Liner Thickness ( লাইনার এর পুরুত্ব কম ) Bit Measurement ( লাইনার এর বিট সমস্যা ) Side up/down Liner Spot Liner Broken Angle Problem
Pre-assembly Final Quality Check Points:
1. Screw unmatched and alignment 2. Body & liner scratch and deform 3. Crossbar alignment and matching 4. Upper-down liner matching 5. Liner and side panel gap 6. Body fitting alignment 7. Liner thickness 8. All beam part 9. Back panel
Pu Foaming Quality Check Points:
1. Freezer & refrigerator inner liner lap / tap / broken 2. Thermostat & door switch point foam leakage 3. Left, Right & Front side panel tap 4. Front side & back side foam leakage 5. Liner-crossbar-side panel gap 6. Crossbar curve & down 7. Back panel lap / tap 8. Front panel tap 9. Liner air gap
Pre-assembly (Body Fitting) Check Points:
1. Evaporator pasting 2. Condenser & liner pasting 3. Ceiling and all fitting support check
Door foaming Check Points:
1. Door Channel (scratch, broken, thinness, measurement, discolor, spot)
2. Door Cape curve, scratch, broken, thinness, measurement, discolor 3. Door liner air gap 4. Channel foaming leakage, scratch, curve, broken 5. Stopper setting problem 6. Glass spots, scratch, broken
Post-assembly Final Check Points:
1. Door channel & glass (discolor, broken, scratch, spots) 2. (R/F) door Liner dent / scratch / lap 3. Door Switch Open 4. Door color unmatched 5. R/F door gasket (magnet / joint / bulging) 6. F/R door setting alignment check 7. Upper-Down door over gap 8. Door auto lock check 9. All crossbar & front panel (foam leakage / spots) 10. Thermostat (alignment / open) 11. Side panel & liner gap 12. Cross Bar & liner gap 13. Side panel (tap / scratch) 14. Lock & screw check Safety Performance Measure Check Points:
SL Item 195 Series 222 Series
Tim Conditio Range Conditio Range Time 01 ACW (Alternative 1s 1500 V 0.00- 1500 V 0.0-80. 1s Current Withstand) 80.mA mA 02 IR(Insulation 1s 500 V 1.0-0.0 500 V 1.0-0. 1s Resistance) MΩ MΩ 03 GB(Ground Bond) 2s 25 A 0-100 mΩ 25 A 0-100 2s mΩ 04 LC(Leakage Current) 2s 233 V 0-500 uA 233 V 0-500 uA 2s
05 Start 5s 180 V 0 .10- 180 V 0.10-5.0 5s
5.00A A 06 Power 8s 220 V 20-100 W 220 V 20-130 10 s W
2. High Voltage / Insulation Resistance / Defrost Check Fail 3. High pressure gas leakage capillary/ suction/filter tube 4. 85% Voltage Start / 100% Voltage Start Fail 5. No charging, wearing cover, water tray 6. Back part all electrical joint check 7. Back panel tap
1. Freezer part acceptable temperature -18 to -22, tolerance 3 2. Normal part acceptable temperature 5 to 10, tolerance 2 3. Thermostat position 3.5 4. Compressor run long time / open-stop frequency 5. Compressor not run / less cooling / big power 6. Door switch open & gasket gap 7. Light check 8. Sensor position check 9. AC cord connection check
Packing Final check points:
1. Door channel & glass (discolor, broken, scratch, spots) 2. (R/F) door Liner dent / scratch / lap 3. Door Switch Open 4. Door color unmatched 5. R/F door gasket (magnet / joint / bulging) 6. F/R door setting alignment check 7. Upper-Down door over gap 8. Door auto lock check 9. All crossbar & front panel (foam leakage / Spots) 10. Thermostat (alignment / open) 11. Side panel & Liner gap 12. Cross Bar & Liner gap 13. Side panel (tap / scratch) 14. Back panel (tap / foam spot) 15. Sticker (alignment / mistake) 16. Logo Missing / Barcode Missing 17. Door setting alignment Problem 18. Cork sheet mistake 19. Trolley unmatched 20. Door stopper (broken / alignment) 21. Top cover (broken / discolor) 22. Hinges cover matching 23. Door (stick / coated self / vegetable box & glass / door pocket / egg & ice tray / ice scraper / key & lock / guarantee card / bulb / lamp cover / thermostat knob / water bottle) check.
Tube bending quality cheek points:
1. Capillary block/sports/Long/sort/rust 2. Aluminum sheet sport 3. Section leak/block 4. Short piece leak 5. Welding joint leak 6. Bending problem 7. Section changes