budget. Liquid Assets shall consist only of cash, trade accounts receivables and short term
a. Educational Attainment investments/placements. Credit line is not a Liquid Asset.
b. Employment Status
D.5 The applicant shall have available working capital for each PECR application separate from other applied PECR areas, renewable
energy service contract applications and existing energy service/operating contracts, if applicable.
Particulars of the technical and industrial qualifications, eligibilities and work-related experiences of
the applicant and its employees. Particulars on the experiences, achievements, and track records of CHARGES AND FEES
the applicant and its employees related to technical and industrial undertakings. Operational
organization, including resources, expertise, and experience. • Application fee: Php 200,000.00 / area
• Processing fee: Php 0.48/hectare
D.1 For corporations existing for more than two (2) years at the time of filing of application: • PD 87
• DC2014-02-0005
Original Copy of the Annual Report or Audited Financial Statements (FS) for the last two (2) years from
the filing date and Original Copy of the latest Unaudited FS duly signed by the responsible official such
as the President and/or Chief Finance Officer if the Audited FS is more than six (6) months old at the
time of filing;
Original Copy of the Bank Certification to substantiate the cash balance as of the latest unaudited FS;
Original Copy of the Projected Cash Flow Statement for three (3) years covering fund sources and uses
for the particular offered area, other applied PECR areas, renewable energy service contract
applications, existing service/operating contracts with DOE and other existing business, if applicable;
and,
For domestic corporations, certified true copy of the latest income tax return filed with the Bureau of
Internal Revenue, and duly validated with the tax payments made thereon.
APPLICATION FOR PETROLEUM SUB-CONTRACT REGISTRATION
Submission of Application
1 hour
TL: 4792900
Records Management Division (RMD) Transmittal of application to OD-ERDB loc. 407 Basement, DOE Main
Building
Technical Evaluation
No
Petroleum Resources Development Division (PRDD) Technically Local 366 4F, PNOC Building 6
Qualified 1 day
Legal Evaluation
No
Contracts Division-Legal
Legally Qualified? 1 day Local 234 ERL Building 3
Services
Yes
Issuance of Confirmation of
OD-ERDB Subcontract Registration 3 hours
LIST OF REQUIREMENTS
•Two (2) copies of Subcontracts for registration;
•Summary of submission indicating the Service Contract to which it is applied for, document type and control
number, title of subcontract, name of subcontractor, date of execution and notarization and total amount
involved in the contract.
•Subcontracts for registration must be submitted within 6 months from date of the last signature in the
subcontract (date of execution). Late subcontracts will be penalized.
PENALTY
•Penalty for late submissions is Php 10,000.00 per late subcontract.
LEGAL BASES
•PD 87
NOTES:
• Timeline is for one (1) submitted subcontract.
• Subcontracts must be submitted within 6 months of effective date. Late submissions will be penalized.
Penalty must be paid within 60 days from receipt of notice to avoid disallowance for cost-recovery.
CONFIRMATION OF PERFORMANCE BOND POSTING
Submission of Application
Office of the Director - Energy Resource Local 343 4F, PNOC Building 6
Endorsement for Technical Evaluation 1 hour
Development Bureau (OD-ERDB)
Petroleum Resources Development Division (PRDD) Local 366 4F, PNOC Building 6
Technical Evaluation
2 days
NO
Technically
Qualified?
Submission of Performance Bond insurance policy for the work commitment under a Contract Year or
Sub-phase of a Petroleum Service Contract
3 Working Days
LIST OF REQUIREMENTS
• Must be submitted within 60 days from entry into the next Contract Year (CY) or Sub-
phase (SP) depending on contract terms
LEGAL BASES
• PD 87
• Section VII of Petroleum Service Contract
REQUEST FOR COPY OF PETROLEUM SERVICE CONTRACTS
Submission of Application
TL: 4792900
Records Management Division (RMD) Transmittal of request 1 hour loc. 407 Basement, DOE Main
to OD-ERDB Building
Office of the Director – Energy Resource Endorsement of request Local 343 4F, PNOC Building 6
1 hour
Development Bureau (OD-ERDB)
YES Request NO
Request Approved?
Approved?
LIST OF REQUIREMENTS
• Formal Letter of Request
LEGAL BASIS
• Executive Order No. 1 (July 24, 2016)
TAX-EXEMPTION CERTIFICATE (TEC) APPLICATION under P.D. 87
Treasury Division Payment of Processing Fee 30 mins Loc. 233 GF, DOE Annex Building
Cleared?
Yes No 1 hour
Release of TEC
RMD & Transmittal of TEC to DOF and retention of 1 hour
duplicate copy
LIST OF REQUIREMENTS
• Five (5) copies of application form duly signed by company representative, notarized and sealed by Notary Public
• TEC application number, official receipt of processing fee
• Company purchase order, use/s, justification
• Computation of taxes waived
• BED Circular No. 81-11-09, if applicable
PROCESSING FEE
• Php 750.00 / application
LEGAL BASES
• PD. 87
• A.O. No. 31 Series of 2012
REQUEST FOR OIL & GAS SEEPAGE INVESTIGATION
1 hour
TL: 4792900
loc. 407 Basement, DOE Main
Records Management Division (RMD) Transmittal to OD-ERDB
Building
Petroleum Resource Development Division (PRDD) & Loc. 366 4F, PNOC Building 6
Energy Research and Testing Laboratory Services Loc. 246 ERL Building 1
Field Sampling & Investigation/Sampling Analysis* 10 days
(ERTLS)
Requesting for an Oil and Gas Seepage Field Sampling and Investigation
15 Working Days
LIST OF REQUIREMENTS
1. Full Name and contact details of the requestor /applicant;
2. Ownership details of the land to be investigated (private or public);
3. Attached written approval from the ownership (private) / LGU’s written request (public) for site
investigation; and
4. Attached map showing location, Geographic coordinates, Municipality, Barangay and Sitios
where the seepage occurs
1 Hour
Release of Permit
Please refer to the attached List of Requirements 1,000.00 pesos (Based on DOE PD 508
Applicant
Fees and Charges DOE CY 2013
DOE
pursuant to AO No. 31 Series
of 2012)
12 DAYS
APPLICATION FOR GRATUITOUS PERMITS (P.D. 508)
LEGAL BASIS
2. Issuance of Order of Payment, 1 Hour PRDD Clerk
Payment of Application Fee Treasury Division Clerk
• PD 508
3. Endorsement for Evaluation 1 Hour Energy Resource Development Section 1. All small or sub-commercial natural marsh gas or methane gas deposits found in any public
Bureau (ERDB) – Office of the or private lands, not exceeding 1000 feet in depth and not associated with crude oil deposit, within the
Director (OD) territorial limits of the Philippines which are within free areas, national reserve areas, in any other areas
4. Area Evaluation 2 Days Information Technology and not covered by valid and subsisting petroleum exploration or exploitation concessions, or by service
Management Services (ITMS) contracts entered with the Government under Presidential Decree No. 87, may be developed for
5. Technical and Legal Evaluation 6 Days PRDD Technical Personnel/ household use or utilized for small scale industrial development.
Note: If details are not complete, Contracts and Negotiations, Legal
notify requestor to complete personnel NOTES:
requirements for resubmission.
1.Applicable to small or sub-commercial natural marsh-gas or methane gas deposits only
6. Preparation of Evaluation Report 2 Days PRDD Technical Personnel/
2.The area to be covered by the application shall not be more than 20 hectares in a block rectangular in shape as
Memorandum Contracts and Negotiations, Legal
much as possible. The larger sides of the rectangle shall not be more than five times the shorter sides.
personnel
7. Approval and Release of Permit 1 Day OD-ERDB, RMD
12 Working Days
LIST OF REQUIREMENTS*
1. Summary of application containing information on company name, contract areas applied for, work
obligation and minimum expenditures
2. Legal documentation including Articles of Incorporation, By-laws, Certificate of Registration,
Certificate of Authority, Information Sheet of Corporation, Resume/Profile of Incorporation
3. Financial documentation including latest annual report/audited financial statements. For newly
organized subsidiary, parent company financial statements and parent guarantee
4. Work program / economic documentation including proposed service contract, geological and
geophysical evaluation, economics and development concepts of possible discoveries, minimum
expenditures
5. Technical documentation including map, seepage report, operating experience, available technical
and industrial resources, HSE approach and standards, and commitment to the development of
human resources in the Philippines and use of local goods and services
REQUEST FOR VISA ENDORSEMENT
Submission of application
1 hour
TL: 4792900
loc. 407 Basement, DOE Main
Records Management Division Transmittal of documents to OD-ERDB Building
No
Legally qualified?
2 days
Yes
LIST OF REQUIREMENTS
LEGAL BASIS
• P.D. 972
COAL AND NUCLEAR MINERALS DIVISION(CNMD)
DURATION
PROCESS (WORKING DAYS)
FROM TO
Application for Coal Operating Contract (COC) under 148 30
the Philippine Energy Contracting Round (PECR)
No 4 Hours
COMPLETE
Submission?
REC / REC Secretariat Notify winning applicant of the Notice for Contract
1 day
Signing & Payment of Processing Fee
TD 4 Hours
Payment of processing fee
Applicant, Secretary & RMD 6 days
Preparation of PSC , Signing, Notarization, Transmittal,
Recording and Release of PSC
2. Opening of Proposals and checking for 4 Hours DOE Review and Evaluation 3.Submitted application must be in both paper and digital (CD-ROM / USB Drive in Microsoft Word or .pdf
completeness of applications format) copies. Times New Roman 12 font and single line spacing are recommended. Figures shall be
Committee (REC) Secretariat submitted in an appropriate format, no larger than A3 size. For legibility, figures and maps shall be submitted
at a larger scale as appendices.
Note: This happens on a set date as
dictated by the published PECR 4.A non-refundable application fee of Php 50,000.00 per area shall be paid by the applicant upon submission
of the application and its supporting documents. Payment may be made in cash, manager/company cheque
timeline, and not immediately after payable to Department of Energy or wire/bank transfer. All wire/bank transfer should be net of all applicable
submission. bank and financial charges.
3. Legal, Technical and Financial 15 days REC / REC Secretariat
5.Both the original paper copy and the digital copy of the application shall be addressed to:
Evaluation of applications, in-house
review and endorsement to REC The Chair
4. REC Endorsement to the Secretary for 2 days REC Review and Evaluation Committee (REC)
award of contract to the winning Department of Energy
Energy Center, Rizal Drive
applicants Bonifacio Global City
5. Review & Approval of 5 days Secretary Taguig City, Metro Manila, 1632
Recommendation Philippines
Telefax: (632) 840-2074
6. If approved, notify winning applicant of 1 day REC / REC Secretariat
the Notice for Contract Signing and 6.The application may be sent by courier, registered mail, or hand delivered and shall be stamped received by
Payment of Processing Fee the DOE Records Management Division not later than 1100H of the announced deadline date and the REC
shall open the submitted applications at 1330H on the same day as prescribed in Annex B-1 hereof.
7. Payment of Processing Fee 4 Hours TD
7.The DOE will award one Coal Operating Contract for each Contract Area. Within seven (7) days from receipt
8. Preparation of COC, Signing, 6 days Applicant, Secretary & RMD of notice of award, the winning applicant shall pay a processing fee of Php 30,000.00 per block based on
Notarization, Transmittal, Recording and DOE’s Schedule of Fees and Charges in compliance with Executive Order No. 197, series of 2000.
Release
8.Interested applicants may apply for non-exclusive reconnaissance permit with the REC valid until the
30 Working Days (from opening of proposals) deadline for submission of applications as prescribed in Annex B-1 hereof.
9.The work equivalents as provided for in Chapter 4 Section III of BED Circular 81-11-10 or “Guidelines for
Coal Operations in the Philippines” shall be applied.
10.Only exploration work program in the application for coal operating contract that conforms to the
exploration Work Program Documentation as required under this Circular shall be accepted.
11.A company shall be entitled to not more than fifteen (15) blocks of coal lands, including existing COCs, in
any one coal region pursuant to Section 6, PD 972 as amended.
APPLICATION FOR COAL OPERATING CONTRACT
UNDER THE PHILIPPINE ENERGY CONTRACTING ROUND
Email Address: Website: B.3 Schedule of Works and Manpower Requirements in Gantt Chart; and,
C. Technical Documentation
PECR Area Applied for: C.1 Particulars of technical and industrial resources available to the applicant for the exploration
of coal resources;
Proposed Signature Bonus:
C.2 Particulars on the technical and industrial qualifications, eligibilities and work related
Proposed Training Assistance: experiences of the applicant and its employees;
Proposed Development Assistance Fund: C.3 Particulars on the experiences, achievements and track records of the applicant and its
employees related to technical and industrial undertakings; and,
It is certified that the foregoing information are true and correct. It is understood that any C.4 Particulars on organizational and management structures relative to administration,
financial and technical aspects of the applicant.
omission or misrepresentation of the required information shall be sufficient cause for the
rejection of this application. D. Financial Documentation
________________________________________ D.1 For corporations existing for more than two (2) years at the time of filing of application:
Authorized Representative Name and Signature:
a. Original Copy of the Annual Report or Audited Financial Statements (FS) for the last two (2)
years from the filing date and Original Copy of the latest Unaudited FS duly signed by the
responsible official such as the President and/or Chief Finance Officer if the Audited FS is
A.2 Certified true copies of the Securities and Exchange Commission (SEC) Certificate of more than six (6) months old at the time of filing;
Registration, Articles of Incorporation and By-Laws. The corporate purpose of the
applicant shall include the exploration, development and utilization of coal resources; b. Original Copy of the Bank Certification to substantiate the cash balance as of the latest
A.3 Certified true copy of the General Information Sheet (GIS) stamped received by the unaudited FS;
Securities and Exchange Commission (SEC) not more than twelve (12) months old at the
time of filing of application; c. Original Copy of the Projected Cash Flow Statement for three (3) years covering fund
sources and uses for the particular offered area, other applied PECR areas, renewable
A.4 Original Copy of the Certificate of Authority from the Board of Directors of the applicant energy service contract applications, existing service/operating contracts with DOE and
authorizing a designated representative/s to apply, negotiate, sign any documents and other existing business; if applicable; and,
execute the coal operating contract. The said Certificate of Authority shall be executed
under oath by the Corporate Secretary; and,
d. A certified true copy of the latest income tax return filed with the Bureau of Internal
A.5 In case the applicant is a partnership or cooperative, it shall submit the legal documents Revenue, and duly validated with the tax payments made thereof.
as specified in A.2 to A.4 above, or its equivalent, issued or authenticated by the
appropriate governing authorities.
APPLICATION FOR COAL OPERATING CONTRACT
UNDER THE PHILIPPINE ENERGY CONTRACTING ROUND
D.2 For newly-organized corporations existing for less than two (2) years at the time of filing of
application:
a. Original Copy of the Audited Financial Statements (FS) or unaudited FS duly signed by the
responsible official such as the President and/or Chief Finance Officer;
b. Original Copy of the Bank Certification to substantiate the cash balance as of the latest
unaudited FS; and,
c. Original Copy of the Projected Cash Flow Statement for three (3) years covering fund sources
and uses for the particular offered area, other applied PECR areas, renewable energy service
contract applications, existing service/operating contracts with DOE, and other existing
business, if applicable.
D.3 For Parent Company that guarantees for corporations with insufficient working capital. Financial
guarantees of foreign companies to their subsidiaries that are shareholders of the applicant shall be
limited to their equity participation in the allowable maximum forty percent (40%) foreign capitalization.
a. Original Copy of the Parent Company's financial documents per D.1.a and D.1.b;
b. Original Copy of duly notarized Letter of Undertaking/ Support from the Parent Company to
fund the Work Program; and,
c. General Information Sheet (GIS) of the shareholders of the applicant availing of the Parent
Company fund guarantee.
D.4 Minimum working capital (Liquid Assets less Current Liabilities) is 150% of the financial
commitment for the first contract year of the proposed work program and budget. Liquid Assets
shall consist only of cash, trade accounts receivables and short term investments/placements.
Credit line is not a Liquid Asset.
D.5 The applicant shall have available working capital for each PECR application separate from other
applied PECR areas, renewable energy service contract applications and existing energy
service/operating contracts.
LEGAL BASES
Submission of Application
Office of the Director - Energy Resource Loc. 343 4F, PNOC Building 6
Endorsement for technical evaluation 1 hour
Development Bureau (OD-ERDB)
Technical Evaluation
No
Technically Loc. 266 4F, PNOC Building 6
Coal and Nuclear Minerals Division (CNMD) Qualified 1 day
Yes Notify Applicant of the reason for
disapproval
Endorsement to Legal Services
Legal Evaluation
No
Issuance of Confirmation of
OD-ERDB Subcontract Registration 3 hours
3 Working Days
LIST OF REQUIREMENTS
1. 2 copies of subcontract to be registered for cost recovery purposes.
2. Summary of submission (with DOE-prescribed format)
Notes:
• Timeline is for one (1) submitted subcontract.
• Subcontracts must be submitted within 6 months of effective date. Late submissions will be
penalized. Penalty must be paid within 60 days from receipt of notice to avoid disallowance for
cost-recovery.
LEGAL BASES
• P.D. 972
• DC 2014-08-0013 amending OEA Circular No. 89-01-02
CONFIRMATION OF PERFORMANCE BOND POSTING
Submission of Application
1 hour
TL: 4792900
Records Management Division (RMD) Transmittal of documents loc. 407 Basement, DOE Main
to OD-ERDB Building
NO 2 days
Technically
Qualified?
4. Issuance of Confirmation of
4 hours OD-ERDB
Performance Bond Posting
3 Working Days
LIST OF REQUIREMENTS
1. Original performance bond document
• Must be submitted within 30 days after the effective date of contract or upon the implementation of the
succeeding contract year.
LEGAL BASES
• P.D. 972
• Section V of the Coal Operating Contract
REQUEST FOR COPY OF COAL OPERATING CONTRACT
TL: 4792900
loc. 407 Basement, DOE Main
Records Management Division (RMD) Transmittal of request 1 hour
Building
to OD-ERDB
Office of the Director – Energy Resource Development 1 hour Loc. 343 4F, PNOC Building 6
Bureau (OD-ERDB) Endorsement of request
Coal and Nuclear Minerals Division (CNMD) Request evaluated and endorsed to 1 day Loc. 266 4F, PNOC Building 6
Legal Services for appropriate action
Contracts Division-Legal Services Legal Evaluation 2 days Loc. 234 ERL Building 3
RELEASE APPROVED?
Applicant
Formal Letter of Request No Fees • EO No. 1
DOE (July 24, 2016)
3.5 DAYS
REQUEST FOR COPY OF COAL OPERATING CONTRACT
LIST OF REQUIREMENTS
• Formal Letter of Request
LEGAL BASIS
• Executive Order No. 1 (July 24, 2016)
APPLICATION FOR TAX-EXEMPTION CERTIFICATE (TEC) under P.D. 972
Cleared?
No 30 mins
Yes
Release of TEC
& Transmittal of TEC to DOF and retention of
RMD duplicate copy 30 mins
ESTIMATED
PROCEDURES CONTACT UNIT
TIME
1. Submission of complete set of application 1 hour Records Management Division (RMD)
requirements and transmittal to ERDB
2. Payment of processing fee 30 mins Treasury Division
3.Technical / Legal Evaluation 1 day Coal and Nuclear Minerals Division
(CNMD) / Contracts Division-Legal
Services (CD-LS)
4. If technical/legal requirements satisfied: 1 hour CD-LS
- Prepare Endorsement Memorandum for
Clearance of TEC
NOTE: If technical/legal requirements are not
satisfied: - Notify Service Contractor of the
reason for disapproval
5. Endorsement for clearance to 3 hours Office of the Director, Energy
Undersecretary/ Secretary Resource Development Bureau (OD-
ERDB)
Coal and Nuclear Minerals Division (CNMD) Issuance of order of payment 30 minutes Loc. 266 4F, PNOC Building 6
1 hour
CNMD Endorsement for Area Clearance Notify applicant of the
reason of disapproval
GF, Data Bank Building
1day Loc. 254
Information Services Division (ISD), ITMS Area Clearance Evaluation
No
Free Area?
Yes
CNMD Technical Evaluation 1 day
No
Free Area?
ERDB 3 hours
Review and approval of permit
30 minutes
CNMD Recording of permit
RMD 30 minutes
Release of Permit
TL: 4792900
Records Management Division (RMD) Transmittal of documents to OD-ERDB 1 hour loc. 407 Basement, DOE Main
Building
No
Information Services Division (ISD), ITMS Loc. 254 GF, Data Bank Building
Area clearance evaluation by ITMS 3 days
No
Free Area?
Yes
A
APPLICATION FOR SMALL-SCALE COAL MINING PERMIT
A
TL: 4792900
Coal and Nuclear Minerals Division (CNMD)/ Field Verification of 6 days Loc. 343 4F, PNOC Building 6
Information Services Division (ISD) technical personnel with Mining Engineer, Geologist,
and Geodetic Engineer
No
Notify Applicant of the reason for
Free area? disapproval
Yes
CNMD 1 day
Geological Evaluation
Reserve is No
less than 50,000
MT?
Yes
1 day
CNMD Mining Evaluation
No
Viable?
Yes
Energy Resource Review and Approval of permit 6 hours
Development Bureau (ERDB)
1 hour
CNMD Recording of permit
1 hour
Records Management Division (RMD) Release of permit
If complete requirements: Endorsement for area clearance For submission after approval of permit but prior to the conduct of any coal
to Information Technology Management Services (ITMS) development/production activities:
1. Environmental Compliance Certificate (ECC)
If not: Notify Applicant of the reason for disapproval 2. Business Permit
6. Area clearance evaluation by ITMS 3 days Information Services Division (ISD),
ITMS Note: For new applications, field verification for at least 6 days may be necessary
If free area: Issuance of Technical Description
If not: Notify Applicant of the reason for disapproval CHARGES AND FEES
7. Field Verification of technical personnel with Mining 6 days CNMD/ ISD
Engineer, Geologist, and Geodetic Engineer • Php 1,000.00 / hectare
8. Geodetic Evaluation 1 day ISD, ITMS
Please refer to A.O. No. 31, series of 2012
If free area: Technical Evaluation
If not: If not: Notify Applicant of the reason for disapproval
LEGAL BASIS
9. Technical Evaluation 1 day CNMD
If reserve is less than 50,000 MT: Mining Evaluation • BED Circular No. 87-03-001, dated March 4, 1987
• BED Circular No. 88-03-006, dated March 22, 1988
If not: Notify Applicant of the reason for disapproval • BED Circular No. 88-02-002, dated February 10, 1988
to the Applicant giving reason for disapproval
10. Mining Evaluation 1 day CNMD
If viable: Review and Approval of permit 6 hours OD-ERDB
If not: Notify Applicant of the reason for disapproval
11. Recording of permit 1 hour CNMD
12. Release of permit 1 hour RMD
14 Working Days
APPLICATION FOR SAFETY ENGINEER’S AND/OR INSPECTOR’S PERMIT
TL: 4792900
Records Management Division Transmittal of documents to OD-ERDB 1 hour Loc. 407 Basement, DOE Main
(RMD) Building
Office of the Director - Energy Resource ERDB Endorsement for technical evaluation 1 hour Loc. 343 4F, PNOC Building 6
Development Bureau (OD-ERDB)
Coal and Nuclear Minerals Issuance of order of payment 30 minutes Loc. 266 4F, PNOC Building 6
Division (CNMD)
No
Technically Qualified? Notify Applicant of the reason for
disapproval
Yes
No
Approved?
Yes
Securing Permit for New and Existing Safety Engineer and Inspector
2 Working Days
LIST OF REQUIREMENTS
1. Police clearance
2. Resume / biodata with 2x2 picture
3. Photocopy of PRC ID (for Safety Engineer only)
4. Endorsement letter from concerned Coal Operating Contract holder
LEGAL BASIS
TL: 4792900
Records Management Division (RMD) Transmittal of documents to OD-ERDB 1 hour Loc. 407 Basement, DOE Main
Building
Office of the Director - Energy Resource ERDB Endorsement for technical evaluation
Loc. 343 4F, PNOC Building 6
1 hour
Development Bureau (OD-ERDB)
Coal and Nuclear Minerals Issuance of order of payment 30 minutes Loc. 266 4F Floor, PNOC Building 6
Division (CNMD)
Treasury Division Payment of processing fee 30 minutes Loc. 233 GF, DOE Annex Building
No
Legally Qualified?
Yes
Note: For new application, field verification of explosive magazine for at least 5
(2 Days)
days may be necessary
APPLICATION TO POSSESS AND MOVE EXPLOSIVES
LEGAL BASES
• P.D. 972
• BED Circular No. 1, Series of 1978
• A.O. No. 31, series of 2012
APPLICATION FOR BLASTER FOREMAN’S LICENSE
Office of the Director - Energy Resource ERDB Endorsement for technical evaluation Loc. 343 4F, PNOC Building 6
Development Bureau (OD-ERDB) 1 hour
Coal and Nuclear Minerals Issuance of order of payment 30 minutes Loc. 266 4F, PNOC Building 6
Division (CNMD)
Treasury Division Payment of processing fee 30 minutes Loc. 233 GF, DOE Annex Building
No
Legally Qualified?
Yes
CNMD/RMD 1 hour
Recording and releasing of approved application
3 Working Days
LIST OF REQUIREMENTS
1. Foreman’s license application
2. Endorsement from Philippine National Police
3. Consolidated report of acquisition and disposal of explosives
4. Inventory of explosive / explosive ingredients (last 12 months)
5. Security survey of explosive magazines
6. Daily transaction of explosives / explosives ingredients
LEGAL BASIS
• BED Circular No. 1, Series of 1978
• A.O. No. 31, series of 2012
• P.D. 972
APPLICATION FOR EXPLOSIVE PURCHASER’S LICENSE
TL: 4792900
Records Management Division (RMD) Transmittal of documents to OD-ERDB 1 hour Loc. 407 Basement, DOE Main
Building
Office of the Director - Energy Resource ERDB Endorsement for technical evaluation 1 hour
Development Bureau (OD-ERDB) Loc. 343 4F, PNOC Building 6
Treasury Division Payment of processing fee 30 minutes Loc. 233 GF, DOE Annex Building
Yes
No
Legally qualified?
Yes
3 Working Days
LIST OF REQUIREMENTS
1. Purchaser’s license application
2. Endorsement from Chief, Philippine National Police
3. Consolidated report of acquisition and disposal of explosives
4. Inventory of explosive / explosive ingredients (last 12 months)
5. Security survey of explosive magazines
Note: For new application, field verification of explosive magazine for at least 5 days may be necessary
LEGAL BASIS
• BED Circular No. 1, Series of 1978
• A.O. No. 31, series of 2012
• P.D. 972
APPLICATION FOR CERTIFICATE OF COMPLIANCE (COC) FOR COAL IMPORTATION
TL: 4792900
30 minutes Loc. 407 Basement, DOE Main
Records Management Division (RMD) Transmittal of documents to OD-ERDB Building
Office of the Director - Energy Resource 1 hour Loc. 343 4F, PNOC Building 6
Development Bureau (OD-ERDB) ERDB Endorsement for technical evaluation
No
CNMD Technically qualified? 1 day
Yes
Endorsement for approval of COC for Importation
2 Working Days
LIST OF REQUIREMENTS
1.Letter of application with the following data:
a. Name, address and nature of business of the importer
b. Name, description and volume of product to be imported
c. Unit and total import price (FOB, Freight, CIF)
d. Name and address of the supplier
e. Date of loading and load port / country
f. Expected date and place of arrival in the Philippines
g. Name of carrier / vessel
h. Transaction date
i. Reason for importing
2.Guaranteed specifications
3.Proforma invoice
4.Post shipment documents to be submitted 10 days after arrival of shipment:
a. Import entry
b. Commercial Invoice
c. Release certificate
d. Certificate of quality particularly of the product received
e. Other documents relative to the importation
CHARGES AND FEES
• Permit fee: Php 650.00
• Application fee: Php 650.00
LEGAL BASES
• R.A. 7638
• Sec. 60(a)(1), DENR AO 14, Series 1993
• Sec. 104, P.D. 1464 (Tariff and Custom Code)
• DC 2012-05-006
• A.O. No. 31, series of 2012
APPLICATION FOR COAL EXPORT CLEARANCE (CEC)
Submission of application
TL: 4792900
Records Management Division (RMD) Transmittal of application to ERDB 1 hour Loc. 407 Basement, DOE Main
Building
Coal and Nuclear Minerals Division Issuance of order of payment 30 minutes Loc. 266 4F, PNOC Building 6
(CNMD)
30 minutes Loc. 233 GF, DOE Annex Building
Treasury Division Payment of application/processing fee
Notify Applicant of the
Technical Evaluation reason for disapproval 1 day
No
CNMD Technically qualified?
Yes
Compliance Division Financial Evaluation 1 day Loc. 236 2F, DOE Annex Building
No
Financially qualified?
Yes
CNMD Endorsement for approval of CEC for exportation 30 minutes
No
Approved?
Yes
RMD Release of CEC 30 minutes
3 Working Days
TL: 4792900
Records Management Division (RMD) Transmittal of application to ERDB 30 minutes Loc. 407 Basement, DOE Main
Building
Energy Resource Development Bureau (ERDB)/ DOE 1 hour Loc. 343 4F, PNOC Building 6
ERDB Endorsement for technical evaluation
Field Office
Coal and Nuclear Minerals Division (CNMD)/ 30 minutes Loc. 266 4F, PNOC Building 6
DOE Field Office Issuance of Order of Payment
Treasury Division Payment of application fee 30 minutes Loc. 233 GF, DOE Annex Building
No
Technically qualified?
Yes
Contracts Division Legal Evaluation 1 day Loc. 234 ERL Building 3
No
Legally qualified?
Yes
ERDB Review and approval of COA / COR 4 hours
If not: Notify Applicant of the reason for disapproval • Application fee: Php 3,500.00
TL: 4792900
Records Management Division (RMD) Transmittal of application to ERDB 30 minutes Loc. 407 Basement, DOE Main
Building
Energy Resource Development Bureau 1 hour Loc. 343 4F, PNOC Building 6
(ERDB)/DOE Field Office ERDB Endorsement for technical evaluation
No
Technically qualified?
Yes
Compliance Division Financial Evaluation 1 day Loc. 236 2F, DOE Annex Building
No
Financially qualified?
Yes
ERDB/RMD Review and approval of COA / COR and Coal 4.5 hours
Transport Permit (CTP)
Release of COA/COR
Applying for the renewal of Coal Trader’s Accreditation and Coal End-User’s Registration
If technically qualified: Financial Evaluation Note: Field verification of coal storage facility for at least 3 days may be necessary
3 Working Days
REQUEST FOR VISA ENDORSEMENT
Submission of application
1 hour
TL: 4792900
Loc. 407 Basement, DOE Main
Records Management Division (RMD) Transmittal of documents to ERDB Building
No
Legally qualified?
2 days
Yes
LIST OF REQUIREMENTS
LEGAL BASIS
• P.D. 972
RENEWABLE ENERGY MANAGEMENT BUREAU (REMB)
DURATION
(WORKING DAYS)
PROCESS
FROM TO
RE Applicant
TL: 4792900
Issue acknowledgement letter and order of payment for application fee to the Loc. 338 4F, Multi Purpose Building
RE-REC Secretariat
applicant. (1 working day)
Simultaneous
Conduct area evaluation and validation and Loc. 254 GF, Data Bank Building
ITMS
provide evaluation report after 3 working days
Sec. 2. RE Contract
Area Clearance
YES
AC
For SESC Rooftop Application within existing SESC, the exact coordinates of the For RESC Application overlapping with existing RESC of other RE technologies, the
former may be carved out if the following exists: former may pursue by submitting a written acknowledgment of such fact and the prior
•Existing SESC is under construction or in commercial operation and does not rights of existing RE contract holder or a requirement to secure a clearance. (3 working 45 DAYS
cover the proposed rooftop area. days)
•Existing SESC is compliant with Milestone obligation and does not include the For RESC Application within protected area, RE-REC Secretariat shall notify the
proposed rooftop area in its FS and WP. applicant
REGISTRATION PROCESS OF RENEWABLE ENERGY DEVELOPER (Stage 2)
AB
Records Management Division Upon receipt of the copy of application fee, RE-
(RMD) REC Secretariat shall determine its
RE-REC Secretariat completeness and notify applicant
YES
Sec. 3. Completeness
of RE Application
RE-REC Secretariat shall notify applicant and issue Loc. 254 GF, Data Bank Building
ITMS Has the RE applicant
order of payment for processing fee YES submitted lacking
documents within 5
days?
NO
YES
AC
For SESC Rooftop Application within existing SESC, the exact coordinates of the For RESC Application overlapping with existing RESC of other RE technologies, the
former may be carved out if the following exists: former may pursue by submitting a written acknowledgment of such fact and the prior
•Existing SESC is under construction or in commercial operation and does not rights of existing RE contract holder or a requirement to secure a clearance. (3 working 45 DAYS
cover the proposed rooftop area. days)
•Existing SESC is compliant with Milestone obligation and does not include the For RESC Application within protected area, RE-REC Secretariat shall notify the
proposed rooftop area in its FS and WP. applicant
REGISTRATION PROCESS OF RENEWABLE ENERGY DEVELOPER (Stage 3)
AC
TL: 4792900
RE-REC Secretariat/Legal Service Endorse the application to the Legal Services Loc. 338 4F, Multi Purpose Building
(LS) (for legal evaluation in 3 working days)
Director, Legal Service/REMB LS shall endorse the legally qualified application to the REMB Loc. 403 ERL Building 3
(for technical evaluation in 5 working days)
Director, REMB/FS Endorse the financially qualified application to the Financial Loc. 373 2F, DOE Annex Building
Services (for financial evaluation in 5 working days)
YES
Endorse the application to RE-REC for deliberation Has the RE applicant
RE-REC Secretariat and appropriate action (3 working days) YES complied the requirements in
5 working days?
YES
RE-REC members shall initial on the contract (5
working days)
For SESC Rooftop Application within existing SESC, the exact coordinates of the
former may be carved out if the following exists:
For RESC Application overlapping with existing RESC of other RE technologies, the
former may pursue by submitting a written acknowledgment of such fact and the prior
45 DAYS
•Existing SESC is under construction or in commercial operation and does not rights of existing RE contract holder or a requirement to secure a clearance. (3 working
cover the proposed rooftop area. days) (180 Days)
•Existing SESC is compliant with Milestone obligation and does not include the For RESC Application within protected area, RE-REC Secretariat shall notify the
proposed rooftop area in its FS and WP. applicant
HARMONIZED RENEWABLE ENERGY (RE) CONTRACT APPLICATION CHECKLIST OF REQUIREMENTS
(Renewable Energy Operating Contract under R.A. No. 9513)
A. Preliminary Requirements
1. Geothermal, Hydro, Wind, Solar and Ocean/Current Energy Only
Letter of Intent/ Application;
Duly accomplished RE Contract Application Form;
Proposed RE Project Site/Area Location Description/Map complies with Annex A
2. Biomass Energy Only
Letter of Intent/ Application;
Duly accomplished RE Contract Application Form;
Proposed RE Project Site/Area Location Description/Map complies with Annex A
Feasibility Study / Plant Description;
Biomass Feedstock Supply Agreement;
Environmental Clearance Certificate (ECC if > 5MW, CNC if<5MW);
Wood Processing plan permit under MAO 50; (if feedstock is woodchip);
Supply contract for existing plantation (if feedstock is woodchip);
Payment of application/processing fee upon completion of all requirements.
B. Legal Requirements
1. Individual or Proprietorship
Birth Certificate- duly authenticated by National Statistics Office (NSO);
Business Permit- certified true copy; and
Department of Trade and Industry (DTI) Registration (if applicable)
C. Technical Requirements
Track Record or Experience;
Work Program with financial commitment per activities;
Curriculum Vitae of Management and Technical Personnel;
List of Technical Consultants with corresponding contract between the developer and the consultants
showing their respective qualifications; and
List of existing company-owned and leased equipment appropriate for the RE project with the
corresponding description
D. Financial Requirements
Annual Report or Audited Financial Statements (FS) for the last two (2) years from the filing date and latest
Unaudited FS duly signed by the responsible official such as the President and/or Chief Finance Officer if
the Audited FS is more than six (6) months old at the time of filing;
Original Bank certification to substantiate the cash balance as of the latest Unaudited FS;
Projected Cash Flow Statement for two (2) years covering fund sources and uses for the particular offered
area, other applied OCSP areas, renewable energy service contract applications, existing service/operating
contracts with DOR and other existing business, if applicable, with supports by any or all of the following:
• Sales Agreement/Purchase Order of buyer for projected revenues on existing
Operations (Photocopy)
• Sworn Letter of Commitment from stockholders for additional equity/cash
infusion within one (1) year of operation (Original)
• Bank-approved loan/credit line earmarked for the proposed operation (Original); and
In addition, for newly organized corporation or subsidiary corporation with insufficient funds to finance
the proposed work program with guarantee from parent company:
• Parent Company's financial documents per items 1 and 2 above
• Duly notarized Letter of Undertaking/Support from the Parent Company to fund
the work program
In case of foreign parent company, the documents shall be duly authenticated by the
Philippine Consulate having the appropriate jurisdiction over the said parent company.
APPLICATIONS FOR ACCREDITATION OF A BIOFUEL MANUFACTURER
TL: 4792900
Checking of submitted documents based on AFETD Loc. 322 Basement, Multi Purpose
Supervising SRS/Senior SRS, Biomass Division checklist Building
0.5
No
Complete?
Yes
DURATION
(WORKING DAYS)
PROCESS
FROM TO
SRS II, Alternative Fuels and Energy Technology Division Checklisting / official acceptance / recording
Loc. 209
Recording / transmittal of
approved CAI / copy furnished to Information & Data Management
Chief, Alternative Fuels and Division, Information Technology &
Management Services 0.5 209 3F, DOE Main Building
Energy Technology Division
Chief, Alternative Fuels and Energy Loc. 209 3F, DOE Main Building
Technology Division Checklisting / official acceptance / recording
Chief, Treasury Division Payment of processing fee 10 Loc. 233 GF, DOE Annex Building
Php 5,000.00
Sr. SRS/Supv. SRS, Alternative Fuels and Energy Technology Technical validation / inspection / evaluation of
application /
Division preparation of report
Recording / transmittal of
Sr. SRS/Supv. SRS, Alternative Fuels and Energy Technology approved CA / copy furnished to Information & Data
Division Management Division, Information Technology & 0.5
Management Services
Submission of request
for energy audit
TL: 4792900
Loc. 333 3F, DOE Main Building
Office of the Director, EUMB Receive / Endorse application
1
Loc. 214 3F, DOE Main Building
Director, EUMB / Chief, Energy Efficiency & Preparation / transmittal of reply and
Conservation Division (EECD) schedule of energy audit
Senior Science Research Specialist (SRS) / SRS II, Conduct of energy audit
EECD 1
Chief, EECD
Review of audit report for approval
1
Loc. 233 GF, DOE Annex Building
Chief, Treasury Division Payment of processing fee
TL: 4792900
Office of the Director, EUMB Receive / Endorse application Loc. 333 3F, DOE Main Building
Director, EUMB / Chief, Energy Efficiency & Preparation / transmittal of reply and schedule of
energy audit
Conservation Division (EECD)
Senior Science Research Specialist (SRS) / SRS II, Conduct of energy audit 5
EECD
Incomplete
Complete
Final Assessment
EECD Re-evaluation of application 2
Drafting of Report
Treasury Payment of Processing fee Loc. 233 GF, DOE Annex Building
ESCO Committee (EUMB, LS, IAS) Final Review / Deliberation / Recommendation for Approval
3
OSEC Approval 2
1
EECD Issuance Certification of Accreditation
TL: 4792900
Director, Energy Utilization Management Bureau Submission of complete set 0.5 Loc. 333 3F, DOE Main Building
(EUMB) from SEC
Recording / transmittal
Clerk IV, EUMB of 2nd Endorsement to SEC 0.5
REAMD coordinate with GENCOs for the transmittal of E- Loc. 417 4F, DOE Main Building
Sr. SRS-REAMD Copy Template MOA 2
Submission of signed
Sr. SRS-REAMD / GENCOs and notarized MOA/Review 22
of Legal
SRS II, REAMD / Legal Services Transmittal to EPIMB-PPDD of signed COE & MOA 0.5
Notarization of MOA 1
TL: 4792900
Loc. 416/417 4F, DOE Main Building
Office of the Director, EPIMB / Receive / Verify application / Checking of
Documents 1
NEPMAS, REAMD
Chief, REAMD / Office of the Director, EPIMB / USEC Review / endorsement of project proposal 3
OSEC / USEC / IAS / Financial Services / EPIMB / 3 Loc. 221 (Acctg.) 2F, DOE Annex Building
Signing and Notarization of MOA*** Loc. 373 (FS – OD) 2F, DOE Annex Building
Legal
Loc. 233 (TD) GF, DOE Annex Building
Management
Water Supply
Reforestation
Livelihood
Agroforestry
Equipment)
Solid Waste
Equipment
Communal
Structural
Measures
Nursery/
DOCUMENTS
Training
Medical
Facility/
Center/
Erosion
System
Projects
Health
Toilets
Needs
(IEC
/
✓ ✓ ✓
Resolution from the concerned Sanggunian endorsing
1
the project identified during the LGU consultation
✓
List of cooperative/association members/borrowers with
5 Total areas to be planted & type and
corresponding amount to be borrowed and purpose* 3.1
number of flora species to be planted
✓
✓ ✓ ✓
Cooperative/association's latest financial statement List of existing medical and/or health personnel in the
6
(6 mos – 1 yr prior to project application)** 3.2 area and existing proposed health and/or medical ✓
related activities
7 Three - Five year projected income statement ✓ 3.3
Certification from local water utility
✓
✓
of the adequacy of water supply
8 Training design
Certification from DOH/local water
3.4
utility for the potability of water
✓
Notarized copy of Deed of Donation/Proof of Transfer of
✓ ✓
Private Property/Transfer Certificate of Title or 3.5 List of existing number of dump/garbage trucks
9
equivalent legal documents justifying public ownership
of lot/site
Certification from the LGU of the
3.6
existing dump site
✓
✓
Sanggunian resolution stipulating date of transfer of
10
property, existing use of transferred property
3.7 Average daily volume of garbage ✓
✓
Certification of road classification from the concerned
11
host LGU's engineer's office 3.8 Target beneficiaries ✓ ✓ ✓ ✓ ✓ ✓ ✓
✓ ✓ ✓
Certified True Copy of SEC/CDA/DOLE
12
Certificate of Registration** 3.9 Project location sketch map ✓ ✓ ✓ ✓ ✓ ✓
13 Relevant permits from concerned agencies** ✓ ✓ ✓
* as applicable
* as applicable
** for projects with cooperative/association as project implementor
** for projects with cooperative/association as project implementor
*** training as a component of a project or solely training
*** training as a component of a project or solely training
“ANNEX C” “ANNEX D”
ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY Check list of Bidding Documents for submission to DOE
REQUIREMENTS
1) Invitation to Apply To Bid/PHILGEPS
A. REFORESTATION WATERSHED MANAGEMENT HEALTH AND 2) PHILGEPS/Copy of News Clipping with project cost
ENVIRONMENTAL ENHANCEMENT FUND: of 500 Thousand and above
3) Evaluation Result/Evaluation Report of Bidders/Suppliers
TYPE OF PROJECT ___ 3.a Pre-Qualification
___ 3.b Post Qualification
Managemen
Agroforestry
Reforestatio
Equipment)
Solid Waste
4) Instruction to Bidders/Suppliers
Equipment
Communal
Structural
Measures
Nursery/
Training
Medical
Facility/
DOCUMENTS
Center/
Erosion
System
Supply
Health
Toilets
Needs
Water
5) Bidder's Bond with specified date
(IEC
n/
t
6) Performance Bond and Bank Guarantee with specified date
7) Minutes of BAC meeting/ Minutes of Bidding
containing the Name and signatures of the BAC attendees
Disbursement schedule, detailed cost estimate/bill
of materials/detailed specifications/program of 8) BAC Resolutions duly signed by BAC and the
3.10
work/plans/ drawing duly signed by the
✓ ✓ ✓ ✓ ✓ ✓ ✓ concerned LGU Official.
Municipal/Provincial Engineer and Mayor/Governor 9.a Recommending Mode of Procurement
Cooperative/association's latest 9.b Resolution of Award
✓ ✓ ✓ ✓ ✓ ✓
9.c Declaring LCRB and Recommending Approval
3.11 financial audit (6 mos. to 1 year prior to project
duly approved by the concerned LGU official.
application)**
10) Bid Form/Bid Price/Bidded Cost /Detailed Estimated Cost
Three - Five - year projected income 10.a Detailed Estimate
3.12
statement
10.b Bid Price in the Bill of Quantities
SEC/CDA/DOLE Certificate of
3.13
Registration**
✓ ✓ ✓ 10.c Bid Evaluation Report
10.d Bid Schedule
10.e Cash Flow/Payment Schedule
3.14 Training design ✓
11) Abstract of Bids signed by BAC
Notarized copy of Deed of Donation/Proof of 12) Contract Agreement by LGU and winning Bidder
Transfer of Private Property/Transfer Certificate of
3.15
Title or equivalent legal documents justifying
✓ ✓ ✓ ✓ ✓ ✓ ✓ 13) Notice of Award signed by LGU and winning bidder
14) Notice to Proceed duly acknowledge by Contractor indicating actual date of receipt
public ownership of lot/site
Municipal Helath Officer/DOH endorsement to 15) Land Bank Certificate
manage the project and Certification that there is no
3.16
existing health center in the area/feasibility&
✓ 16) DOE Notice to Proceed
17) MOA among DOE, LGU and Power Plant
standard of equipment/facilities
18) Sangguniang Resolution proposing and
Endorsement/Certification from the concerned
endorsing the Project
3.17 DENR Office/Watershed Administrator as to the ✓ 19) Sangguniang Resolution authorizing the concerned Gov't Officials
feasibility of the project
Relevant permits from concerned
3.18
agencies
✓ ✓ ✓ ✓ ✓ ✓ ✓ re: to enter and sign all contracts/aggreements concerning ER 1-94 projects
Note:
For photocopied documents- all copies submitted should bear the full name and signature of the
* as applicable person certifying that the same are true, complete, exact, and unaltered copies from the orginal
** for projects with cooperative/association as project document.
implementor
*** training as a component of a project or solely training
“Annex E”
ER 1-94 NON-ELECTRIFICATION PROJECTS
SAMPLE FORMAT OF PROJECT PROPOSAL
GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ELECTRIFICATION FUND OF ER 1-94, AS AMENDED
Distribution Utility (DU)/ Signing and Notarization of by DUs and GenCos (20Days)
Generation Company (GenCo)
Distribution Utility (DU) DU to conduct the Public Bidding and Submit to DOE the
pertinent Bidding Documents (28-144Days as per RA 9184)
TL: 4792900
1 Loc. 417 4F, DOE Main Building
Science Research Specialist, REAMD Checking of submitted documents
No
Complete?
Yes
Legal Services, Internal Audit Services, Legal, Financial, and Technical Evaluation of the Project Loc. 403 (LS) ERL Building 3
Loc. 271 (IAS) 3F, DOE Annex Building
REAMD - EPIMB
40
No
Acceptable?
Yes
Office of the Director, EPIMB Review of Evaluation Report 5
NPC 30
Office of the Director, EPIMB Review and Endorsement of Project for Assistant Secretary/
Undersecretary’s approval 5
Secretary 1
Signing of Endorsement
General
Relevant registration from Securities and Exchange Commission, Department of Trade and Industry, NEA or
Cooperative Development Authority
Technical Requirements
Full details of the technical skills and experience of the key management team responsible for the operation of
the system. These details should include relevant technical and business management qualifications as well as
full descriptions of experience relevant to the technical and commercial operation of electric power generation
and supply systems.
Details of the proposed arrangements for the acquisition, training and contracting of the necessary expertise
that the applicant does not possess at the time of application.
Details of how the applicant proposes to design, construct, operate, and maintain the generation and associated
distribution system to be used in its operations, including its proposed plans for dealing with major operating
contingencies such as a failure of its generating plant or a major fault on its distribution system.
Details of the procedures that the applicant proposes to put in place for the billing to and collection of payment
from customers and maintain accounting records of its commercial operations. An undertaking that the applicant
will allow DOE and/or ERC to open its accounting records relating to its operations, when necessary.
A statement certifying that the applicant intends to design, construct, operate and maintain its generation and
distribution systems in full compliance with the relevant requirements prescribed under the applicable laws
including EPIRA and its attendant rules and regulations.
Financial Requirements
A letter of credit or letter of intent to invest from a bank or another organization provided that the DOE is
satisfied that the other party has adequate financial capacity and indeed has the intent to invest or provide
credit.
The most recent annual report or financial accounts of the applicant duly certified as correct by a registered
auditor or accountant.
Proof of adequate insurance coverage and compliance with all Philippine labor laws.
Good Standing
TL: 4792900
Office of the Director/ Chief/ Supvg. SRS, REAMD 1 Loc. 414 / 417 4F, DOE Main Building
Receiving/Verification/ Checking of Documents
Chief, REAMD/ Director/ Asst . Secretary/ Endorsement of Project Proposal for funding approval 5
Undersecretary
Secretary 10
Funding Approval of Project Proposal
REAMD/EPIMB/FS/Asst Secretary/ 15
Undersecrdetary/ Secretary/ Treasury Division Processing of DV*** and releasing of the remaining 85% of
the project fund (based on the result of competitive public
bidding****) upon receipt of COMPLETE documents
“Preparation of OS and DV upon receipt of Amended to “Processing of Disbursement Providing the details of the process
COMPLETE documents” Voucher (DV) and releasing of the Initial Fund considering up to 10-15 days as harmonized to
equivalent to 15% of Approved project cost) the process under ER1-94
upon signing of MOA”
“Release of Funds for Project Amended to “Processing of DV and releasing Providing the details of the process
Implementation (Based on the result of of the remaining 85% of the project fund considering up to 10-15 days as harmonized to
competitive public bidding)” (based on the result of competitive public the process under ER1-94
bidding) upon receipt of COMPLETE
documents”
PROCESSING OF 1ST ENDORSEMENT TO THE SECURITIES AND EXCHANGE COMMISSION (SEC)
Submission of application
with complete supporting documents
REMB endorsement 2
TL: 4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD Evaluation of application 0.5
0.5
TL: 4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD
Evaluation of application 0.5
0.5
Director, EPIMB Signing of Certification to PNP 1 Loc. 414 4F, DOE Main Building
Submission of written
application with complete
requirements
No 3
Complete?
Yes
TL: 4792900
Investment Specialist. IPS Checks the completeness of the documents submitted
LOC. 389/371 GF, DOE Main Building
(1/2 day)
NO
Complete? Informs the applicant of the lacking
documents
YES
Investment Specialist. IPS Coordinates project presentation of the applicant with concerned units
(1/2 day)
Investment Specialist. IPS Prepares and sends Memorandum to concerned DOE units for project
evaluation (1/2 day)
NO
Notify Applicant of the reason of disapproval
Approved?
YES
NO
Signed? Revises the Certificate of Endorsement for the
Secretary’s approval and signature
(5 days)
YES
DOE
Refer to “Annex G” No Fees
19 DAYS
(24 Days)
“Annex G”
1. Request Letter
2. Company Profile / Background
• Briefly describe the company, history and the sector in which it operates
• List of Key Officials (Director level up)
• List and overview of the major power projects accomplished by the company in the Philippines and overseas, if applicable. (Project, Key
Project Features, Location, Customers, Contact Person, Project Partners)
3. SEC / DTI Registration (including the most recent/current year GIS certified by the SEC)
4. Articles of Incorporation / Partnership certified by the SEC
5. Project Profile
• Project Fact Sheet (see format below)
• Executive summary of Feasibility Study
• Technical Description
• Total Investment Cost (Include the breakdown)
Civil Works (list of all engineering, design, civil, architectural, site development, electro
mechanical activities and instrumentation and the corresponding costs of each identifying
the purpose of each activity)
Machinery and Equipment (list of all machineries and equipment and accessories including
generators, transformers, metering, interconnection, fuel tanks transmission lines, switch
gears, SCADA and other machineries and equipment to be used in the project covering costs
for acquisition and installation) include the brand, make and country of origin
Other related initial costs (list of all other related costs such as interest, commissioning and
testing, working capital, contingency, etc.)
Total Project Cost
Note: For costs in foreign currency, indicate the conversion rate to Php
• 5-year Projected Financial Statements with and without ITH (in Php)
• Power Supply Agreement or Energy Sales/Supply Agreement including all the amendments in the contract and assignment if
applicable
• Copy of CSP Certification endorsed by DOE for projects in SPUG areas
• For Coal Plants: indicate sources of coal and percentage of its sources.
• For Diesel Plants: certificate from fuel supplier indicating compliance with the 2% biodiesel blend and the Fuel Supply
Agreement (Certificate should bear original and not electronic signature)
• For projects not yet included in the Power Development Plan (PDP), submit a Letter of Intent (LOI) addressed to the Director of
EPIMB for your project to be included in the PDP
APPLICATION FOR CERTIFICATE OF ENDORSEMENT TO DEPARTMENT OF AGRARIAN REFORM (DAR)
Submits
complete requirements
TL: 4792900
(1/2 day) LOC. 389/371 GF, DOE Main Building
Investment Specialist, IPS Checks completeness of
requirements submitted
YES
Prepares Drafts memorandum for the Secretary (1/2 day)
Investment Specialist, IPS
and Certificate of Endorsement for the Secretary’s
approval and signature
NO (3 days)
Revises the Certificate of Endorsement for
Signed? the Secretary’s approval and signature
YES
(1/2 day)
Issues Certificate of
Investment Specialist, IPS Endorsement
DURATION
PROCESS2222222 (WORKING DAYS)
FROM TO
Submission of Request
Assessment of Fees
0.5
Payment of Fees
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
0.5
Recording / transmittal of output
Clerk / Staff
Submission of Application
TL: 4792900
Office of the Director Receive / Endorse application Loc. 421 / 422 3F, PNOC Building 5
Submission of Application
0.5
Payment of Fees
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
Submission of Application
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
1.5
Evaluation / processing of application and preparation of
Science Research Specialist Memorandum of Approval (MOA) and Endorsement
Certificate (EC)
Supervising SRS / Chief SRS Review MOA and EC and recommend approval for the
issuance of MOA and EC 1.0
Submission of application
0.5
Payment of Fees
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
2.0
Evaluation / processing of application and preparation of Memorandum of
Science Research Specialist Approval (MOA) and Endorsement Certificate (EC)
3.0
Review MOA and EC and recommend approval for the issuance of MOA and EC
Supervising SRS / Chief SRS/Bureau Director
Submission of application
0.5
Payment of Fees
TL: 4792900
Office of the Director Receive / Endorse application Loc. 421 / 422 3F, PNOC Building 5
3.0
Review MOA and EC and recommend approval for the issuance of MOA and EC
Supervising SRS / Chief SRS/Bureau Director
Submission of Application
0.5
Payment of Fees
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
1.5
1.0
Review / endorsement of ACCREDITATION for
Supervising SRS / Chief SRS approval
Submission of Application
Payment of Fees
0.5
TL: 4792900
Office of the Director Loc. 421 / 422 3F, PNOC Building 5
Receive / Endorse application
1.5
Science Research Specialist Evaluation/processing of notice to purchase
Approval of
Bureau Director/ Clerk Acknowledgement Letter / Release 1.0
Submission of Application
Payment of Fees
TL: 4792900
Office of the Director Receive / Endorse application 0.5 Loc. 421 / 422 3F, PNOC Building 5
1.0
Recommend approval of MOA, CFAR and LOR by
Undersecretary Secretary
3.0
Secretary Approval of MOA, CFAR and LOR/ Release to OIMB
0.5
Clerk Recording / transmittal of MOA and EC
Submission of Application
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
7.0
Evaluation / processing of application and
Science Research Specialist preparation of Memorandum of Approval (MOA)
and Letter of Provisional Registration
Submission of Application
0.5
Payment of Fees
TL: 4792900
Office of the Director Receive / Endorse application Loc. 421 / 422 3F, PNOC Building 5
2.0
Evaluation / processing of application / preparation of
Science Research Specialist
Evaluation Sheet and SCC
1.0
Supervising SRS / Chief SRS/ Bureau Director Review of Evaluation Sheet and SCC for approval
Submission of Application
TL: 4792900
Office of the Director Loc. 421 / 422 3F, PNOC Building 5
Receive / Endorse application
Supervising SRS / Chief SRS/ Bureau Director Review of application/ Evaluation Sheet and 1.0
SCC for approval
Submission of Application
Payment of Fees
0.5
TL: 4792900
Office of the Director Receive / Endorse application Loc. 421 / 422 3F, PNOC Building 5
Chief SRS/Bureau Director Review of application/ Evaluation Sheet and COC 1.0
for approval
Submission of Application/
Requirements
TL: 4792900
Loc. 421 / 422 3F, PNOC Building 5
Office of the Director Receive / Endorse application
DOE-OIMB/ 4.5
DBP Regional Office Issue Notice of Approval / Release of funds
DURATION
(WORKING DAYS)
PROCESS
FROM TO
Submission/Receipt of request
0.5
TL: 4792900
Director, EPPB
Review / Screening / Endorsement Loc. 223 2F, DOE Main Building
Chief SRS, Concerned Division
0.5
Clerk Recording / transmittal of output
Submission of
Director, Energy Policy and request for Energy
Planning Bureau Statistics/Information
Received
0.25
Review / Screening /
Endorsement
TL: 4792900 2F, DOE Main Building
Chief SRS Loc. 223
Data
Yes requested available No
Supervising SRS/Technical Staff in the PFRD database
and/or from Energy
Balance Table If yes: 1 day processing
(EBT) Draft Memo
to concerned
DOE units for If no: 2 days processing
data request
Director, EPPB
Approval of output
Clerk
0.25
Recording/Transmittal
Note: * 1 day processing of data request of Output
** 2 days processing of data request
DURATION
(WORKING DAYS)
PROCESS
FROM TO
TECHNICAL EVALUATION OF SMALL-SCALE COAL MINING 8 3
(SSCM) APPLICATION AREA
Submission of request/
survey returns
Chief / Assistant Chief, Information Services Evaluation of request / checking of survey returns Loc. 254/391 GF, Data Bank Building
Division (ISD) computations
TL: 4792900
Office of the Director, Loc. 260 GF, Data Bank Building
Information Technology and Management Receive/Endorse application 0.5
Services (ITMS)
Loc. 254/391 GF, Data Bank Building
Chief / Assistant Chief, Information Services Evaluation of request / checking of survey returns
Division (ISD) computations
2.5
Director, ITMS
Approval of TD / transmittal letter
TL: 4792900
Office of the Director, Loc. 260 GF, Data Bank Building
Information Technology and Management Receive/Endorse application 0.5
Services (ITMS)
Chief / Assistant Chief, Information Services Loc. 254/391 GF, Data Bank Building
Evaluation of request
Division (ISD)
TL: 4792900
Loc. 260 GF, Data Bank Building
Office of the Director, 0.5
Information Technology and Management Receive/Endorse application
Services (ITMS)
Processing of request
Infographics Section
Submission of request
TL: 4792900
Loc. 257 Energy Data Center of the
Receive Request Philippines Building
SRA, IDMD
Endorsement of Request
Supervising SRS, IDMD
Loc. 408 GF, Data Bank Building
Approval of request
Chief, IDMD / PRDD*/GEMD**
0.5
DOE
1)Letter of request
2)Filled-out data request form
No Fees E.O. 197
Administrative Order No. 0.5 DAYS
3)List of data/documents requested 31 dated October 1,
4)Receipt of payment 2012 (3 Days)
5)Signed conforme/confidentiality/terms and conditions
PROVISION OF ENERGY DATA & INFORMATION THRU ENERGY DATA CENTER
(SERVICE CONTRACTORS/INVESTORS)
Submission of request
TL: 4792900
Loc. 257 Energy Data Center of the
SRA, IDMD Receive Request Philippines
Submission of request
TL: 4792900
Loc. 257 GF, Data Bank Building
SDO I, IDMD Receive Request
Chief, IDMD Approval of Request Loc. 408 GF, Data Bank Building
0.5
Bureau/Service Directors,
Assistant Secretary, Undersecretary Submission of request
TL: 4792900
Loc. 260 GF, Data Bank Building
OD, ITMS Receive Request
Information Technology Officer I / Information Upload approved information on the DOE website
Systems Analyst II
TL: 4792900
Chief, CWPS / PAO Loc. 255 GF, DOE Annex Building
Submission of request
Director, ITMS Endorsement request to ITD Loc. 260 GF, Data Bank Building
Receive, review and endorse request to technical staff Loc. 385 3F, NPTL Building
Chief, ITD
DOE
1)Proof of approval from Chief, CWPO
2)Copy of approved data, preferably in digital or PDF format and approved copy
No Fees E.O. 197 Administrative
Order No. 31 dated 1 DAY
of graphics/pictures/flash videos, if available October 1, 2012
(1.5 Days)
INFORMATION TECHNOLOGY AND MANAGEMENT SERVICES
INFORMATION SERVICES DIVISION
Reprographics Services
Engineering Copier
White Bond 140.00/sq.m.
.004 Double Matte Film
Maps/Graphics/Scanned Images/Printing/Plotting
(Included map preparation)
Page Size
Letter size (8.5” x 11”) 125.00/sheet
Legal Size (8.5” x 14”) 125.00/sheet
Large Format
30” x 40”
Glossy 2,800.00/sheet
Bright White 1,800.00/sheet
24” x 32”
Glossy 1,800.00/sheet
Bright White 1,150.00/sheet
Glossy 3,500.00/sq.m
Bright White 2,300.00/sq.
HP Special Paper (A0 size) 1,400.00/sheet
HP Special Paper (A1 size) 720.00/sheet
HP Special Paper (A3 size) 220.00/sheet
HP Special Paper (A4 size) 110.00/sheet
Reproduction film (A0 size) 1,600.00/sheet
Cultural Data (Petroseis or Autocad format) 5,000.00/3.5” disk
Scanning 60.00/data item
Geomatics Section
Field Verification 3,400.00/man/day
Verification of Survey returns
Tracing Cloth/Mylar Film Plan 600.00/plan
Fieldnotes, Computations, etc. 15.00/sheet
Horizontal Control Survey/Vertical Control Survey 25,000.00/km
*Note: For digital copies of maps, charges and fees are the same with paper copies. However, Terms of Use
for Recipients of Electronic Data shall be conformed and signed by the Client.
ENERGY RESEARCH AND TESTING LABORATORY SERVICES (ERTLS)
DURATION
PROCESS (WORKING DAYS)
FROM TO
RAC- 5.5
ENERGY PERFORMANCE TESTING OF APPLIANCE AND RAC – 18 REF – 25.5
EQUIPMENT REF - 20 CW- 12.5
TV – 5
Staff, Treasury Division Payment of Testing fee 0.5 day Loc. 219 GF, DOE Annex Building
TV – 1 working day
SRS / SRA / Lab. Tech II, LATD Release of Test Report 0.5 day Loc. 291/283 LATL Building
LATD Building
0.5 day TL: 479-2900
Chief SRS, LATD Approval of Service Request Form Loc. 372/291/283
Staff, Treasury Division 0.5 day Loc. 219 GF, DOE Annex Building
Payment of Inspection fee
Chief SRS / Director, LATD Approval and signing of transmittal letter 3 days Loc. 291/372 LATL / ERTLS Building
Staff, Treasury Division Payment of Validation fee 0.5 day Loc. 219 GF, DOE Annex Building
SRS / SRA / Lab. Tech II, LATD Validation of Prototype Energy Label 1 day Loc. 291/283 LATL Building
Yes
No
0.5 day Loc. 291/283/305 LATL Building
Review / Recommendation Approval of
Senior SRS / Supervising SRS, LATD
Energy Label
TL: 479-2900
SRS / SRA / Lab. Tech, LATD Receipt of BPS Test Request Loc. 372/291/283 3F, NPTL Building
SRS / SRA / Lab. Tech, LATD Receipt of Test Report from 3rd party
laboratories
10 models / 1 day
1 day
SRS / SRA/ Lab. Tech, LATD Release of Approved Discussion of Results /
Released Signed Transmittal Letter
TL: 479-2900
Senior SRS/SRS II / SRS I Submission of Calibration Service Request Loc. 301/364 3F, NPTL Building
0.5 day
Checking / Functionality Check of Equipment for
Senior SRS/SRS II / SRS LAB. TECH. Calibration / Approval of OOP A. Electrical Instruments
1. DPM – 1.5 days (5 points per
parameter)
2. DMM – 1.5 days (5 points per
parameter)
Loc. 233 GF, DOE Annex Building
0.5 day 3. AC/DC Voltmeter – 1.5 days
Staff, Treasury Division Payment of Calibration fee*
(5 points per parameter)
4. AC/DC Ammeters – 1.5 days
(5 points per parameter)
SRS II / SRS I / Lab. Tech, LATD Conduct of calibration
5. Ohmmeter – 1.5 days (5 points
per parameter)
6. Resistors 1.5days (5 points per
parameter)
SRS II / SRS I, LATD Computation of Uncertainty of Measurement
2.5 days 7. Clamp Meter – 1.5 days (5
points per parameter)
B. Temperature Instruments
Preparation of Calibration Certificate 1. PRT – 2 days per 5 points
SRS II / SRS I, LATD
2. RTD – 2 days per 5 points
3. LIG – 2 days per 5 points
Review / Approval and signing of Calibration 4. Thermocouple – 2 days per 5
Chief SRS / Section Head, LATD Certificate points
1.5 day
Chief, Treasury Division Payment of Testing fee 0.5 day Loc. 233 GF, DOE Annex Building
TL: 479-2900
SRS/Lab. Tech, LATD Submission of Test Samples Extensions: LATL Building and Gonio
LOD: 305/394 photometer building
0.5 day
Staff, Treasury Division Pay Testing fee/Submit OR photo copy to LOD Treasury Div.: 233 GF, DOE Annex Building
Chief SRS / Director, ERTLS Approval and Signing of Transmittal Letter 3 days Loc. 374 ERL Building 1
TL: 479-2900
SRS/Lab. Tech, LATD Receiving of Test Samples Loc. 372/305/394 3F, NPTL Building
Payment of laboratory services fee 1 Loc. 233 GF, DOE Annex Building
Treasury Division
DURATION
PROCESS (WORKING DAYS)
FROM TO
Director, LS Variable
Attendance with OSG in court hearings
Chief, GLSD
TL: 4792900
Chief, General Legal • Upon Receipt of Sworn Complaint from HRD, prepare Loc. 332 ERL Building 3
Services Division (GLSD) Memorandum directing Respondent to Submit Counter 3
Affidavit
• Respondent submits Counter-Affidavit
• Determine the existence of prima facie case and Prepare 10
Investigation Report and/or Recommendation
7
OR
TL: 4792900
Loc. 332 ERL Building 3
Administrative Aide VI General Legal Verification from records on existing/pending cases and preparation
of the Certificate of No Pending Administrative Case
Services Division (GLSD)–
Legal Services (LS)
1 DAY
DISPOSITION OF INSPECTION INVESTIGATION REPORTS AFFECTING THE DOWNSTREAM OIL INDUSTRY
-Signs Orders
Director, LS -Returns signed Orders to Division Chief for Docketing and 1
Mailing
(15 Days)
RESOLUTION OF MOTION FOR RECONSIDERATION AFFECTING THE DOWNSTREAM OIL INDUSTRY
-Prepares Resolution/Decision
-Initials Resolution/Decision Loc. 404 ERL Building 3
Chief, Downstream Conventional Energy Legal 15
-Turns over Resolution/Decision to
Services Division (DCELSD)
Director for signature
-Signs Resolution/Decision
Director, LS -Returns signed Resolution/Decision to 2
Division Chief for Docketing and Mailing
TL: 4792900
Division Chief, Retail Marketing and Endorsement by the Division Chief of RMMSCD of the Loc. 376 3F, PNOC Building 5
Monitoring and Special Concerns Clearance Form
Division (RMMSCD)
Downstream Conventional Energy Receives Form Verification from DCELSD records re case Loc. 404 ERL Building 3
status of applicant 1
Legal Services Division (DCELSD),
Initials Clearance Form for signature of Legal Services
Legal Services (LS) Director
LS
2 DAYS
SPECIAL NON-IMMIGRANT VISA UNDER SECTION 47(a)(2) OT THE PHILIPPINE IMMIGRATION ACT OF 1940
AS AMENDED FOR COAL AND PETROLEUM OPERATIONS
RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT LOCATION OF OFFICE
OFFICE / UNIT (WORKING DAYS) NUMBERS
TL: 4792900
Loc. 343 4F, PNOC Building 6
Endorsement by Director of ERDB of the
Director, Energy Resources
request to the LS
Development Bureau (ERDB)
2 DAYS
Service Contract and Coal Operating Contract
2. Proof of Employment;
LS
3. Photocopy of Passport; and
4. Other Passport Details.
ENDORSEMENT TO THE SECURITIES AND EXCHANGE COMMISSION (SEC)
Contracts Division, LS Dry Seal and Release of the Endorsement to the Applicant
Upstream Conventional Energy Legal Evaluation of the request and verification on compliance
Services Division(UCELSD) with the terms and conditions of respective contracts.
Preparation of the Endorsement and Memorandum
LS
2 DAYS
REGISTRATION OF SUBCONTRACTS/AGREEMENTS FOR COAL AND PETROLEUM OPERATIONS
TL: 4792900
Endorsement by Director of ERDB of the Loc. 343 4F, PNOC Building 6
Director, Energy Resources
request to the LS
Development Bureau (ERDB)
LS
Department Circular No. DC2014-08-0013
Service Contract and Coal Operating Contract 3 DAYS
LEGAL EVALUATION FOR COAL AND PETROLEUM UNDER THE PHILIPPINE ENERGY CONTRACTING ROUND (PECR)
TL: 4792900
Loc. 403 ERL Building 3
Director, Legal Services (LS) Endorsement to the Upstream Conventional Energy Legal 1
Services Division (UCELSD)
TL: 4792900
Director, Energy Resources Endorsement by Director of ERDB of the request Loc. 343 4F, PNOC Building 6
Development Bureau (ERDB) to LS
Director, Legal Services (LS) Endorsement to the Upstream Conventional Energy Legal Loc. 403 ERL Building 3
Services Division (UCELSD) 1
2
Director, Legal Services (LS) Approval of the Memorandum and Endorsement
Endorsement to the Renewable Energy Legal Services Loc. 403 ERL Building 3
Director, Legal Services (LS) Division (RELSD) 1
LS
2. SEC-Certified True Copy of Certificate of Registration or Incorporation;
3. SEC-Certified True Copy of Articles of Incorporation and By-Laws; 3 DAYS
4. SEC Certified True Copy of General Information Sheet (GIS); and
5. Certificate of Authority from the Board of Directors.
FACILITATE INVESTMENTS
IN THE ENERGY SECTOR
FINANCIAL SERVICES (FS)
DURATION
PROCESS (WORKING DAYS)
FROM TO
PROCESSING OF BONDING/INSURANCE COMPANIES 3 2 Working Days per
ACCREDITATION accreditation
REMITTANCE OF GOVERNMENT SHARES ON 1 0.5
ENERGY RESOURCES PRODUCTION
PROCESSING OF BONDING/INSURANCE COMPANIES ACCREDITATION
Submission of Application
Office of the Director - FS Receive / Endorse application .5 hour TL: 4792900 2F, DOE Annex Building
Loc. 373
Fiscal Clerk III/Staff, CERCD Receive / Endorse application Loc. 248 2F, DOE Annex Building
1.5 hours
Submit remittance of
government shares on energy
resources production
Review remittance of service contractor and prepare Loc. 248 - CERCD 2F, DOE Annex Building
Senior Technical Audit Specialist remittance slip Loc. 431 - RERCD GF, DOE Building 2
Cashier, Treasury Division Issue Official Receipt Loc. 233 GF, DOE Annex Building
NOTE: For Conventional Energy Resource Compliance Division (CERCD) and Renewable Energy Resource Compliance Division (RERCD)
DURATION
PROCESS (WORKING DAYS)
FROM TO
Submission of Request
TL: 4792900
Walk-in/e-mail/ Address the request, Loc. 255/329 GF, DOE Annex Building
Phone-in/SMS
Post mail If can be done
promptly
Technical Research/Gathering
Of information 4.0
Staff
Submission of Request
Refer to concerned
Distribution Utility
Research/Gathering/
Technical Auditing of Electric Bill or
Site inspection/ 2
Staff preparation of report
Submission of Request
DURATION
(WORKING DAYS)
PROCESS
FROM TO
Submits
Letter or E-mail Request
TL: 4792900
Investment Specialist, IPS Coordinates with various concerned DOE units for the data (1/2 day) LOC. 389/371 GF, DOE Main Building
required
(1-2 days)
Prepares the requested data and submits to DOE-IPO
Technical Staff, Concerned Units