ELECTRICAL DATA SHEET


RATING
QUANTITY EQUIPMENT DESCRIPTION QUANTITY EQUIPMENT DESCRIPTION
Numeric Unit
A. Total Plant Load KVA G. Circuit Breaker
B. Power Generator Set KVA 5,000 Amperes
Continuous Stand by KVA 4,000 Amperes
Continuous Stand by KVA 3,200 Amperes
Continuous Stand by KVA 3,000 Amperes
Continuous Stand by KVA 2,500 Amperes
C. Transformer KVA 2,000 Amperes
Oil-Cooled Type Dry Type KVA 1,800 Amperes
Oil-Cooled Type Dry Type KVA 1,600 Amperes
Oil-Cooled Type Dry Type KVA 1,500 Amperes
Oil-Cooled Type Dry Type KVA 1,250 Amperes
Oil-Cooled Type Dry Type KVA 1,200 Amperes
Oil-Cooled Type Dry Type KVA 1,000 Amperes
Oil-Cooled Type Dry Type KVA 800 Amperes
D. Uninterruptible Power Supply (UPS) KVA 700 Amperes
UPS KVA 630 Amperes
UPS KVA 600 Amperes
UPS KVA 500 Amperes
UPS KVA 450 Amperes
E. Automatic Voltage Regulator (AVR) KVA 400 Amperes
AVR KVA 350 Amperes
AVR KVA 300 Amps down to 275 Amps
AVR KVA 250 Amps down to 225 Amps
AVR KVA 200 Amps down to 175 Amps
F. Electric Meter 150 Amps down to 125 Amps
Primary Meter 100 Amps down to 60 Amps
Sub-Meter 50 Amps down to 5 Amps

Prepared by: Noted by the enterprise owner/applicant:

Name, Signature and Official Seal of Professional Electrical Engineer (PEE) Name and Signature of owner or authorized representative

PRC Reg. No.:___________ Valid Until:_____________ T.I.N.__________________

PTR No.:________________ Issued on:_____________ Issued at:_______________ Designation

IMPORTANT REMINDERS:
1. All electriical equipment to be installed/operated on must be listed in this sheet, add similar sheets if necessary.
2. All pages must be signed and sealed by a Professional Electrical Engineer (PEE).
3. Incomplete requirements will not be received by this office and would delay the processing of permit application.