You are on page 1of 3
— z 7 Mle MINISTRY OF HEALTH | cerns Niicce, Miles. woserrat ExraNsiON PROVEC'S DOCUMENT TRANSMITTAL FORM (OTF) = Project: Design, Construction, Equipment, ‘Contract No: 120112012414 Fir nd Speradoealalionras the |e eh a 0 Sen Eninning”[ ATW Eg, aed Sah" Wt Wo SMe ALSABANGETO”[ REE DATE: 3. Decembar 4 : ome WERE SENONG ——euRWTTEDoR ——___[AeTONTAREN = Te | A-sopoed cr BA © nprvedan and Report [a 1) €-Appned wth comments oe 5 Wo fae ‘Test Certificate o a Tete o Bim io Sa conn BE re - ee : pacts [eats : at a ica oa rewanss Note, |e Use twoayers of Bitumen sf board as contract expansion gab s(SOmm). 2 Comply with onc requirement N SOFIiB Technics! Bate For inn Soba cot Horton Bure in general wth he reqitements of ho Fear ond Brih Shndord Codes of rots o led bow Mitr BiumenSoboard wd x «gre pupot expanse ot lar in cota nd wal onsen, ond 08 © protection board fe watroofng membranes heer Thickness 10 mm, 12. 19 (25 Shoot Size 2,20mx1,22m Cot Stipe 100 mm, 150 nm, 175 rm, 200 mm other wth to arr tect Date Conplos wih SSTRERNSTEERGISGISTHERSRSHEy Tt 25 [az 1909 8 Ce) Dio Specinon for rghwoy Woks a9: Clase 1015:1991 fpplon EF (eet cod SO0UC 13 “yplcol Taek Resuke (a 1142: Spectwent No. i | speciiciton eed reqed compres specien | _Avsoppind | Wear | 10 50% a protest kes aiNines | 121Nes: | 07-100NVo0t St Compression & Recovery eo (lst Nathod 800/¥.03.4) ‘The specimens ose complied wi the Weathering and Comprosion and Recovery Raqucenents “est suis on 12 men Thickness ~ Independently Tested by Namas cpproved leg laboatry *Sionger in UK" Recovery ater 31d Cycle of Compresion 80/82%. Tse! Tore Rasults 12 xm (B51 142) 965 3512 STAND. (alae sing | Noequronent Recovery rnin. 70% "Wot Abortion | ex 45% Density ‘nox 400 kg/m? [Mrtelcomn | Reveiome ont OFTBOARDS A A BITUMEN INTO Hunton EF and Huron Prolecton Boards are manuacued i the hgh! spectcatins, in qulty ond manuociing faites a Scondhnavc. Tey con be wed o mee! eer he mor! camanding of peeicfins ond willy pote! he wokproofing membrane fom the mov aggresive og bor material ‘As protection boord for membrane they play on intgal pat to the overall witerprooing spec "en, ensring fll protection ond thereby maining the neg ofthe wonorpoaieg eso, Hunton Bitumen Soltboards con be ved inal Expansion Jin ining roots. Hunton Bitumen Soliooards have bean used in hundede of presgious projects wacwide Tht High Perfomance Boards are supple by technical copable dbus tthe constuction Industry, throughout the word, Mojo project eceny supe ind Referencoe «Cho Lop Kok Iteatonal Airport Hong Kong = Introtional Apr = Extension Bohan « ALAWEIR Power Stoion Dba Dubatiterationa Aivpot Exenson Terminal 2 UAE < Trrsporation Rood imprverent Program (RP) Abu Dhabi © M25 loeon Orbit! Motorway ‘4 more detailed lst canbe provided by you locel dake. Should you requie adéiena nlm, tchicel ecice, or nlion dels leat contact yout local Disibulor ore Fron Strom Ie om "— SSS S252 532535352 53 2252223232 2 TE &

You might also like