Qbp-A1sA BAN - CEO01G

MINISTRY OF HEALTH
HOSPITAL EXPANSION PROJECTS

Shapoorji Pallonji Mideast (LL.C.)

DOCUMENT TRANSMITTAL FORM (DTF)


Project: Design, Construction, Equipment,
Contract No: 18/2011/2012-11 Furniture and Operational Maintenance for the
New Al Sabah Hospital
REV: 1
TO: Ministry of Health (MOH) ATTN: Eng. Hashim TRN.NO: MD/ALSABAH/13

FROM: JV AI DATE: 11-03-2015


Sager-Shapoorji Pallonji
Copy Distribution
Ministry of Health PM Consultant Other
WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN:
Documents
Approval A -Approved
Drawings/Sketch Review&Comments B-Approved as noted
C-Approved with comments
Report As Requested
Revise &Resubmit
Variation Information /Records Only D-Not Approved
E-Information Required,
Test Certificate nFor Necessary Action
Revise &Resubmit
Test Results
Other:
Sample
Other:

ltem Draws, Spec or BOQ Ref. Item Description of Submittal or Copies


No. Seq. Document Title
No.
Doc- 2207115/8 Part 2.1 A4 BOQ Water Proofing Works Sub-contractor 2 Copies
ref:l-47NAddendum1) Iterm 7.1
RECEVLU Submission of M/S AI Ghanim specialties Co. for
Waterproofing.Attached Al-Ghanim Specialities Co.
Profile with Experience Certificates and other legal
L 2 R 23
documents
¥R-5DP INEENRRO
PROEC
NVSEnder Name: AYMAN GOUDA Designation: PROJECT DIRECTOR Signed by Sender

Jointi:nture
************

*********************************
Received By Recipient Date Title
REMARKS

Action: B-Approved asnoted


M/s. Al-Ghanim Specialities Co. is approved as a Subcontractor for Waterproofing works subjecht8 fuff
complaeEThe Contract requirements.

516

RECEVED
9202 N
SIgtorynadet
Mau Rewislon' 3
Consultant PM OH
Date 4LSaba

COPIESO THT UConsultant PM Narendra-Deopu MOH(THE ENGINEER) Transmittal Cover Only


-SOPM|
INTENMATIORA
Corrections and comments made relative to submittals during this review do not relieve the Contractor fram compliance with the requirements of the contract documents. This check is only
Tor reviewOr general Comormance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for

confirmingand correlaungallquanties anddimensions selectingfabrication processes and techniques ofconstruction, coordinating hisworkwiththat of othertrades,
Document Transmittal Form Rev.2
Page 1of 1 Revision Date.12-Dec-13-