You are on page 1of 8

Zero Distance

SMSC Product Documentation

Issue 3
SMSC Documentation For
Common Tasks

How many common SMSC


tasks are there?

The HedEx package for the SMSC


contains 5 common tasks.

1. Adding Number Segments

2. Adding an Other Operators' Number Segment

3. Adding an SP

4. Adding an MT Account

5. Configuring Multidimensional Schedule Strategies


SMSC Documentation
For Common Tasks

1. Adding Number Segments

If new number segments are required due to service


expansion in an area, the number segments need to be
added and related data needs to be set on the SMSC.
Otherwise, the users of the new number segments will fail
to send or receive SMs.

How do I add a number segment?

1. Scenario 2. Scenario Analysis 3. Operation Procedure

4. Operation Verification

How do I change or delete a


What do I do if the addition fails?
number segment?
SMSC Documentation For
Common Tasks

2. Adding an Other Operators' Number Segment

If other operators who exchange SMs with a local


operator add number segments, the data related to
the number segments must be configured on the
SMSC of the local operator. If the data is not
configured, the SMs that contain the number
segments may fail to be authenticated or the
routes of the SMs cannot be obtained.

How do I add an other operators' number segment?

1. Scenario 2. Scenario Analysis 3. Operation Procedure

4. Operation Verification

How do I change or delete an other


What do I do if the addition fails?
operators' number segment?
SMSC Documentation For
Common Tasks

3. Adding an SP

When an operator adds an SP, related data must


be configured on SMSCs. If the related data is not
configured, the SP cannot receive or send SMs
through the SMSCs.

How do I add an SP?

1. Scenario 2. Scenario Analysis 3. Operation Procedure

4. Operation Verification

How do I change or delete


What do I do if the addition fails? an SP?
SMSC Documentation
For Common Tasks

4. Adding an MT Account

An MT account is used by a maintenance engineer to


log in to the MT Server through the MT console of an
SMSC. After logging in to the MT Server, the
maintenance engineer can manage and maintain the
SMSC. For information security, it is recommended
that an MT account be used by only one
maintenance engineer.

How do I add an MT account?

1. Scenario
2. Scenario Analysis

3. Operation Procedure

4. Operation Verification

How do I change or
What do I do if the addition fails?
delete an MT account?
SMSC Documentation
For Common Tasks

5. Configuring Multidimensional Schedule Strategies

Multidimensional scheduling decides the


mechanisms for processing the SMs that fail to be
delivered. Each SM that fails to be delivered has
an error code. The SMSC uses schedules the SM
according to the multidimensional schedule
strategy corresponding to the error code.

How do I configure multidimensional


Schedule Strategies?

1. Overview 2. Operation Mechanism

3. Configuration Guide

What do I do if the configuration fails?


Information Bridge

You might also like