g [Mle ytsmyorvea
ramen [x22... HOSPITAL. EXPANSION PROJECTS
a eee
DOCUMENT TRANSMITTAL FORM (OTF)
z oor Project Osign, Construction, Eau
Contract No: 18/2011/2012-11 Protea Bpralonlwanonance forthe
= |
Se a na a
rn man
—_— |
3+ Comply with all contract requirements and documents and manufacturer's instructions@ mewror erm
EXPANSION PROJECTS.
Method Statement for Modular System
___wsuizor | “pave:anatsois | Rev. co | B00no, Seu nasweaapo0e ext ——|
Contract No: sazo¥s0%2i
Project: Design, Constuction Equpment, Future and
‘Operational Mantonence forth New Al Sabah Hosp
Design, Construction, Equipment, Furniture &
Operational Maintenance for the Expansion of New Al
Sabah Hospital for Ministry of Health, State of Kuwait
METHOD STATEMENT
FOR
FIRE STOP WORKS
Document No: SPML-NASH-MS-MQ-00006-Rev.1
38.01.2019 |—“rajeee Resident
Manager Engineer
Prepared by | Approved
Rev| Date
atc
Mst-pisn Bonne coves Kiwarren
rosea comeonrrcscrs
aa
‘Project: Design, Constuction, Equipment, Futur and
‘Operational Maintonanice forthe Rew AI Sabst Hopital
(eee oe
[TRNNO. MST.ALSASAH-M0005 Rev.0 Comments
Sie DFM Comment ‘ATC Compliance
1 | Fellow the approved mati of Administration of | Woted
omeureation and ares this transmital tothe
Supervision Constant
fe
ree tots (£E skrre )
LT1;T . binistRY OF HEALTH
sorisny Mideat aie, Ml MES.. wospIrat exeansion proseers
f “DOCUMENT TRANSMITTAL FORM (TF) j
| Contact No: s8/20112012-44 Fearon Ghrtcnl Sarasa ine
| Furniture nd Operational usintnsnce forthe
ew A Saban opt
TRANS. NOs METAL SABA omg | REVO
[Creme mcs Scien
[Cr/ Aeneas TT approved wt common
tomato asaya
eo
[Boner approned
10 Fier oa3M METHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES.
EE MirTHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES,
METHOD STATEMENT FOR FIRE
STOP WORKS
New Sabah Hospital Expansion Project3M. METHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES
CONTENT
1.0 OBJECTIVE
2.0 SCOPE
3.0. MATERIAL
4.0 TOOLS OF APPLICATION
5.0 APPLICATION METHOD
6.0 APPLICATORS
7.0 SAFETY3M METHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVI
1.0 OBJECTIVE
To define the method of closing the fre rated wallslab opening for mechanical
‘Services using fire stop materials to retain the itegrlty of ie barirs,
2.0 SCoPE
‘The gaps provided in the fre rated slab around mechanical services will be
sealed with fie resistant material,
3.0 MATERIAL
‘Anproved 3h fre stop material as recommended by the authorizes distibutor
1.3M™ Fire Barter IC 15WBe
Standard or Buk Caulk Gun
Rechargeable Caulk Gun
Putty Knife, Trowel or equivalent
Clean Tools wth water
Damming: mineral Woo!
2. 9M™ Intoram™ Utra GS
For Cutting: Utity Knife Industial Razor Blade Heavy Shears (Scissors)
For Applicaton: Filament Tape
3)
somes:
seb L
Ses3M. METHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES
Mimi STATEMENT FOR FIRESTOPVING MECHANICAL SERVICES,
4.3M™ Fire Barrier Mortar
‘Buckets/Mixing Containers
Power or Hand Mixing Tools, Sti Sticks, Trowel
Rigid Damming
5.0 Method:
‘A. The slab openings for Non motalic pipes size 2 inches and 4 inches to be
Sealed with Fit stopping sealant for the gap provided between the sleave
and the pipes.
8B. Pipe sleeves to be provided in slab penetration for drainage ripes, leaving a
‘G9p of 2" between the pipe and the sleeve.
C. Following procedure will be followed for sealing of the gap for diferent
') Non Metalic Pipes 2 Inches - The annular gap between the pipes and
sleeves fushed with the service will be filed up with mineral wool of
‘min 64 Kgim? and will be sealed with 3M IC 15WB Intumescent
sealant . The depth of sealant will be minimum?/2° (13 mm). For the
Pipe size2 Inch.
») Non Metalic Pipes 4 Inches: - The annular gap between the pipes
and sleeves will be filed up with 3 layers of 3M Ullra GS Wrap stip
‘around the pipe, remaining gap wil be filed with mineral woo! of min
64 Kain as backup, 3m Fire Barrier Mortar mixed witk water will be‘SM. METHOD STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES
SS METH0® STATEMENT FOR FIRESTOPPING MECHANICAL SERVICES,
Poured over the top to seal the Pipe opening Mortar Thickness is kept
0:3" minimum,
6.0 Applicators
All frestopping applicator to have completed training ccurses covering
installation of specified material by the authorized 3M dealer
7.0 Sefety:
Safety equipment ~ Hard hats, safety glasses, safety shoes, gloves and
‘veras to be wom at al times,